Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Optical and other transport network infrastructures
Study Period 2005
Results:
170
total items.
Result page:
Previous
-
1
-
2
-
3
-
4
-
Next
Contributions
[ AI/Question: Q13/15 ]
Number
Title
Source
AI/Question
Filter...
Q11/15
Q12/15
Q14/15
Q3/15
Q6/15
Q9/15
QNEW/15
Clear filter
Date
[ 582 ]
Synchronization inputs in G.paclock
Semtech
Q13/15
2007-05-25
[ 581 ]
Scope of G.paclock
Semtech
Q13/15
2007-05-25
[ 580 ]
Wording for "Scope" in G.paclock
Semtech
Q13/15
2007-05-25
[ 579 ]
Proposal to keep SSM transport based upon IEEE802.3ah as an option
Tellabs Oy
Q13/15
2007-05-25
[ 578 ]
Addition of "Through Clock" for Synchronous Ethernet
Tellabs Oy
Q13/15
2007-05-25
[ 577 ]
Two-Way Protocols Test Cases in Appendix VI/G.8261
IL-MOC
Q13/15
2007-05-27
[ 576 ]
A New Appendix for Background Traffic Models Generation Examples
IL-MOC
Q13/15
2007-05-27
[ 575 ]
Modification for Test Case 7 of G.8261
IL-MOC
Q13/15
2007-05-27
[ 571 ]
G.paclock document structure
Zarlink
Q13/15
2007-05-25
[ 570 ]
G.paclock - editorial/clarifications
Zarlink
Q13/15
2007-05-25
[ 569 ]
G.paclock - Clause 5.7.4.1 - Phase discontinuity for EEC-Option 1
Zarlink
Q13/15
2007-05-25
[ 568 ]
G.paclock - Clause 5.7.3 - Phase response to input signal interruptions
Zarlink
Q13/15
2007-05-25
[ 567 ]
G.paclock - Figure 14
Zarlink
Q13/15
2007-05-25
[ 566 ]
Synchronous Ethernet - jitter requirements
Zarlink
Q13/15
2007-05-25
[ 565 ]
G.paclock - Clause 5.4.3 Jitter
Zarlink
Q13/15
2007-05-25
[ 564 ]
G.paclock - Clause 5.5.2 Jitter Tolerance
Zarlink
Q13/15
2007-05-25
[ 563 ]
Line timing in Synchronous Ethernet
Zarlink
Q13/15
2007-05-25
[ 558 ]
G.8261 Appendix IX Use Cases Transport Requirements
Nortel Networks (Canada)
Q13/15
2007-05-25
[ 557 ]
G.8261 Appendix IX clarifications
Nortel Networks (Canada)
Q13/15
2007-05-25
[ 517 ]
WITHDRAWN - See C495
N/A
Q13/15
N/A
[ 506 ]
Explanation of G.pacxyz structure for the scope chapter of the recommendations
Deutsche Telekom
Q13/15
2007-05-25
[ 505 ]
Synchronization signal and E-SSM path continuity
Cisco
Q13/15
2007-05-25
[ 504 ]
Option for E-OAM supporting E-SSM transmission
Cisco
Q13/15
2007-05-25
[ 500 ]
Proposals for EEC Network Limits (Clause 7.2.1 in G.8261)
Ericsson
Q13/15
2007-05-24
[ 499 ]
Proposals for EEC Jitter Limits in G.paclock
Ericsson
Q13/15
2007-05-24
[ 498 ]
Proposals for Appendix IX in G.8261
Ericsson
Q13/15
2007-05-24
[ 497 ]
Proposals for Test Cases in appendix VI in G.8261
Ericsson
Q13/15
2007-05-24
[ 496 ]
Proposals for clause 8.1 in G.8261
Ericsson
Q13/15
2007-05-24
[ 495 ]
Proposals for models in Appendix V in G.8261
Ericsson
,
Cisco
Q13/15
2007-05-24
[ 483 ]
Proposed structure for G.pacmod
Nortel
Q13/15
2007-05-24
[ 482 ]
Clarification to sections in current draft of G.paclock
Nortel
Q13/15
2007-05-24
[ 481 ]
Additional considerations for specification of STM-256 jitter in G.783 and G.825
Nortel
Q13/15
2007-05-24
[ 480 ]
SSM processing time considerations
Nortel
Q13/15
2007-05-24
[ 461 ]
Considerations in Sync Ethernet over OTN
Huawei Technologies Co., Ltd
Q13/15
,
Q11/15
,
Q9/15
2007-05-24
[ 460 ]
Consideration about the time requirement
Huawei Technologies Co., Ltd
Q13/15
2007-05-24
[ 450 ]
3GPP contributions addressing the need for a clarification of the synchronization requirement at the input of the base stations (for information)
France Telecom
Q13/15
2007-05-24
[ 449 ]
Proposal of transmission of a phase information using OAM messages
France Telecom
Q13/15
2007-05-24
[ 448 ]
G.Paclock - Split of the recommendation into two documents.
France Telecom
Q13/15
2007-05-24
[ 447 ]
Synchronous Ethernet SSM - list of issues
France Telecom
Q13/15
2007-05-24
[ 446 ]
Corrections in G.8261 latest draft
France Telecom
Q13/15
2007-05-24
[ 437 ]
G.paclock: proposal for jitter tolerance section 5.5.2
Alcatel-Lucent
Q13/15
2007-05-24
[ 436 ]
Influence of the SSM rate on the reconfiguration time
Alcatel-Lucent
Q13/15
2007-05-24
[ 435 ]
Proposal for modification of section 5.1 of G.paclock
Alcatel-Lucent
Q13/15
2007-05-24
[ 434 ]
Notion of skewness
Semtech
Q13/15
2007-05-25
[ 416 ]
Timing Requirements for packet-based methods
Semtech
Q13/15
2007-05-24
[ 415 ]
Metrics related to QoS and QoE related to timing
Semtech
Q13/15
2007-05-24
[ 414 ]
Traffic Models in G.8261 - Part 2
Semtech
Q13/15
2007-05-24
[ 413 ]
Traffic Models in G.8261 - Part 1
Semtech
Q13/15
2007-05-24
[ 402 ]
G.paclock Synchronisation Selection
BT plc
Q13/15
2007-05-24
[ 401 ]
Synchronous Ethernet - Synchronisation Status Message (SSM) Transport Requirements
BT plc
Q13/15
2007-05-24
Results:
170
total items.
Result page:
Previous
-
1
-
2
-
3
-
4
-
Next
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-6-7