International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 231 ]  
 
Initial evaluation of the 8 degree coordination arc between geostationary fixed-satellite service networks in 17.7-20.2 GHz and 27.5-30 GHz     United Kingdom of Great Britain and Northern Ireland , France , Germany (Federal Republic of) , Norway     2013-04-25
[ 230 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO E/S IN 29.5-30.0//19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7 - 20.2 GHz and 29.5 - 30.0 GHz     United Kingdom of Great Britain and Northern Ireland , France , Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway     2013-04-25
[ 229 ]  
 
Proposed changes to draft revision of Recommendation ITU-R S.1503-1     United Kingdom of Great Britain and Northern Ireland     2013-04-25
[ 228 ]  
 
Working document towards draft CPM text on WRC-15 Agenda item 9.1.5     International Civil Aviation Organization     2013-04-25
[ 227 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - Technical and operational characteristics of typical satellite communication links for potential use by UA Control and non-payload communication (CNPC) Agenda Item 1.5 (WRC15)     Germany (Federal Republic of)     2013-04-25
[ 226 ]  
 
Protection criterion for FSS in sharing studies related to Agenda item 1.5     Germany (Federal Republic of)     2013-04-25
[ 225 ]  
 
Proposal for liaison statement to Working Party 5D and Joint Task Group 4-5-6-7 - Suitable frequency ranges for IMT above 6 GHz     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2013-04-25
[ 224 ]  
 
Proposal for liaison statement to ITU-R Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2013-04-25
[ 223 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the GSO fixed-satellite service in Regions 2 and 3     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2013-04-25
[ 222 ]  
 
Working document on guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     United States of America     2013-04-25
[ 221 ]  
 
Working document on the guidelines that could be used by Administrations wishing to license airborne ESOMPs operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     United States of America     2013-04-25
[ 220 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5 - 30.0 GHz     United States of America     2013-04-25
[ 219 ]  
 
Working document - Technical and operational studies towards the preparation of a preliminary draft new Report regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service     United States of America     2013-04-25
[ 218 ]  
 
Feasibility of FSS/AMS/Mobile sharing in the frequency band 14.5-15.35 GHz     United States of America     2013-04-25
[ 217 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[RES756] - Studies on possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7     Canada     2013-04-24
[ 216 ]  
 
Proposed elements for the Director's Report related to the experience in the application of the Radio Regulatory procedures and other relates matters - Review of the provisions associated with the use of the band 15.4-15.7 GHz by the FSS (Earth-to-space and space-to-Earth)     Canada     2013-04-24
[ 215 ]  
 
Proposed modifications to the working document towards draft CPM text on WRC-15 Agenda item 1.7     Canada     2013-04-24
[ 214 ]  
 
Sharing study between FS and FSS (space-to-Earth) in the band 7 150-7 250 MHz     France     2013-04-24
[ 213 ]  
 
Sharing study between FSS (space-to-Earth) and SRS (Earth-to-space) in the band 7-8 GHz range     France     2013-04-24
[ 212 ]  
 
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range     France     2013-04-24
[ 211 ]  
 
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range     France     2013-04-24
[ 210 ]  
 
Protection of SRS near-Earth missions in highly elliptical orbits (HEO) from proposed FSS (space-to-Earth) emissions in the band 7 190-7 235 MHz     France     2013-04-24
[ 209 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     United States of America     2013-04-24
[ 208 ]  
 
Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 Agenda Item 1.7     United States of America     2013-04-24
[ 207 ]  
 
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - WRC Agenda item 1.5 WD PDNR [UAS-FSS] FSS assumptions and characteristics     United States of America     2013-04-24
[ 206 ]  
 
Modifications to Recommendation ITU-R S.1503-1     United States of America     2013-04-24
[ 205 ]  
 
Draft liaison statement to Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     United States of America     2013-04-24
[ 204 ]  
 
Working document towards a preliminary draft new Recommendation on a possible methodology for frequency sharing between fixed-satellite service networks comprising ubiquitously deployed earth stations and terrestrial services in adjacent areas     United States of America     2013-04-24
[ 203 ]  
 
Interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on co-frequency stations     United States of America     2013-04-24
[ 202 ]  
 
Further discussions on the Working Document towards a Preliminary Draft New Recommendation ITU-R S.[ALT.RAD.PTTRN]     United States of America     2013-04-24
[ 201 ]  
 
Working document - Draft CPM text related to Agenda item 9.1.2 -Size of the coordination arc for triggering coordination under RR No.9.7 between geostationary-satellite networks     United States of America     2013-04-24
[ 200 ]  
 
Working Document addressing consequences for late notification under RR No.11.49     United States of America     2013-04-24
[ 199 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     United States of America     2013-04-24
[ 198 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz range for the GSO fixed-satellite service in Region 1     United States of America     2013-04-24
[ 197 ]  
 
Working document on a framework for a Preliminary Draft New Recommendation for control and non-payload communication (CNPC) links of unmanned aircraft systems (UAS) in non- segregated airspace     United States of America     2013-04-24
[ 196 ]  
 
Liaison statement to Working Party 5B - Clarification of BR comment on FSS assignments - WRC-15 Agenda item 1.5     United States of America     2013-04-24
[ 195 ]  
 
Proposed updates to working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz compatibility] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     United States of America     2013-04-24
[ 194 ]  
 
Agenda Item 1.6 FSS deployment model     United States of America     2013-04-24
[ 193 ]  
 
WRC-15 Agenda item 1.6.1 - Estimation of probability of harmful interference to FS terrestrial stations from geostationary FSS satellites, considering additional primary allocation to GSO FSS (space-to-Earth) in the frequency band 14.8-15.35 GHz in Region 1     Russian Federation     2013-04-22
[ 192 ]  
 
WRC-15 Agenda item 1.6.1 - Estimation of interference to receiving FSS earth stations from emissions of a single transmitting FS terrestrial station, considering additional primary allocation to GSO FSS (space-to-Earth) in the frequency band 14.8-15.35 GHz in Region 1     Russian Federation     2013-04-22
[ 191 ]  
 
Draft liaison statement to ITU-R Working Party of the Special Committee - WRC-15 Agenda item 7     Russian Federation     2013-04-22
[ 190 ]  
 
Working document - Proposal to draft liaison statement to Working Party 5C - WRC-15 Agenda item 1.8 - To review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with Resolution 909 (WRC-12)     Russian Federation     2013-04-22
[ 189 ]  
 
Draft new Report "Assessment of the orbital-frequency resource occupied by a geostationary satellite communication system"     Russian Federation     2013-04-22
[ 188 ]  
 
Working document on the revision of the ITU-R Recommendations establishing the value of the criterion of the permissible interference between GSO satellite systems     Russian Federation     2013-04-22
[ 187 ]  
 
Working Document - Criterion for coordination necessity between FSS and BSS GSO networks sharing frequency bands 4/6, 11/12/13/14 and 20/30/40GHz     Russian Federation     2013-04-22
[ 186 ]  
 
WRC-15 Agenda item 1.6.1 - Estimation of probability of causing harmful interference to FS terrestrial stations from geostationary FSS under additional primary allocation to FSS (space-to-Earth) in frequency band 10.0-10.68 GHz in Region 1     Russian Federation     2013-04-22
[ 185 ]  
 
Working Document - Revision of the ITU-R Recommendation S.1432     Russian Federation     2013-04-22
[ 184 ]  
 
Proposals for modification of working document towards preliminary draft new report ITU-R [FSS 7/8 GHz COMPATIBILITY]     Russian Federation     2013-04-22
[ 183 ]  
 
Feasibility estimation for sharing between fixed satellite service (space-to-Earth) and fixed service in the frequency band 14.5-15.35 GHz     Russian Federation     2013-04-22
[ 182 ]  
 
Assessment of sharing feasibility of the fixed satellite service (space-to-Earth) in the frequency band 10.0-10.6 GHz with the radio astronomy service in the frequency range 10.6-10.7 GHz     Russian Federation     2013-04-22
Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16