International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 631 ]  
 
Proposed updates to preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1     United States of America     2015-06-10
[ 630 ]  
 
Issues relative to the coordination and notification of satellite frequency assignments     France , United Kingdom of Great Britain and Northern Ireland     2015-06-09
[ 629 ]  
 
Preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1 - Revisions to Annex 18, PDN Report ITU-R S.[R1.FSS]     United States of America     2015-06-10
[ 628 ]  
 
Modification (characteristics reduction) of a recorded assignment under Appendices 30 and 30A Regions 1 & 3 List     Israel (State of)     2015-06-10
[ 627 ]  
 
Reply to liaison statements from Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 1A     2015-06-09
[ 626 ]  
 
Proposed revision of Recommendation ITU-R SA.1277 - Sharing in the 8 025-8 400 MHz frequency band between the Earth exploration-satellite service and the fixed, fixed-satellite, meteorological-satellite and mobile services in Regions 1, 2 and 3     Viet Nam (Socialist Republic of)     2015-06-09
[ 625 ]  
 
FSS/BSS Interregional sharing in Appendix 30 (The limits in Section A3 of Annex 7 of Appendix 30)     Bulgaria (Republic of)     2015-06-09
[ 624 ]  
 
Study of the applicability of the FSS earth stations antennas reference patterns to small earth stations antennas     Bulgaria (Republic of)     2015-06-09
[ 623 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S 29.5-30.0/19.7-20.2 GHz] - Technical and operational guidelines for earth stations on mobile platforms communicating with geostationary space stations in the fixed-satellite service in the frequency bands 19.7-20.2 GHz and 29.5-30.0 GHz     Australia     2015-06-09
[ 622 ]  
 
Compatibility complemental assessment between EESS and potential new FSS allocations in the 13.25-13.75 GHz band for WRC-15 agenda item 1.6     China (People's Republic of)     2015-06-09
[ 621 ]  
 
Liaison statement on real-time transmission of flight data in the context of global flight tracking     Chairman, ITU-T FG AC     2015-06-08
[ 620 ]  
 
Proposal of modifications to the Section 8.2.1.4 of preliminary draft new Reports ITU-R S.[R1.FSS] and S.[R2R3.FSS]     Japan     2015-06-08
[ 619 ]  
 
Preliminary draft revision of Report ITU-R BO.2019 - Interference calculation methods     Japan     2015-06-08
[ 618 ]  
 
Proposed draft note to the Director of the Radiocommunication Bureau - Application of No 11.32A of the Radio Regulations     Japan     2015-06-08
[ 617 ]  
 
Proposed modifications to section 8.2.1.10.9 of preliminary draft new Report ITU-R S.[R1.FSS] - FSS (space-to-Earth) sharing with the EESS (active) in the 13.25-13.75 GHz frequency band     Japan     2015-06-08
[ 616 ]  
 
Proposal for modification on preliminary draft new Report ITU-R S.[FSS 7/8 GHz COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     Japan     2015-06-08
[ 615 ]  
 
Compatibility studies with the radio astronomy service operating in the bands 14.47-14.5 GHz and 15.35-15.4 GHz relevant to proposed methods to satisfy agenda item 1.6     Russian Federation     2015-06-05
[ 614 ]  
 
FSS (space-to-Earth) sharing with EESS (active) in the 13.25-13.75 GHz frequency band     Russian Federation     2015-06-05
[ 613 ]  
 
Proposals towards a preliminary draft new Report ITU-R S.[R1.FSS] - WRC-15 agenda item 1.6     Russian Federation     2015-06-05
[ 612 ]  
 
Proposed modifications to Annex 26 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[ESV] - Interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on terrestrial co-frequency stations     Iran (Islamic Republic of)     2015-06-02
[ 611 ]  
 
Working document towards the revision of Recommendation ITU-R S.1587-2     China (People's Republic of)     2015-05-29
[ 610 ]  
 
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6 - Lack of compatibility studies with the radio astronomy service operating in the bands 14.47-14.5 GHz and 15.35-15.4 GHz relevant to proposed methods to satisfy WRC-15 agenda item 1.6     WP 7D     2015-05-28
[ 609 ]  
 
