International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF systems in the Fixed and Land Mobile Services

Results:603 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 253 ]  
 
Proposed revisions to draft text for the CPM Report Chapter 3 for WRC-12 agenda item 1.5     United States of America     2009-11-10
[ 252 ]  
 
Proposed changes to Annex 8 of the Working Party 5C Chairman's Report (Doc. 5C/217) - Working document towards a preliminary draft new Recommendations ITU-R F.[HAPS MODELLING] - Analysis of the impact of interference into haps gateway links from GSO FSS Earth-to-space links in the 5 850-6 725 MHz frequency band     United States of America     2009-11-10
[ 251 ]  
 
Proposed revisions to draft text for the CPM Report - WRC-12 Agenda item 1.5     Australia     2009-11-09
[ 250 ]  
 
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz     WP 4A     2009-10-14
[ 249 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 6A for information) - Harmonization on electronic news gathering in the satellite frequency bands     WP 4A     2009-10-14
[ 248 ]  
 
Liaison statement to Working Party 5C - Disposition of Recommendation ITU-R SF.675-2     WP 4A     2009-10-14
[ 247 ]  
 
Liaison statement to Working Party 5C - FSS Characteristics to be used for sharing studies in the 71-76 GHz and 81-86 GHz bands     WP 4A     2009-10-14
[ 246 ]  
 
Liaison statement to Working Party 5C - Radio nois in the HF frequency band     WP 1C   231/1   2009-10-13
[ 245 ]  
 
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19     WP 1B     2009-10-12
[ 244 ]  
 
Liaison statement - Further work on PLT     WP 1A   221-2/1   2009-10-09
[ 243 ]  
 
Liaison statement to Working Party 5C - Preliminary review of certain SF-series Recommendations     WP 4A     2009-10-05
[ 242 ]  
 
Liaison statement to Working Party 5C - Information for studies related to WRC-12 Agenda item 1.25     WP 4C     2009-10-05
[ 241 ]  
 
Interim Report on the Study Group 5 activity     Chairman, SG 5     2009-10-01
[ 240 ]  
 
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendations ITU-R SA.1275-2 and SA.1276-2     WP 7B     2009-09-29
[ 239 ]  
 
Liaison statement to ITU-R Working Parties 4A, 5A, and 5C on WRC-12 Agenda item 1.12     WP 7B     2009-09-29
[ 238 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 6B for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 7B     2009-09-29
[ 237 ]  
 
Liaison statement to Working Party 6B (copy to Working Party 5C for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering     WP 7B     2009-09-29
[ 236 ]  
 
Liaison statement to Working Party 5C - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz     WP 7B     2009-09-29
[ 235 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 5C for information) - Request for advice on parameters needed for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     WP 7B     2009-09-28
[ 234 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-12 Agenda item 1.24     WP 7B     2009-09-28
[ 233 ]  
 
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07))     WP 7C     2009-09-25
[ 232 ]  
 
Reply liaison statement to Working Party 5C - Information regarding studies under Question ITU-R 232-1/7     WP 7C   232/7   2009-09-25
[ 231 ]  
 
Liaison statement to Working Party 5C - WRC-12 Agenda item 1.20 - HAPS gateway links     WP 7D     2009-09-14
[ 230 ]  
 
Liaison statement to Working Party 5C - Sharing analysis between non-GSO meteorological satellite systems operating in the space-to-Earth direction and fixed service systems in the band 7 850-7 900 MHz     WP 7B     2009-09-14
[ 229 ]  
 
ABU views on WRC-12 Agenda items 1.4, 1.5, 1.10, 1.13, 1.14, 1.15, 1.19, 1.22, 1.25     Asia-Pacific Broadcasting Union (ABU)     2009-09-07
[ 228 ]  
 
Liaison statement - Report of the 1st meeting of the Focus Group on Future Networks (FG-FN)     Chairman, ITU-T Focus Group on FN     2009-07-28
[ 227 ]  
 
Result of the proposed suppression of Recommendation ITU-R SF.675     Chairmen, SGs 4 & 5     2009-07-27
[ 226 ]  
 
