International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4B  C 

ITU-R WP4B

Systems, air interfaces, performance and availability objectives for FSS, BSS and MSS, including IP-based applications and satellite news gathering

Results:158 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 58 ]  
 
Liaison statement to CISPR (Subcommittees B and H) (copy for information to Study Group 1 and Working Parties 1A, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Update to Standard frequency and time signal services protection requirements in the CISPR radio services database     WP 7A     2021-04-26
[ 57 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.2 - Additional information on EESS (passive) in 10.6-10.7 GHz     WP 7C   AI1.2   2021-04-23
[ 56 ]  
 
Liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4B, 4C, 5A, 5B, 5C and 7B) - WRC-23 agenda item 1.17     WP 7C   AI1.17   2021-04-23
[ 55 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 7C and 7D for information) - Reply liaison statement to Working Party 5D concerning WRC-23 agenda item 1.2     WP 7B   AI1.2   2021-04-15
[ 54 ]  
 
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-T Study Groups, ITU-R Study Groups, UN and External Organization on the output Report on Q5/2 - ITU-D Study Group 2 Question 5/2: Utilizing telecommunications/ICTs for disaster risk reduction and management     ITU-D SG 2     2021-04-14
[ 53 ]  
 
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-R Working Party 4B on output Report of ITU-D Question 2/2 - ITU-D Study Group 2 Question 2/2: Telecommunications/ICTs for e-Health     ITU-D SG 2     2021-04-14
[ 52 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, and 7C for information) - Reply liaison statement to Working Party 4A concerning WRC-23 agenda item 1.17     WP 7B   AI1.17   2021-04-09
[ 51 ]  
 
Liaison to Working Party 4B on the integration of satellite solutions into 5G networks (copy to Working Party 5D)     Director, BR     2021-06-24
[ 50 ]  
+Ann.1-6 
Report on the meeting of Working Party 4B (18-24 February 2021) (Virtual Meeting)     Chairman, WP 4B     2021-02-24
[ 49 ]  
 
Final List of Participants - Working Party 4B (E-meeting, 18-24 February 2021)     Director, BR     2021-02-24
[ 48 ]  
 
List of documents issued (Documents 4B/39, 4B/41 - 4B/48)     BR, Study Groups Department     2021-02-17
[ 47 ]  
 
Proposal on the preliminary draft detailed timeline for development of satellite radio interface(s) of IMT -2020     China (People's Republic of)     2021-02-08
[ 46 ]  
 
Proposed preliminary draft new Question ITU-R [SAT-IOT]/4 - Technical and operational characteristics of satellite IoT services     Korea (Republic of)     2021-02-05
[ 45 ]  
 
Liaison statement on establishment of a new ITU-T Focus Group on artificial intelligence for natural disaster management (FG-AI4NDM) and first meeting (Virtual, 15-17 March 2021)     ITU-T SG 2     2021-01-15
[ 44 ]  
 
Reply liaison statement to ITU-R Working Party 4B on the integration of satellite solutions into 5G networks     3GPP TSG RAN     2020-12-17
[ 43 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 5A, 7D and 3M for information) - WRC-23 agenda item 1.8 - Technical and operational characteristics and protection of the fixed service     WP 5C   AI1.8   2020-11-20
[ 42 ]  
 
Reply liaison statement to Working Parties 4B and 5A (copy for information to Working Party 3M) - WRC-23 agenda item 1.17     WP 4A   AI1.17   2020-11-09
[ 41 ]  
+Ann.1-11 
Report on the meeting of Working Party 4B (26-30 October 2020) (Virtual Meeting)     Chairman, WP 4B     2020-10-30
[ 40 ]  
 
Final list of participants Working Party 4B (E-meeting, 26-30 October 2020)     Director, BR     2020-10-30
[ 39 ]  
 
Liaison statement from ITU-D Study Group 2 Questions 5/2 to ITU-T SG 2, ITU-T SG 5, ITU-T SG 11, ITU-T SG 12, ITU-T SG 15, ITU-T SG 16, ITU-T SG 20, ITU-R Study Group 1, Working Parties 1B, 1C, 4A, 4B, 4C, 5A, 5D, Study Group 6, Working Party 6A, Study Group 7 on the final Report of ITU-D Q5/2 and draft future work of ITU-D Q5/2 to WTDC-21     ITU-D SG 2     2020-10-27
[ 38 ]  
 
List of Documents issued (Documents 4B/15 - 4B/38)     BR Study Groups Department     2020-10-26
[ 37 ]  
 
Liaison statement from ITU-D Study 2 Question 2/2 to ITU-R Working Parties 4A, 4B and 4C on satellite communications for e-Health     ITU-D SG 2     2020-10-22
[ 36 ]  
 
Reply liaison statement to ITU-R Working Parties 3K and 3M (copy to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C, and 7D for information) - Preparations for WRC-23 agenda items 1.1 and 1.2     WP 5D   AI1.2, AI1.1   2020-10-21
[ 35 ]  
 
