International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7C  C 

ITU-R WP7C

Remote Sensing Systems

Results:390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 140 ]  
 
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Request for input related to WRC-19 agenda item 1.15     WPs 3J, 3K and 3M   AI1.15   2017-03-31
[ 139 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING]     United States of America     2017-03-30
[ 138 ]  
 
Proposed update to the preliminary draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and the effects thereof     European Space Agency     2017-03-30
[ 137 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.1166-4 - Revision of performance and interference criteria for active spaceborne sensors     European Space Agency     2017-03-29
[ 136 ]  
 
New ITU-R Study Question on EESS (passive) sensor out of band rejection     United Kingdom of Great Britain and Northern Ireland     2017-03-29
[ 135 ]  
 
Proposed revision of preliminary draft revision of Report ITU-R RS.2310 - Worst-case interference levels from mainlobe-to-mainlobe antenna coupling of systems operating in the radiolocation service into active sensor receivers operating in the Earth exploration-satellite service (active) in the 35.5-36.0 GHz band     France     2017-03-29
[ 134 ]  
 
Correction of few inconsistencies detected in Recommendation ITU-R RS.2017     European Space Agency     2017-03-28
[ 133 ]  
 
Initial consideration on sharing between EESS (passive) and FS/MS above 275 GHz under agenda item 1.15     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI1.15   2017-03-28
[ 132 ]  
 
Proposed revision of the preliminary draft new Report ITU-R RS.[275-450 GHz CHARS]     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites     2017-03-28
[ 131 ]  
 
Proposed revision of Annex 11 to Working Party 7C Chairman's Report - Preliminary draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and the effects thereof     France     2017-03-28
[ 130 ]  
 
Preliminary draft new Report ITU-R RS.[275-450 GHZ CHARS] - Technical and operational characteristics of EESS (passive) instruments operating in 275 to 450 GHz frequency range     Korea (Republic of)     2017-03-28
[ 129 ]  
 
Working document toward a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS]     France     2017-03-28
[ 128 ]  
 
Proposed modifications of preliminary draft new Recommendation ITU-R RS.[ACTIVE_CHAR]     Russian Federation     2017-03-24
[ 127 ]  
 
Reply to the Note from Working Party 7C (copy to Working Party 1C) - Detection, reporting and resolution of radiofrequency interference to earth exploration-satellite service (passive) sensors     Director, BR     2017-03-23
[ 126 ]  
 
Draft liaison statement to Working Party 4C - Latest EESS-RNSS developments in Working Party 7C regarding preliminary draft new Recommendation ITU-R RS.[EESS_RNSS_METH]     United States of America   Q234/7, Q217/4   2017-03-21
[ 125 ]  
 
Revision to Annex 4: PDRR RS.1166     United States of America     2017-03-21
[ 124 ]  
 
Draft reply liaison statement to Working Party 1A regarding WRC-19 agenda item 1.15     United States of America   AI1.15   2017-03-21
[ 123 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and he effects thereof     United States of America     2017-03-21
[ 122 ]  
 
Preliminary draft new Report ITU-R RS.[275-450 GHZ CHARS] - Technical and operational characteristics of EESS (passive) and SRS (passive) instruments operating in 275 to 450 GHz frequency range     United States of America     2017-03-21
[ 121 ]  
 
Preliminary draft new revision to ITU-R RS.1263-1 "Interference criteria for meteorological aids operated in the 400.15 - 406 MHz and 1 668.4 - 1 700 MHz bands"     United States of America     2017-03-21
[ 120 ]  
 
Proposed method to progress preliminary draft new Recommendation ITU-R RS.[EESS-RNSS-METH]     United States of America     2017-03-21
[ 119 ]  
 
Preliminary draft new Report ITU-R RS.[VHF SOUNDER] - Results of sharing studies between a 45 MHz radar sounder and incumbent fixed, mobile, broadcasting and space research services operating in the 40-50 MHz frequency range     United States of America     2017-03-21
[ 118 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.1859-0 - Use of remote sensing systems for data collections to be used in the event of natural disasters and similar emergencies     United States of America     2017-03-21
[ 117 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.2042-0 - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz frequency band     United States of America     2017-03-21
[ 116 ]  
 
Preliminary draft new revision to ITU-R RS.1165-2 Technical characteristics and performance criteria for systems in the meteorological aids service in the 403 MHz and 1 680 MHz bands     United States of America     2017-03-21
[ 115 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.2017 - Performance and interference criteria for satellite passive remote sensing     United States of America     2017-03-21
[ 114 ]  
 
Preliminary draft revision of Recommendation ITU-R RS.1260 - Feasibility of sharing between active spaceborne sensors and other services in the range 420-470 MHz     United States of America     2017-03-21
[ 113 ]  
 
Proposed preliminary draft new Report - technical and operational characteristics of RF-based space weather sensors     United States of America   Q256/7   2017-03-21
[ 112 ]  
 
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 6 - Other radiocommunications systems for meteorological activities     World Meteorological Organization     2017-03-21
[ 111 ]  
 
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 5 - Passive and active spaceborne remote sensing for meteorological activities     World Meteorological Organization     2017-03-21
[ 110 ]  
 
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 4 - Meteorological Radars     World Meteorological Organization     2017-03-20
[ 109 ]  
 
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 3 - Meteorological Aids service     World Meteorological Organization     2017-03-20
[ 108 ]  
 
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 2 - Meteorological Satellite Service (MetSat)     World Meteorological Organization     2017-03-21
[ 107 ]  
 
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Introduction Preface - Chapter 1 and Annex 1     World Meteorological Organization     2017-03-21
[ 106 ]  
 
Preliminary position on WRC-19 agenda     World Meteorological Organization     2017-03-20
[ 105 ]  
 
Reply liaison statement to Working Party 7C - WRC-23 agenda item 2.2 regarding EESS (active) around the 45 MHz frequency region     Chairman, WP 3L     2017-03-15
[ 104 ]  
 
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...     WP 5D     2017-02-24
[ 103 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 102 ]  
 
Liaison statement to Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2016-12-13
[ 101 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services     WP 1A     2016-12-13
[ 100 ]  
 
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13     WP 5A   AI1.13   2016-11-23
[ 99 ]  
 
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range     WP 5A     2016-11-23
[ 98 ]  
 
Liaison statement to BWA External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15     WP 5A   AI1.15   2016-11-18
[ 97 ]  
 
Liaison statement to Working Parties 1A and 1B (copy for information to Working Parties 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use     WP 5A     2016-11-18
[ 96 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15     WP 5A   AI1.15   2016-11-18
[ 95 ]  
 
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz     WP 5C     2016-11-16
[ 94 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C and 7D (copy for information to Working Parties 3K and 3M) - WRC-19 agenda item 1.14     WP 5C   AI1.14   2016-11-16
[ 93 ]  
 
Liaison statement to Working Party 1A and IEEE (copy to Working Parties 3M, 5A, 7C and 7D for information) - Preliminary information on fixed service applications associated with work on WRC-19 agenda item 1.15     WP 5C   AI1.15   2016-11-16
[ 92 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 5C, 5D, 6A and 7C) - WRC-19 agenda items 1.6 and 9.1, issue 9.1.9     WP 7D   AI9.1, AI1.6   2016-11-01
[ 91 ]  
+Ann.1-21 
Report on the meeting of Working Party 7C (24-28 October 2016)     Chairman, WP 7C     2016-10-28
Results:390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-19