International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:170 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  [ AI/Question: Q12/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1200 ]  
 
Withdrawn by TSB (superseded): See C-1297, "Considerations on G.800 style ETH transport processing functions in draft revised G.8010"     Huawei   Q12/15   2011-01-31
[ 1198 ]  
 
Proposed text for clauses 6.3.4.5.2 to 6.3.4.5.6 in draft revised G.8010     Huawei   Q12/15   2011-01-31
[ 1174 ]  
 
Evolution of G.8011 Ethernet Services     Ericsson Canada   Q12/15, Q10/15   2011-01-31
[ 1171 ]  
 
Comments on G.8010 Amendment 2     Ericsson Canada   Q9/15, Q12/15   2011-01-31
[ 1169 ]  
 
Proposal to align G.8021 with IEEE 802.1Q ingress VID filtering     Ericsson Canada   Q9/15, Q12/15   2011-01-31
[ 1167 ]  
 
PBB model for G.8021 & G.8010     Ericsson Canada   Q9/15, Q14/15, Q12/15   2011-01-31
[ 1143 ]  
(Rev.1) 
MPLS-TP Standards     United Kingdom   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1124 ]  
 
Structure and content of the MPLS-TP Recommendations     CMCC,CT , CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1123 ]  
 
Associated Channel Type for G.tpoam     CMCC, CT,CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1097 ]  
 
ODUflex resizing and multi-carrier applications     Deutsche Telekom   Q12/15, Q11/15   2010-05-24
[ 1025 ]  
 
Clarification on ODU Multiplexing     AT&T   Q13/15, Q12/15   2010-05-20
[ 1023 ]  
 
Transitional Link Study Points     Tellabs   Q12/15   2010-05-20
[ 1022 ]  
 
Model for the All Optical Network     Tellabs   Q12/15   2010-05-20
[ 945 ]  
 
OTN topological architecture model and components     Huawei   Q9/15, Q12/15   2010-05-19
[ 944 ]  
 
Proposal of extending solution for temporal and hitless pass segment monitoring and sending liaison to IETF     NTT   Q12/15, Q10/15   2010-05-19
[ 938 ]  
 
Comments on the terms and definitions in G.8010     Hitachi   Q12/15   2010-05-18
[ 926 ]  
 
Comments on revised G.8110.1     Fujitsu   Q12/15   2010-05-18
[ 825 ]  
 
Requirement for multi stages multiplex/demultiplex configuration     China Telecom , China Mobile , China Unicom , ZTE   Q9/15, Q14/15, Q12/15   2010-05-17
[ 817 ]  
 
Comments on Transitional Link Study Points     Huawei   Q12/15   2010-05-16
[ 789 ]  
 
Concern with G.ptneq & E-OTN     Canada   Q9/15, Q12/15   2010-05-14
[ 761 ]  
 
OTUk-AIS used for OTN alarm suppression     Ericsson   Q9/15, Q12/15, Q11/15   2010-04-29
[ 754 ]  
 
Transitional Links and Resource allocation     Ciena Corporation   Q12/15   2010-04-28
[ 717 ]  
 
ODU TCM Layer for OTN Auto-discovery as defined in G.7714.1     Alcatel-Lucent   Q14/15, Q12/15   2009-09-20
[ 702 ]  
 
Description of Transparency in G.800     Huawei Technologies   Q12/15   2009-09-20
[ 683 ]  
 
G.800 Transport Entities     Huawei Technologies   Q12/15   2009-09-20
[ 620 ]  
 
Proposed of 3R regeneration in G.872     Deutsche Telekom   Q12/15   2009-09-20
[ 619 ]  
 
OCh definitions in G.872     Deutsche Telekom   Q12/15   2009-09-20
[ 592 ]  
 
Proposal of definition of maintenance points (MEP and MIP)     NTT   Q12/15, Q10/15   2009-09-18
[ 587 ]  
 
Further consideration about subnetwork blocking resource management in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 586 ]  
 
Consideration on ODUflex resizing     ZTE Corporation   Q14/15, Q12/15, Q11/15   2009-09-18
[ 583 ]  
 
Proposals to consider resource sharing in G.8080     ZTE Corporation   Q12/15   2009-09-18
[ 494 ]  
 
Transitional Links as SNPP Links     Nortel Networks (Canada)   Q12/15   2009-09-17
[ 467 ]  
 
Proposal to introduce multi-granularity in photonic cross-connect switching in AON/WSON     NTT   Q12/15   2009-09-16
[ 460 ]  
 
Proposed modification for G.8121 and consideration of Ethernet as MPLS-TP client     Fujitsu   Q9/15, Q14/15, Q12/15, Q10/15   2009-09-16
[ 453 ]  
 
Considerations on the description of the ODU layer network in G.872 and G.8080     Huawei Technologies   Q14/15, Q12/15   2009-09-16
[ 445 ]  
 
Management of high capacity connections in the OTN     Huawei Technologies   Q12/15   2009-09-16
[ 443 ]  
 
Text proposal to align clause 9/G.872 with draft revised G.709     Huawei Technologies   Q12/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 411 ]  
 
Sublayers and WSON in G.872     Ciena Corp   Q12/15   2009-09-15
[ 410 ]  
 
An updated Topology model for WSON     Ciena Corp   Q12/15   2009-09-15
[ 409 ]  
 
Some thoughts on Transport Entities     Ciena Corp   Q12/15   2009-09-15
[ 408 ]  
 
Characteristic Information, Sublayers and Media     Ciena Corp   Q12/15   2009-09-15
[ 401 ]  
 
Propose to add requirement of discovery support on MPLS-TP OAM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 400 ]  
 
Propose to add requirement of discovery support on MPLS-TP NM Requirement     ZTE Corporation   Q14/15, Q12/15   2009-09-15
[ 394 ]  
 
Rooted mp FDFr     Alcatel Shanghai Bell , CATR , MII   Q12/15   2009-09-14
[ 320 ]  
 
G.800 Terminology and Backward Compatibility with G.805     Huawei Technologies Co.,Ltd.   Q12/15   2008-11-26
[ 319 ]  
 
G.800 Description of Media Networks     Huawei Technologies Co.,Ltd.   Q12/15   2008-11-26
[ 318 ]  
 
G.800 Interconnect Entities     Huawei Technologies Co.,Ltd.   Q12/15   2008-11-26
[ 295 ]  
(Rev.1) 
Proposal to consider node resource management in G.8080 for WSON     ZTE Corporation   Q12/15   2008-11-23
[ 271 ]  
 
Restoration exercise     ZTE Corporation   Q14/15, Q12/15   2008-11-23
Results:170 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-27