Proposed draft liaison statement from Working Party 4B to 3GPP TSG RAN on the integration of satellite solutions into 5G ecosystems     EchoStar Operating LLC     2020-10-19
[ 34 ]  
 
A working document towards preliminary draft new Question ITU-R [SAT-IOT] - Technical and operational characteristics of satellite IoT services     Korea (Republic of)     2020-10-16
[ 33 ]  
 
Reply liaison statement to Working Party 5B - Technical and operational characteristics and protection of the Fixed Satellite Service     United States of America   AI1.8   2020-10-15
[ 32 ]  
 
Report of activities of the Correspondence Group on liaison with ITU-T and ITU-D on Satellites in Next Generation Access Technologies     Chairman, CG on L. ITU-T and ITU-D on SAT in NGAT     2020-10-08
[ 31 ]  
 
Reply liaison statement to Working Party 4A (copy for information to Working Parties 3M, 4B, 4C, 5A, 5B, 5C and 7B) - WRC-23 agenda item 1.17     WP 7C   AI1.17   2020-10-06
[ 30 ]  
 
Reply liaison statement to Working Party 1A (copy to ITU-R Working Parties 1C, 4A, 4B, and 7D) - Protection of EESS (passive) remote sensors against interference caused by radiation from electrical or electronic equipment     WP 7C     2020-10-05
[ 29 ]  
(Rev.1) 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B 4C 6A, 5B, 5C and 7B for information) - WRC-23 agenda item 1.2     WP 7C   1.2   2020-10-05
[ 28 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 5C, and 7C for information) - WRC-23 agenda item 1.17     WP 7B   AI1.17   2020-09-28
[ 27 ]  
 
Reply liaison statement to Working Party 1A (copy for information to ITU-R Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7A, 7B and 7C) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range     WP 7D     2020-09-21
[ 26 ]  
 
Initial reply liaison statement to Working Party 5B (copied to Working Parties 4A and 4B for information) - WRC-23 agenda item 1.8     WP 3M   AI1.8   2020-08-31
[ 25 ]  
 
Initial reply liaison statement to Working Party 4C (copied to Working Parties 4A, 4B, 5A, 5B, 5C, 5D and 7B for information) - WRC-23 agenda item 1.18     WP 3M   AI1.18   2020-08-31
[ 24 ]  
 
Initial reply liaison statement to Working Party 5D (copied for information to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - WRC-23 agenda items 1.1 and 1.2     WPs 3K and 3M   AI1.2, AI1.1   2020-08-28
[ 23 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5C, 7D and 3M - Preparation for WRC-23 agenda item 1.8 - Resolution 155 (Rev.WRC-19)     WP 5B   AI1.8   2020-08-17
[ 22 ]  
 
Reply liaison statement to Working Party 5D (copy to Working Parties 3K, 3M, 4A, 4B, 4C, 5A, 5B, 7B and 7C for information) - WRC-23 agenda item 1.2     WP 5C   AI1.2   2020-08-07
[ 21 ]  
 
Reply liaison statement to Working Party 4C (copied for information to Working Parties 4A, 4B, 5A, 5B, 5D, 7B, 7C and 3M) - WRC-23 agenda item 1.18     WP 5C   AI1.18   2020-08-06
[ 20 ]  
 
Reply liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 4C, 5A, 5B, 7B and 7C) - WRC-23 agenda item 1.17     WP 5C   AI1.17   2020-08-06
[ 19 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chairman, CCV     2020-07-14
[ 18 ]  
 
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups     Director, BR     2020-06-25
[ 17 ]  
 
Liaison statement to Working Parties 4B, 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.17     WP 4A   AI1.17   2020-06-10
[ 16 ]  
 
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 3M - WRC-23 agenda item 1.18     WP 4C   AI1.18   2020-06-08
[ 15 ]  
+Ann.1-7 
Report on the meeting of Working Party 4B (28-29 May 2020) (Virtual Meeting)     Chairman, WP 4B     2020-06-02
[ 14 ]  
 
Final list of participants - Working Party 4B (E-meeting, 28-29 May 2020)     Director, BR     2020-06-01
[ 13 ]  
 
List of documents issued (Documents 4B/1 - 4B/13)     BR Study Groups Department     2020-05-25
[ 12 ]  
 
Proposed schedule for Working Party 4B Correspondence Group on Next Generation Access Technologies     Chairman, WP 4B     2020-05-19
[ 11 ]  
 
Proposed establishment of a Correspondence Group to progress work on Next Generation Access Technologies     Chairman, WP 4B     2020-05-11
[ 10 ]  
 
Contribution to Working Parties 4A, 4B and 4C on relevant agenda items of WRC-23     Iran (Islamic Republic of)     2020-05-06
[ 9 ]  
 
Liaison statement on new Question "Signalling and protocols in new IP-based Networking for ManyNets supporting Integrated Space-terrestrial Network and Emerging Scenarios" of Study Group 11 for the next study period (2021-2024)     ITU-T SG 11     2020-05-01
Results:158 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-10-19