Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 140 ]
|
Reply liaison statement to Working Party 1A (copy to Working Parties 5A, 5C, 7C and 7D for information) - Request for input related to WRC-19 agenda item 1.15
|
WPs 3J, 3K and 3M
|
AI1.15
|
2017-03-31 |
|
[ 139 ]
|
Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING]
|
United States of America
|
|
2017-03-30 |
|
[ 138 ]
|
Proposed update to the preliminary draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and the effects thereof
|
European Space Agency
|
|
2017-03-30 |
|
[ 137 ]
|
Preliminary draft revision of Recommendation ITU-R RS.1166-4 - Revision of performance and interference criteria for active spaceborne sensors
|
European Space Agency
|
|
2017-03-29 |
|
[ 136 ]
|
New ITU-R Study Question on EESS (passive) sensor out of band rejection
|
United Kingdom of Great Britain and Northern Ireland
|
|
2017-03-29 |
|
[ 135 ]
|
Proposed revision of preliminary draft revision of Report ITU-R RS.2310 - Worst-case interference levels from mainlobe-to-mainlobe antenna coupling of systems operating in the radiolocation service into active sensor receivers operating in the Earth exploration-satellite service (active) in the 35.5-36.0 GHz band
|
France
|
|
2017-03-29 |
|
[ 134 ]
|
Correction of few inconsistencies detected in Recommendation ITU-R RS.2017
|
European Space Agency
|
|
2017-03-28 |
|
[ 133 ]
|
Initial consideration on sharing between EESS (passive) and FS/MS above 275 GHz under agenda item 1.15
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
AI1.15
|
2017-03-28 |
|
[ 132 ]
|
Proposed revision of the preliminary draft new Report ITU-R RS.[275-450 GHz CHARS]
|
European Space Agency
,
European Organisation for the Exploitation of Meteorological Satellites
|
|
2017-03-28 |
|
[ 131 ]
|
Proposed revision of Annex 11 to Working Party 7C Chairman's Report - Preliminary draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and the effects thereof
|
France
|
|
2017-03-28 |
|
[ 130 ]
|
Preliminary draft new Report ITU-R RS.[275-450 GHZ CHARS] - Technical and operational characteristics of EESS (passive) instruments operating in 275 to 450 GHz frequency range
|
Korea (Republic of)
|
|
2017-03-28 |
|
[ 129 ]
|
Working document toward a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS]
|
France
|
|
2017-03-28 |
|
[ 128 ]
|
Proposed modifications of preliminary draft new Recommendation ITU-R RS.[ACTIVE_CHAR]
|
Russian Federation
|
|
2017-03-24 |
|
[ 127 ]
|
Reply to the Note from Working Party 7C (copy to Working Party 1C) - Detection, reporting and resolution of radiofrequency interference to earth exploration-satellite service (passive) sensors
|
Director, BR
|
|
2017-03-23 |
|
[ 126 ]
|
Draft liaison statement to Working Party 4C - Latest EESS-RNSS developments in Working Party 7C regarding preliminary draft new Recommendation ITU-R RS.[EESS_RNSS_METH]
|
United States of America
|
Q234/7, Q217/4
|
2017-03-21 |
|
[ 125 ]
|
Revision to Annex 4: PDRR RS.1166
|
United States of America
|
|
2017-03-21 |
|
[ 124 ]
|
Draft reply liaison statement to Working Party 1A regarding WRC-19 agenda item 1.15
|
United States of America
|
AI1.15
|
2017-03-21 |
|
[ 123 ]
|
Preliminary draft revision of Recommendation ITU-R RS.1883 - Use of remote sensing systems in the study of climate change and he effects thereof
|
United States of America
|
|
2017-03-21 |
|
[ 122 ]
|
Preliminary draft new Report ITU-R RS.[275-450 GHZ CHARS] - Technical and operational characteristics of EESS (passive) and SRS (passive) instruments operating in 275 to 450 GHz frequency range
|
United States of America
|
|
2017-03-21 |
|
[ 121 ]
|
Preliminary draft new revision to ITU-R RS.1263-1 "Interference criteria for meteorological aids operated in the 400.15 - 406 MHz and 1 668.4 - 1 700 MHz bands"
|
United States of America
|
|
2017-03-21 |
|
[ 120 ]
|
Proposed method to progress preliminary draft new Recommendation ITU-R RS.[EESS-RNSS-METH]
|
United States of America
|
|
2017-03-21 |
|
[ 119 ]
|
Preliminary draft new Report ITU-R RS.[VHF SOUNDER] - Results of sharing studies between a 45 MHz radar sounder and incumbent fixed, mobile, broadcasting and space research services operating in the 40-50 MHz frequency range
|
United States of America
|
|
2017-03-21 |
|
[ 118 ]
|
Preliminary draft revision of Recommendation ITU-R RS.1859-0 - Use of remote sensing systems for data collections to be used in the event of natural disasters and similar emergencies
|
United States of America
|
|