Result of the proposed suppression of certain F-series Recommendations     Chairman, SG 5     2009-07-16
[ 225 ]  
 
Liaison statement to ITU-R Working Parties 1B and 5A (copy to Working Parties 5B and 5C for information) - On the study of software-defined radio (SDR) and cognitive radio systems (CRS)     WP 5D     2009-07-06
[ 224 ]  
 
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C, 7D and Joint Task Group 5-6 - Development of a Handbook on propagation information for the prediction of interference and coordination distance     WP 3M     2009-06-18
[ 223 ]  
 
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendation ITU-R F.1335 - Technical and operational considerations in the phased transitional approach for bands shared between the mobile-satellite service and the fixed service at 2 GHz     WP 3M     2009-06-18
[ 222 ]  
 
Liaison statement to Working Party 4A on WRC-11 Agenda item 1.13 (copy to Working Party 5C and Working Party 6B)     WP 5A     2009-06-08
[ 221 ]  
 
Liaison statement to Working Party 1B on the study of software-defined radio and cognitive radio systems (copy for information to WPs 5B, 5C and 5D)     WP 5A     2009-05-28
[ 220 ]  
 
Liaison statement to Working Party 5C - Guidance to administrations in their bilateral/multilateral coordination/negotiations dealing with sharing between stations of fixed and/or land mobile services with stations of other terrestrial services operating in the neighbouring countries     WP 5A     2009-05-27
[ 219 ]  
 
Construction of the web page for the analytical list of the Study Group 5 Recommendations     Chairman, SG 5     2009-05-27
[ 218 ]  
 
Liaison statement to Working Party 5B (copy to Working Party 5C for information) - WRC-11 Agenda item 1.14     WP 5A     2009-05-27
[ 217 ]  
+Ann.1-20 
Report of the third meeting of Working Party 5C (Geneva, 18 - 27 May 2009)     Chairman, WP 5C     2009-05-27
[ 216 ]  
 
Final List of Participants - Working Party 5C (Geneva, 18-27 May 2009)     Director, BR     2009-05-27
[ 215 ]  
 
Liaison statement - Proection criteria and system parameters for fixed and mobile systems operating between 3 and 50 MHz     WP 5B     2009-05-25
[ 214 ]  
 
Reply Liaison statement to ITU-R Working Party 5C - Aircraft stations deployment scenario for simulation refinements for the derivation of a PDF mask for the protection of the fixed service in the 37-38 GHz band     WP 5B     2009-05-25
[ 213 ]  
 
List of documents issued     BR Study Group Department     2009-05-15
[ 212 ]  
 
Liaison statement to Working Party 5C (copy to WPs 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering     WP 6B     2009-05-14
[ 211 ]  
 
Liaison statement - Proposed revisions to Recommendations ITU-R M.1319-2, ITU-R M.1469-1, ITU-R M.1472, ITU-R M.1473, ITU-R M.1474 and ITU-R M.1471     WP 4C     2009-05-14
[ 210 ]  
 
Reply liaison statement to ITU-R Working Party 5B on studies related to WRC-11 Agenda item 1.15 (copy to Working Parties 5A, 5C and 7B and 7D for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications     WP 6A   240/5   2009-05-13
[ 209 ]  
 
Reply liaison statement to ITU-R Working Parties 5B and 5C (copy to Working Parties 5A, 7B and 7D for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications     WP 6A     2009-05-13
[ 208 ]  
 
Liaison statement to Working Party 5C - Progress on WRC-11 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 6A     2009-05-13
[ 207 ]  
 
Liaison statement to Working Party 5C - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 6A     2009-05-13
[ 206 ]  
 
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-11 Agenda item 1.13     WP 4A     2009-05-11
[ 205 ]  
 
Liaison statement to Working Party 5C - Information for studies related to WRC-11 Agenda item 1.25     WP 4C     2009-05-13
[ 204 ]  
 
Liaison statement to Working Party 5C - WRC-11 Agenda item 1.18     WP 4C     2009-05-13
Results:603 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-12-16