International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2026-06-29 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2026-06-29) 

ITU-T SG15

Transport, access and home

Study Period 2025

Meeting  from 2026-06-29 to 2026-07-10

held in Canada [Montreal]

Other Meetings : 2025-10-13  2025-03-17 

Results:311 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1076 ]  
 
Proposed new work item on GSTR.MAC - "Multi-agent collaboration for optical network management and control"  
To be verified by TSB
 
China Telecommunications Corporation , ZTE Corporation (China)   Q14/15, Q12/15   2026-06-16
[ 1075 ]  
 
Proposed new work item on ITU-T G.7714.1 revision -"Protocol for enhanced automatic discovery in transport networks"  
To be verified by TSB
 
China Information Communication Technologies Group , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q14/15, Q12/15   2026-06-16
[ 1074 ]  
 
Update of modulation formats and single-wavelength transceiver configurations for VHSP  
To be verified by TSB
 
Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) , SK Telecom (Korea (Rep. of))   Q2/15   2026-06-16
[ 1073 ]  
 
G.sup.88 AI Traffic Trends and the potential impact on VHSP  
To be verified by TSB
 
Huawei Technologies Co., Ltd. (China)   Q2/15   2026-06-16
[ 1072 ]  
 
G.sup.88 VHSP low latency technology - TFDM update  
To be verified by TSB
 
Huawei Technologies Co., