Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 5 : Reunión 2018-09-11 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 5  C (2018-09-11) 

UIT-T SG 5

Environment, climate change and circular economy

Periodo de estudios 2017

Reunión  del 2018-09-11 al 2018-09-21

Lugar : Suiza [Ginebra]

Otras reuniones : 2021-11-30  2021-05-11  2020-10-19  2020-05-11  2019-09-16  2019-05-13  2018-05-21  2018-03-05  2017-11-13  2017-05-15 

Resultados :132 documentos
Resultados :  Anterior -  1 - 2 - 3
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 309 ]  
(Rev.1) 
Review of IEC 62368-1 varistor requirements for possible inclusion in K.77     Bourns Limited   Q2/5   2018-07-29
[ 308 ]  
(Rev.1) 
Draft ITU-T Recommendation L.SIB "Sustainable and intelligent building services"     Secretaría de Estado para la Sociedad de la Información y la Agenda Digital (Spain)   Q6/5   2018-07-26
[ 307 ]  
 
LTspice simulation of metal oxide varistors, MOVs, and the definition of an MOV     Bourns Limited   Q2/5   2018-07-23
[ 306 ]  
(Rev.1) 
The impact of ICTs in national adaptation and mitigation plans for climate change and the environment     Autorité Nationale de Régulation des Technologies de l'Information et de la Communication (ANRTIC) (Comoros)   Q9/5   2018-07-18
[ 305 ]  
 
Clauses applicable to external circuits in IEC 62368-1 Edition 3     Bourns Limited   Q2/5   2018-07-17
[ 304 ]  
 
EMF Measurement in Sudan     Telecommunications and Post Regulatory Authority (Sudan)   Q3/5   2018-07-17
[ 303 ]  
 
DC power interface surge analysis - tests 7.8 and 7.9 of K.20 and K.21     Bourns Limited   Q2/5   2018-07-13
[ 302 ]  
(Rev.1) 
Re-review of C261 (K.21 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 301 ]  
(Rev.1) 
Re-review of C244 (K.20 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 300 ]  
 
Re-review of C243 (K.44 contribution)     Bourns Limited   Q2/5   2018-07-06
[ 299 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 9: Proposal consolidation of C291 to C298     Bourns Limited   Q2/5   2018-07-05
[ 298 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 8: Updating K.44 for 400 V d.c. powering     Bourns Limited   Q2/5   2018-07-04
[ 297 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 7: Test circuit figure to replace K.44 Figure A.6.6-2, Figure A.6.6-1a and Figure A.6.6-1b.     Bourns Limited   Q2/5   2018-07-03
[ 296 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 6: Review of 7.8 and 7.9 test entries (K.20 and K.21)     Bourns Limited   Q2/5   2018-07-03
[ 295 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 5: Review of DC power feed surge test figures of Table 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-02
[ 294 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 4: DC power feed tests of Tables 1a and 1b (K.20, K.21 and K.45)     Bourns Limited   Q2/5   2018-07-01
[ 293 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 3: Powering supply configurations     Bourns Limited   Q2/5   2018-06-30
[ 292 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part 2: Grid terms review     Bourns Limited   Q2/5   2018-06-30
[ 291 ]  
 
Testing equipment-powering ports that are not connected to the AC mains supply - Part1 Background     Bourns Limited   Q2/5   2018-06-29
[ 290 ]  
 
Proposed new work item on Opportunities of the Circular Economy of E-waste management     Rwanda , Senegal   Q7/5   2018-06-28
[ 289 ]  
(Rev.1) 
Proposed new work item on Adequate Assessment and Sensitization on the Impact of Counterfeit Electronics Products on the environment in Africa     Kenya , Rwanda , Tanzania , Uganda   Q7/5   2018-06-28
[ 288 ]  
 
Regional e-waste management strategy for the East African Region     Kenya , Rwanda , Uganda   Q7/5   2018-06-28
[ 287 ]  
 
End of life Management (EoL) management of communications equipment and products     Uganda Communications Commission (UCC)   Q7/5   2018-06-28
[ 286 ]  
 
Social aspects in the management of e-waste     Ministry of Communications and Information Technology (MCIT) (Egypt)   Q7/5   2018-06-28
[ 285 ]  
 
The Role of Policy, Regulations, Standards in E-Waste Management (Case Study Rwanda)     Rwanda   Q7/5   2018-06-28
[ 284 ]  
 
Extended producer responsibility in developing countries and countries with economies in transition     Uganda Communications Commission (UCC)   Q7/5   2018-06-28
[ 283 ]  
 
Smart Technology for Smart & Sustainable Agriculture in the Arab Region     Arab Information and Communication Technology Organization (AICTO)   Q9/5   2018-06-27
[ 282 ]  
 
Comparison of accreditation standards for e-waste recyclers     Ministry of Communications and Information Technology (MCIT) (Egypt) , Palestine Technical University Kadoorie (State of Palestine) , Sudan   Q7/5   2018-06-27
[ 281 ]  
 
Proposed new work item on Sustainable management of batteries resulting from ICT equipment Sustainable management of batteries resulting from ICT equipment     Kenya , Ministry of Communications and Information Technology (MCIT) (Egypt) , Palestine Technical University Kadoorie (State of Palestine) , Sudan , Uganda Communications Commission (UCC)   Q7/5   2018-06-27
[ 280 ]  
 
Experimental Pilot Plant on e-Waste for Smart Cities based on the circular economy     Argentina   Q7/5   2018-06-26
[ 279 ]  
 
Electromagnetic field measurements to assess human exposure for 5G (IMT 2020) base station     Agencia Nacional del Espectro (ANE) (Colombia)   Q3/5   2018-06-26
[ 278 ]  
 
Integration of K-series ITU T Recommendations for the regulation of compliance with electromagnetic field exposure levels in the Republic of Colombia     Agencia Nacional del Espectro (ANE) (Colombia)   Q3/5   2018-06-26
Resultados :132 documentos
Resultados :  Anterior -  1 - 2 - 3  
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-6-7