Liaison statement to Working Party 4A - Comments on the preliminary draft new reports on compatibility between EESS (active) and proposed FSS (Earth-to-space) in the 13.25-13.75 GHz frequency range under WRC-15 agenda item 1.6     WP 7C     2015-05-27
[ 608 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth     WP 3M     2015-05-08
[ 607 ]  
 
Liaison statement to WP 1A (copy for information to WPs 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     WP 5D     2015-02-10
[ 606 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 4C for information) - Preliminary draft new Report ITU-R M.[ADS-B]     WP 5B     2014-12-17
[ 605 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C as responsible Groups for WRC-15 agenda item 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1 (Issues 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8), 10 (copy to Working Party 5D)     World Meteorological Organizaiton     2014-12-10
[ 604 ]  
 
Liaison statement to ITU-R Working Parties 4A and 4B (copy for information to Working Party 4C - WRC-15 agenda item 1.5)     WP 5B     2014-12-10
[ 603 ]  
 
Liaison statement to Working Party 5C (copied to Working Parties 4A, 4C, 5A, 7B and 7C) - Television broadcast receiving antenna pattern for use in sharing studies in the frequency range 470-862 MHz     WP 6A     2014-12-01
[ 602 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - New Report ITU-R F.2323 - Fixed service use and future     WP 5C     2014-11-28
[ 601 ]  
 
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Preliminary draft revision of Recommendation ITU-R F.758-5 - Systems parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference     WP 5C     2014-11-10
[ 600 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     WP 5A     2014-11-10
[ 599 ]  
 
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6     WP 5C     2014-11-07
[ 598 ]  
 
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.9.1     WP 5C     2014-11-07
[ 597 ]  
 
Liaison statement to Working Party 4A - SRS/FSS sharing in the 37.5-38 GHz band     WP 7B     2014-10-16
[ 596 ]  
 
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6     WP 7B     2014-10-16
[ 595 ]  
 
Liaison statement to Working Party 4A - PDN Report on WRC-15 agenda item 1.9.1     WP 7B     2014-10-16
[ 594 ]  
 
Liaison statement to Working Party 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D (for information)     WP 7B     2014-10-16
[ 593 ]  
 
Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2014-10-15
[ 592 ]  
 
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6     WP 7C     2014-10-15
[ 591 ]  
+Ann.1-38 
Report on the meeting of Working Party 4A - (Geneva, 2-10 July 2014)     Chairman, WP 4A     2014-07-11
[ 590 ]  
 
Final List of Participants - Working Party 4A (Geneva, 2-10 July 2014)     Director, BR     2014-07-11
[ 589 ]  
 
List of documents issued (Documents 4A/468 - 4A/589)     BR Study Group Department     2014-07-01
[ 588 ]  
(Rev.1) 
Draft CPM text on WRC-15 agenda item 7 - Possible method to mitigate excessive filings issue (Issue D)     Egypt (Arab Republic of)     2014-06-24
[ 587 ]  
 
Liaison statement to Working Parties 4A and 5C - WRC-15 agenda item 1.8     WP 4C     2014-06-30
[ 586 ]  
 
Preliminary draft new Report ITU-R S.[R1.FSS] - Compilation of proposed modification texts coming from Luxembourg contributions     Luxembourg     2014-06-25
[ 585 ]  
 
Proposed modification of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] and CPM text on WRC-15 agenda items 1.6.1 AND 1.6.2 - Compatibility studies related to the band 14.50-15.35 GHz between AMS and FSS (E-s)     Luxembourg     2014-06-25
[ 584 ]  
 
Proposed modification of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] and CPM text on WRC-15 agenda items 1.6.1 and 1.6.2 - Compatibility studies related to the band 13.40-13.75 GHz between SRS and FSS (E-s and s-E)     Luxembourg     2014-06-25
[ 583 ]  
 
Proposed modification of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] and CPM text on WRC-15 agenda items 1.6.1 and 1.6.2 - Compatibility studies related to the band 13.40-13.75 GHz between RLS, RNS and FSS (E-s)     Luxembourg     2014-06-25
[ 582 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Sanity check of the Report     Luxembourg     2014-06-25
Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16