Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP4B : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP4B  C 

UIT-R WP4B

Systèmes, interfaces radioélectriques, objectifs de qualité de fonctionnement et de disponibilité pour le SFS, y compris les applications IP et le reportage d'actualités par satellite

Resultats:140 documents
Résultats :  Précédent -  1 - 2 - 3
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 40 ]  
 
Final List of Participants - Working Party 4B     Director, BR     2004-10-07
[ 39 ]  
 
Guidance on the application of Recommendations falling under the responsibility of ITU-R Working Party 4B     Chairman, WP 4B     2004-10-04
[ 38 ]  
 
List of documents issued     BR Study Group Department     2004-10-01
[ 37 ]  
 
Proposed additional text to PDNR "Technical characteristics of Air interfaces for global broadband satellite systems"     Canada     2004-09-28
[ 36 ]  
 
Proposal for a new work item on reliable multicast protocols in IP-based satellite networks     France   263/4   2004-09-27
[ 35 ]  
 
Proposed modifications to the preliminary draft revision of Recommendation ITU-R S.579-5     France   73/4   2004-09-27
[ 34 ]  
 
Modifications to the preliminary draft new Recommendation on performance enhancements of transmission control protocol (TCP) over satellite networks     France   263/4   2004-09-27
[ 33 ]  
 
Liaison statement to ITU-R Working Party 4B - Methodology for deriving performance objectives and its optimization for IP packet data applications in the mobile-satellite service     WP 8D     2004-09-24
[ 32 ]  
 
End-to-End Quality of Service (QoS) model for broadband satellite IP networks     United States of America   263/4   2004-08-17
[ 31 ]  
 
Report of the special meeting of Working Party 4B (Melbourne, USA 12-15 July 2004)     Rapporteur, IP Over Satellite     2004-08-17
[ 30 ]  
+Ann.1-17 
Chairman's report on the seventeenth meeting of Working Party 4B (Geneva, 22-29 April 2004)     Chairman, WP 4B     2004-05-13
[ 29 ]  
 
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan     ITU-T SG 15     2004-05-12
[ 28 ]  
 
Final List of Participants - Working Party 4B     Director, BR     2004-04-28
[ 27 ]  
 
List of documents issued     BR Study Group Department     2004-04-21
[ 26 ]  
 
Preliminary draft new Recommendation - Technical characteristics of air interfaces for global broadband satellite systems     United States of America     2004-04-15
[ 25 ]  
 
Further application of new Recommendation ITU-R P.1623 to the prediction of availability on satellite digital paths operating above 10 GHz     United States of America     2004-04-15
[ 24 ]  
 
Re-categorization of ITU-R Questions assigned to Working Party 4B     Chairman, WP 4B     2004-04-15
[ 23 ]  
 
Liaison statement to ITU-R Working Party 1B and Working Parties 4A and 4B of Study Group 4     ITU-D Study Group 1     2004-04-07
[ 22 ]  
 
Working document towards a Draft New Recommendation on TCP/IP performance over satellite network     Brazil (Federative Republic of)     2004-04-07
[ 21 ]  
 
Revision to preliminary draft new Recommendation - Methods to enhance TCP/IP performance over satellite links     Japan   263/4   2004-04-07
[ 20 ]  
 
Development of an ITU-R Recommendation on spectrum requirements and technical and operational characteristics of user terminals for global broadband satellite systems     Spain   269/4   2004-04-05
[ 19 ]  
 
Proposal for a new Recommendation ITU-R SNG.uap - SNG carriers universal access procedure     World Broadcasting Unions     2004-03-30
[ 18 ]  
 
Recommendations to be brought to the attention of Working Parties 4A and 4B     Chairman, SG 4     2004-03-24
[ 17 ]  
 
Liaison statement on the ITU-T IP project     ITU-T SG 13     2004-02-25
[ 16 ]  
 
Liaison statement on NGN studies     ITU-T SG 13     2004-02-25
[ 15 ]  
(Rev.1) 
Liaison statement to ITU-R Working Party 4B - Examination of access technologies for broadband communications     ITU-D Rapporteur Group for Question 20-1/2     2004-02-23
[ 14 ]  
 
Liaison statement to the Chairman of ITU-R Study Group 4 and ITU-R Working Parties 4A and 4B - Satellite frequency allocations that could support the modernization of civil aviation telecommunication systems     WP 8D     2004-01-28
[ 13 ]  
 
Liaison statement to ITU-R Working Party 4B - Methodology for deriving performance objectives and its optimization for IP packet data applications in the Mobile-Satellite Service     WP 8D     2004-01-28
[ 12 ]  
 
Summary of results of RA-03, WRC-03 and CPM06-1     Chairman, SG 4     2004-01-19
[ 11 ]  
 
Liaison statement from Working Parties 3J and 3M - Propagation of optical signals on Earth-space paths     WPs 3J and 3M     2003-12-18
[ 10 ]  
 
Liaison statement to Working Parties 4B, 8A, 8F and 9B - New versions of the Access Network Transport (ANT) Standards overview and work plan     ITU-T SG 15     2003-11-11
[ 9 ]  
 
Liaison statement to ITU-R WP 4B - Reply to liaison statement on "Revision of Recommendation ITU-R S.1522"     ITU-T SG 15, Rapporteur Q.8/15     2003-11-07
[ 8 ]  
 
Liaison statement on Information Security Management System for Telecommunications     ITU-T SG 17     2003-10-07
[ 7 ]  
 
Liaison statement to Working Parties 4B, 6E, 8A, 8D, 8F, 9B and 9D - User and spectrum requirements for electronic news gathering     WP 6P   93/6, 89/6   2003-10-02
[ 6 ]  
 
Liaison statement to Working Parties 4B, 6E, 8A, 8D, 8F, 9B and 9D - Spectrum usage and operational characteristics of electronic news gathering systems - Proposed text for draft CPM06 Report Chapter 3 Section 3.2     WP 6P     2003-09-30
[ 5 ]  
 
Liaison statement to WPs 8F, 9D, 4B, 6E, 8A, 8D, 9B - User and spectrum requirements for electronic news gathering     WP 6P   93/6, 89/6   2003-09-29
[ 4 ]  
 
Liaison statement on the NGN 2004 ITU-T project     ITU-T SG 13     2003-08-25
[ 3 ]  
 
Liaison statement on the ITU-T IP project     ITU-T SG 13     2003-08-25
[ 2 ]  
 
Liaison statement - Consent of draft revised Recommendation G.827     ITU-T SG 13     2003-08-25
[ 1 ]  
 
Documents to be carried over from the 2000-2003 study period     WP 4B     2003-07-21
Resultats:140 documents
Résultats :  Précédent -  1 - 2 - 3  
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2020-12-17