Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Resultats:2210 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1638 ]  
 
Comments on Reference model for centralized recovery     China Unicom   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1637 ]  
 
Clarifications on T-TSC in G.8275.1     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1636 ]  
 
Clarification on requirements in G.8271     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1635 ]  
 
Proposal of requirements for protection scheme in C 1632     Bharti Airtel Limited , China Unicom , Huawei Technologies Co., Ltd.   Q9/15   2016-02-01
[ 1634 ]  
 
Comments on latest draft of G.8271     Telefon AB - LM Ericsson   Q13/15   2016-02-01
[ 1633 ]  
 
Proposal to indicate the type of ePRTC/PRTC in the PTP messages     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q13/15   2016-02-01
[ 1632 ]  
 
Proposal of initial a new standardization for Port-based protection in OTN network     Bharti Airtel Limited , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15   2016-02-01
[ 1631 ]  
 
Proposal to study MPLS-TP service information model pruning and refactoring     China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Q14/15, Q10/15   2016-02-01
[ 1630 ]  
 
Proposal to restart working on G.8132 aligned with MPLS working group, IETF     China Mobile Communications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q9/15   2016-02-01
[ 1629 ]  
 
Proposal on draft outline of Recommendation G.8132     China Mobile Communications Corporation   Q9/15   2016-02-01
[ 1628 ]  
 
Proposal to study OTN data plane pruning and refactoring     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1627 ]  
 
CPRI over OTN phase 2 extension     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1626 ]  
 
Transparency of mapping of CPRI into OTN phase 2     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1625 ]  
 
Proposal on Hold-off timer     Electronics and Telecommunications Research Institute (ETRI) , ZTE Corporation   Q9/15   2016-02-01
[ 1624 ]  
 
CPRI over OTN phase 2 application update     China Mobile Communications Corporation , Huawei Technologies Co., Ltd.   Q11/15   2016-02-01
[ 1623 ]  
 
Proposed texts for G.808.3     ZTE Corporation   Q9/15   2016-02-01
[ 1622 ]  
 
Proposal of new section "8.4 Common interaction between architectural components" of G.cca     FiberHome Technologies Group   Q14/15, Q12/15   2016-02-01
[ 1621 ]  
 
Proposal of move section 8.5 to 9.3 of G.asdtn     FiberHome Technologies Group   Q14/15, Q12/15   2016-02-01
[ 1620 ]  
 
Performance monitoring in Sync OAM     China Mobile Communications Corporation , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15   2016-02-01
[ 1619 ]  
 
Proposal of new appendix about network migration of SDTN in G.asdt     China Mobile Communications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT)   Q14/15, Q12/15   2016-02-01
[ 1618 ]  
 
G.hn: Auto-Pairing mechanism     ZTE Corporation   Q18/15   2016-02-01
[ 1617 ]  
 
Revised proposal of multi-dimensional modulation format in G.Sup.39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1616 ]  
 
Revised Proposals about the Super-Nyquist DWDM in G.sup39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1615 ]  
(Rev.1) 
Consideration and proposal on PTP event message in FlexO IrDI  
C-1615 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
ZTE Corporation   Q13/15, Q11/15   2016-02-01
[ 1614 ]  
 
Consideration and proposal on overhead format of FlexO     ZTE Corporation   Q11/15   2016-02-01
[ 1613 ]  
 
Proposals about the scope of the G.metro     China Unicom , ZTE Corporation   Q6/15   2016-02-01
[ 1612 ]  
 
Considerations on overhead of FlexE aware client mapping method     ZTE Corporation   Q11/15   2016-02-01
[ 1611 ]  
(Rev.1) 
Frequency error test results - CPRI over ODU2r  
C-1611 Rev.1 adds Q13/15 as a destination Question. There is no change to the content of the Contribution.
 
IP Light   Q13/15, Q11/15   2016-02-01
[ 1610 ]  
 
EVM related results and proposal of G.698.2     China Unicom , ZTE Corporation   Q6/15   2016-02-01
[ 1609 ]  
 
Proposals about centralized recovery for SDN controlled transport network     China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1608 ]  
 
Application code proposal in G.metro     ADVA Optical Networking , China Unicom , Ericsson Canada, Inc. , Finisar Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q6/15   2016-02-01
[ 1607 ]  
 
Consideration of information between HEE and TEE in G.metro     China Unicom   Q6/15, Q14/15   2016-02-01
[ 1606 ]  
 
Proposal of parameters for G.654.E fibre category     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q6/15, Q5/15   2016-02-01
[ 1605 ]  
 
Short reach application codes and AWG requirement in G.metro     China Unicom , Ericsson Canada, Inc. , Finisar Corporation , ZTE Corporation   Q7/15, Q6/15   2016-02-01
[ 1604 ]  
 
Field trials and proposal of G.654 for terrestrial application     China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , OFS Fitel, LLC   Q6/15, Q5/15   2016-02-01
[ 1603 ]  
(Rev.1) 
The requirement of Yang module in MPLS-TP  
C-1603 Rev.1 adds Q14/15 as a destination Question. There is no change to the content of the Contribution.
 
FiberHome Technologies Group   Q14/15, Q10/15   2016-02-01
[ 1602 ]  
 
The consideration of interworking between OTUC1 and OTU4     FiberHome Technologies Group   Q11/15   2016-02-01
[ 1601 ]  
 
Proposal to the centralized restoration for G.asdtn and HRM     Ministry of Industry and Information Technology (MIIT)   Q9/15, Q14/15, Q12/15   2016-02-01
[ 1600 ]  
(Rev.1) 
The suggestion about multichannel parallel interfaces in B100G  
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
 
FiberHome Technologies Group   Q6/15, Q11/15   2016-02-01
[ 1599 ]  
 
Proposals to clause 7.3 of G.asdtn on multi-layer and multi-domain control     Ministry of Industry and Information Technology (MIIT)   Q14/15, Q12/15   2016-02-01
[ 1598 ]  
 
G.vlc: requirements on Data link layer per uplink mode     Ministry of Industry and Information Technology (MIIT)   Q18/15   2016-02-01
[ 1597 ]  
 
G.vlc: Simulation results on DCO-OFDM and ACO-OFDM     Ministry of Industry and Information Technology (MIIT)   Q18/15   2016-02-01
[ 1596 ]  
 
Proposed modification of ASTAP input on disaster management     Nippon Telegraph and Telephone Corporation (NTT)   Q17/15   2016-02-01
[ 1595 ]  
 
Test results and discussion of the EVM metrics     CAICT, P.R.China , ZTE Corporation   Q6/15   2016-02-01
[ 1594 ]  
 
Proposed description on MDRU size consideration     Nippon Telegraph and Telephone Corporation (NTT)   Q17/15   2016-02-01
[ 1593 ]  
 
100G system in-service OSNR monitoring and embedded OTDR test     AICT, P.R.China , China Mobile Communications Corporation , ZTE Corporation   Q6/15   2016-02-01
[ 1592 ]  
(Rev.1-2) 
Propose SG15 to start pre-research project on IMT2020 Mobile back haul and front haul network     Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation   Q6/15, Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2016-02-01
[ 1591 ]  
 
Promote the progress of G.MDSP to address operators' urgent needs     Ministry of Industry and Information Technology (MIIT) , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom   Q9/15   2016-02-01
[ 1590 ]  
 
Consideration in defining data model for transport network     Fujitsu Limited   Q14/15   2016-02-01
[ 1589 ]  
 
Consideration in progressing LTP and LP in for transport network     Fujitsu Limited   Q14/15   2016-02-01
Resultats:2210 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2016-09-28