2017-03-21 |
|
[ 117 ]
|
Preliminary draft revision of Recommendation ITU-R RS.2042-0 - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz frequency band
|
United States of America
|
|
2017-03-21 |
|
[ 116 ]
|
Preliminary draft new revision to ITU-R RS.1165-2 Technical characteristics and performance criteria for systems in the meteorological aids service in the 403 MHz and 1 680 MHz bands
|
United States of America
|
|
2017-03-21 |
|
[ 115 ]
|
Preliminary draft revision of Recommendation ITU-R RS.2017 - Performance and interference criteria for satellite passive remote sensing
|
United States of America
|
|
2017-03-21 |
|
[ 114 ]
|
Preliminary draft revision of Recommendation ITU-R RS.1260 - Feasibility of sharing between active spaceborne sensors and other services in the range 420-470 MHz
|
United States of America
|
|
2017-03-21 |
|
[ 113 ]
|
Proposed preliminary draft new Report - technical and operational characteristics of RF-based space weather sensors
|
United States of America
|
Q256/7
|
2017-03-21 |
|
[ 112 ]
|
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 6 - Other radiocommunications systems for meteorological activities
|
World Meteorological Organization
|
|
2017-03-21 |
|
[ 111 ]
|
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 5 - Passive and active spaceborne remote sensing for meteorological activities
|
World Meteorological Organization
|
|
2017-03-21 |
|
[ 110 ]
|
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 4 - Meteorological Radars
|
World Meteorological Organization
|
|
2017-03-20 |
|
[ 109 ]
|
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 3 - Meteorological Aids service
|
World Meteorological Organization
|
|
2017-03-20 |
|
[ 108 ]
|
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Chapter 2 - Meteorological Satellite Service (MetSat)
|
World Meteorological Organization
|
|
2017-03-21 |
|
[ 107 ]
|
Revision of the "Use of radio spectrum for meteorology: weather, water and climate monitoring and prediction" Handbook - Introduction Preface - Chapter 1 and Annex 1
|
World Meteorological Organization
|
|
2017-03-21 |
|
[ 106 ]
|
Preliminary position on WRC-19 agenda
|
World Meteorological Organization
|
|
2017-03-20 |
|
[ 105 ]
|
Reply liaison statement to Working Party 7C - WRC-23 agenda item 2.2 regarding EESS (active) around the 45 MHz frequency region
|
Chairman, WP 3L
|
|
2017-03-15 |
|
[ 104 ]
|
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means...
|
WP 5D
|
|
2017-02-24 |
|
[ 103 ]
|
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...
|
WP 1B
|
|
2016-12-14 |
|
[ 102 ]
|
Liaison statement to Working Parties 3J, 3K, 3M, 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15
|
WP 1A
|
AI1.15
|
2016-12-13 |
|
[ 101 ]
|
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services
|
WP 1A
|
|
2016-12-13 |
|
[ 100 ]
|
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13
|
WP 5A
|
AI1.13
|
2016-11-23 |
|
[ 99 ]
|
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range
|
WP 5A
|
|
2016-11-23 |
|
[ 98 ]
|
Liaison statement to BWA External Organizations (copy for information to Working Parties 1A, 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15
|
WP 5A
|
AI1.15
|
2016-11-18 |
|
[ 97 ]
|
Liaison statement to Working Parties 1A and 1B (copy for information to Working Parties 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use
|
WP 5A
|
|
2016-11-18 |
|
[ 96 ]
|
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 5C, 7C and 7D) - Preliminary information on land mobile service applications associated with work on WRC-19 agenda item 1.15
|
WP 5A
|
AI1.15
|
2016-11-18 |
|
[ 95 ]
|
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
|
WP 5C
|
|
2016-11-16 |
|
[ 94 ]
|
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C and 7D (copy for information to Working Parties 3K and 3M) - WRC-19 agenda item 1.14
|
WP 5C
|
AI1.14
|
2016-11-16 |
|
[ 93 ]
|
Liaison statement to Working Party 1A and IEEE (copy to Working Parties 3M, 5A, 7C and 7D for information) - Preliminary information on fixed service applications associated with work on WRC-19 agenda item 1.15
|
WP 5C
|
AI1.15
|
2016-11-16 |
|
[ 92 ]
|
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 5C, 5D, 6A and 7C) - WRC-19 agenda items 1.6 and 9.1, issue 9.1.9
|
WP 7D
|
AI9.1, AI1.6
|
2016-11-01 |
|
[ 91 ]
+Ann.1-21 |
Report on the meeting of Working Party 7C (24-28 October 2016)
|
Chairman, WP 7C
|
|
2016-10-28 |
Results:390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):