International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7C  C 

ITU-R WP7C

Remote Sensing Systems

Results:390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 240 ]  
 
Reply liaison statement to Working Party 5C (copy for information to Working Parties 3M, 4C, 5A, 5D, 7B, 7C and 7D) - WRC-19 agenda item 1.14     WP 4A   AI1.14   2018-03-21
[ 239 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1C and 7C ) - Standards for broadcasting-satellite receiving equipment     WP 4A     2018-03-21
[ 238 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 4B, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and 3M) - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)     WP 4A   AI1.10   2018-03-21
[ 237 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 5A, 5C, and 7C) - Aeronautical mobile service (AMS) technical characteristics in 21.2-22 GHz     WP 4A     2018-03-21
[ 236 ]  
 
Liaison statement to Working Party 7C - WRC-19 agenda item 1.6 and 9.1, issue 9.1.9     WP 4A   AI9.1   2018-03-21
[ 235 ]  
 
Liaison statement to Working Parties 4B, 4C, 5A, 5C, 7B and 7C - Studies relating to the use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by earth stations in motion communicating with geostationary space stations in the fixed-satellite service under WRC-19 agenda item 1.5     WP 4A   AI1.5   2018-03-21
[ 234 ]  
 
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Draft documents including draft CPM text related to WRC-19 agenda item 1.6, Resolution 159 (WRC-15)     WP 4A   AI1.6   2018-03-21
[ 233 ]  
 
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Studies relating to the bringing into use of frequency assignments to all non-GSO satellite systems, and consideration of a milestone-based deployment approach for non-GSO satellite systems in specific bands and services     WP 4A     2018-03-21
[ 232 ]  
 
Recommendation ITU-R F.699-8 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to 86 GHz     SG 5     2018-03-06
[ 231 ]  
 
Liaison statement on ITU inter-Sector coordination     ITU-T (TSAG)     2018-03-05
[ 230 ]  
 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems» regarding FSS/MSS/BSS     WP 4B     2018-02-23
[ 229 ]  
 
Liaison statement to Working Party 4B (copy to Working Parties 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding FSS/BSS     WP 4A     2018-02-20
[ 228 ]  
 
Reply liaison statement to Working Party 7A (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7C) - Study on Resolution 655 (WRC-15) "Definition of time scale and dissemination of time signals via radiocommunication systems" regarding RNSS systems     WP 4C     2018-02-20
[ 227 ]  
 
Liaison Statement to Working Party 1A (Copy for information to Working Parties 4A, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev.WRC-15) of the Radio Regulations     WP 4C     2018-02-19
[ 226 ]  
 
Reply liaison statement to Working Party 7C - Comments for the current version of the Preliminary Draft New Recommendation ITU-R RS.[EESS_SAR-RNSSS]     WP 4C     2018-02-19
[ 225 ]  
 
Note from Chairman of Working Party 4C to the Director, Radiocommunication Bureau (copy for information to RAG and Working Parties 4A, 4B, 5A, 7B, 7C) - Cost recovery for non-GSO satellite systems     Chairman, WP 4C     2018-02-16
[ 224 ]  
 
Liaison statement reply to ITU-R Working Party 5C (copied for information to Working Parties 3M, 4A, 4C, 5A, 7B, 7C and 7D) - WRC-19 agenda item 1.14     WP 5D   AI1.14   2018-02-12
[ 223 ]  
 
Cost recovery for non-GSO satellite systems     Director, BR     2018-01-08
[ 222 ]  
 
Liaison statement to Working Parties 1C, 4A and 7C - Standards for broadcasting-satellite receiving equipment     WP 1A     2017-12-12
[ 221 ]  
 
Reply liaison statement to Working Party 7C - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)     WP 5B   AI2.2   2017-12-12
[ 220 ]  
 
Liaison statement to Working Parties 5A, 5C, 7C and 7D on the preparations for WRC-19 agenda item 1.15 - Request for input as related to WRC-19 agenda item 1.15     WP 1A   AI1.15   2017-12-12
[ 219 ]  
 
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations     WP 1A     2017-12-12
[ 218 ]  
 
Liaison statement to CISPR and ITU-T Study Group 5 (copy for information to ITU-R Working Parties 1C, 4A, 4B and 7C) - Interference from broadcasting-satellite receiving equipment     WP 1A     2017-12-12
[ 217 ]  
 
Liaison statement to Working Parties 7C and 7D (copied to Working Party 5B for information) - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and active and passive services     WP 5A     2017-11-22
[ 216 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14     WP 5C   AI1.14   2017-11-22
[ 215 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz     WP 5C     2017-11-22
[ 214 ]  
 
