Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :222 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
Contribuciones  [ AI/Cuestión: Q9/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 1015 ]  
 
Consideration on the interconnected link at the domain boundary     China Unicom , Huawei Technologies Co. Ltd. , ZTE Corporation   Q9/15   2014-11-11
[ 1014 ]  
 
Consideration on the Back-to-Back interconnection scenarios of G.MDSP     China Unicom   Q9/15   2014-11-11
[ 1013 ]  
 
Requirement of one to one and bidirectional switching protection of optical layer     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2014-11-11
[ 1011 ]  
 
Proposal of left questions in G.873.1 Amendment 1     China Unicom , Huawei Technologies Co. Ltd.   Q9/15   2014-11-11
[ 972 ]  
 
G.8031/Y.1342 - 1:1 Unidirectional Ethernet Protection Switching to Support Dual parenting PON Protection     British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 971 ]  
 
ODU SMP High Order Signalling Option     Alcatel-Lucent USA Inc.   Q9/15   2014-11-10
[ 948 ]  
 
Status Summary for ODU SMP Protocols     Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 947 ]  
 
Proposed Text for G.odusmp     Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 943 ]  
 
High level description of a protection solution using dual parented type B (TDM/TDMA) PON     British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 942 ]  
 
ODU SMP 1-Stage Protocol     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2014-11-10
[ 941 ]  
 
Multi-frame Calculation for ODU SMP Proposal     Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 938 ]  
 
Proposed DNI solution for Ethernet linear protection in G.mdsp     Huawei Technologies Co. Ltd.   Q9/15   2014-11-10
[ 920 ]  
 
Proposal of Configuration Management for G.8131     China Mobile Communications Corporation   Q9/15, Q14/15   2014-11-10
[ 908 ]  
 
clarification of protected domain an protected subnetwork for G.MDSP     FiberHome Technologies Group   Q9/15   2014-11-10
[ 907 ]  
 
Recovery scenario consideration in G.msdp     FiberHome Technologies Group   Q9/15   2014-11-10
[ 906 ]  
 
Ethernet ring DNI function model for MDSP     FiberHome Technologies Group   Q9/15   2014-11-10
[ 905 ]  
(Rev.1) 
Considerations about vertical links between interconnected nodes     FiberHome Technologies Group   Q9/15   2014-11-10
[ 860 ]  
(Rev.1) 
Study points of intelligent data plane recovery based on centralized controller     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15, Q14/15, Q12/15   2014-11-09
[ 835 ]  
 
Trail protection support in MPLS-TP linear protection     Fujitsu Limited   Q9/15, Q10/15   2014-11-07
[ 791 ]  
 
Format of APC specific information in G.8131     Korea (Rep. of)   Q9/15   2014-11-04
[ 789 ]  
 
Technical comments on G.873.2     Korea (Rep. of)   Q9/15   2014-11-04
[ 754 ]  
 
Monitoring models for G.8031 protected domain with DNI to support two failures in G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 752 ]  
 
Discussion of transfer time and DRNI for G.mdsp     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 741 ]  
 
Comments on latest G.MDSP Living List     Alcatel-Lucent France   Q9/15   2014-03-11
[ 740 ]  
 
Comments on latest G.MDSP draft     Alcatel-Lucent France   Q9/15   2014-03-11
[ 738 ]  
 
Proposal for Interoperation ability for ODU SMP     China Mobile Communications Corporation   Q9/15   2014-03-11
[ 732 ]  
 
Discussions of Proposed draft text for G.8131     China Mobile Communications Corporation   Q9/15   2014-03-11
[ 723 ]  
 
Considerations on independence of each single protection switching in G.MDSP     China Unicom   Q9/15   2014-03-11
[ 708 ]  
 
Proposal of starting a new work item or modify the existing recommendations on optical layer protection     China Unicom , FiberHome Technologies Group   Q9/15   2014-03-11
[ 688 ]  
 
Optical layer protection requirement of Metro DWDM system     China Unicom , Ericsson Canada, Inc.   Q9/15   2014-03-11
[ 684 ]  
 
Editorial comments on draft G.8131     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 683 ]  
 
Proposed text for Clause 9.3 of draft G.8131     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2014-03-11
[ 681 ]  
 
China Comments and Proposals for C0441 "draft text of G.8131"     Ministry of Industry and Information Technology (MIIT)   Q9/15   2014-03-11
[ 672 ]  
 
Proposals for the function model of G.mdsp     Ministry of Industry and Information Technology (MIIT)   Q9/15   2014-03-11
[ 661 ]  
 
Operation of One-Stage ODU SMP Protocols over B100G links     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2014-03-10
[ 655 ]  
 
Proposal to consent a revision to Recommendation G.8131     SK Telecom   Q9/15   2014-03-10
[ 623 ]  
(Rev.1) 
1-stage and 2-stage Re-definition in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 622 ]  
 
Message Encoding Set Update for ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 621 ]  
 
1-stage ODU SMP Protocol     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 620 ]  
(Rev.1) 
APS Mechanisms in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 619 ]  
 
Proposed functional models in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 618 ]  
 
Interconnection solution for Ethernet linear protection in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 604 ]  
 
Considerations on control plane derived from G.8080 for G.ODUSMP     China Unicom   Q9/15   2014-03-10
[ 580 ]  
 
Consideration about a requirement for consistency of switching action in G.mdsp     ZTE Corporation   Q9/15   2014-03-10
[ 579 ]  
 
A proposed protection mechanism for a failure use case in G.MDSP     ZTE Corporation   Q9/15   2014-03-10
[ 570 ]  
(Rev.1) 
consideration of recovery network sinario in MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 569 ]  
 
Different switching types in each domain of MDSP     FiberHome Technologies Group   Q9/15   2014-03-10
[ 568 ]  
(Rev.1) 
Consideration of Network Objectives in the latest draft of G.mdsp     FiberHome Technologies Group   Q9/15   2014-03-10
[ 543 ]  
 
Proposed architecture for MPLS-TP linear protection     Fujitsu Limited   Q9/15   2014-03-10
[ 542 ]  
 
2-stage ODU SMP protocol operation in beyond 100G networks     Coriant GmbH & Co. KG   Q9/15   2014-03-09
Resultados :222 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-5-29