Reply liaison statement to Working Party 7C (copied to Working Parties 5B and 5C for information) - Technical and operational characteristics for the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)     WP 5A   AI2.2   2017-11-21
[ 213 ]  
 
Reply liaison statement to Working Party 7C (copies to Working Parties 5A and 5B for information) - Technical and operational characteristics for fixed wireless systems operating within the 40-50 MHz frequency range (WRC-23 preliminary agenda item 2.2)     WP 5C   AI2.2   2017-11-21
[ 212 ]  
 
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)     WP 5B   AI1.10   2017-11-20
[ 211 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C and 7C - Aeronautical Mobile Service (AMS) technical characteristics in 21.2-22 GHz     WP 5B     2017-11-20
[ 210 ]  
 
Liaison statement to Working Parties 7C and 7D - Foreign Object Debris detection system operating in the band 92-100 GHz     WP 5B     2017-11-20
[ 209 ]  
 
Reply liaison statement to ITU-R Working Party 1A (copy for information to Working Parties 5C, 7C and 7D) - WRC-19 agenda item 1.15     WP 5A   AI1.15   2017-11-17
[ 208 ]  
 
Liaison statement to ITU-R Working Party 1A (copy to Working Parties 5A, 7C and 7D) - Input as related to WRC-19 agenda item 1.15     WP 5C   AI1.15   2017-11-17
[ 207 ]  
 
Preliminary draft new Report ITU-R RS.[SPACE_WEATHER_SENSORS] - Technical and operational characteristics of RF-based space weather sensors     World Meteorological Organization     2017-11-09
[ 206 ]  
 
Liaison statement to Working Parties 4C, 5A, 7B and 7C - WRC-19 agenda item 7, Issues H and I: Additional RR Appendix 4 data elements for non-GSO systems     WP 4A   AI7   2017-11-02
[ 205 ]  
 
Liaison statement to Working Parties 4C, 5A, 7B and 7C - Studies relating to the bringing into use of frequency assignments, and consideration of a milestone-based deployment approach for non-GSO satellite systems     WP 4A   AI7   2017-11-02
[ 204 ]  
 
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations     WP 4A     2017-11-01
[ 203 ]  
 
Reply liaison statement to Task Group 5/1 (copy to Working Parties 4C, 5B, 7B and 7C for information) - Reply to request for additional information on parameters in support of sharing and compatibility studies with IMT-2020     WP 4A     2017-11-01
[ 202 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7     WP 7B   AI1.7   2017-11-01
[ 201 ]  
 
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) «Definition of time scale and dissemination of time signals via radiocommunication systems»     WP 7A     2017-11-01
[ 200 ]  
+Ann.1-18 
Report of the meeting of Working Party 7C (Geneva, 25-31 October 2017)     Chairman, WP 7C     2017-11-01
[ 199 ]  
 
Final list of participants Working Party 7C (Geneva, 25-31 October 2017)     Director, BR     2017-10-30
[ 198 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 5A, 7C) - Foreign Object Debris (FOD) detection system operating in the band 92-100 GHz     WP 7D     2017-10-30
[ 197 ]  
 
Compatibility analysis between MetAids and SOS in the 403-406 MHz under agenda item 1.7     World Meteorological Organization   AI1.7   2017-10-19
[ 196 ]  
 
Compatibility studies between incumbent services and possible new allocations for the space operation service under WRC-19 AI 1.7     United Kingdom of Great Britain and Northern Ireland   AI1.7   2017-10-18
[ 195 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[SHORT DURATION NGSO - SHARING STUDIES] - Studies on the suitability of existing allocations to the space operation service below 1 GHz and additional sharing studies on possible new and/or upgraded allocations     United States of America   AI1.7   2017-10-11
[ 194 ]  
 
List of documents issued (Documents 7C/147 - 7C/194)     BR Study Groups Department     2017-10-24
[ 193 ]  
 
Liaison statement to ITU-R Working Party 7C (copy to ITU-R Working Parties 3L, 5A, 5B and 5C for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range     WP 6A     2017-10-24
[ 192 ]  
 
Liaison statement to Working Party 7C - Potential issues with the antenna parameters in Recommendation ITU-R RS.1861     WP 4A     2017-10-23
[ 191 ]  
 
Interference to passive sensors due to radiations - Impact of radiations from the if circuits of TV receiver equipment into EESS (passive) systems in the 1 400-1 427 MHz frequency band     European Space Agency     2017-10-18
Results:390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2021-01-19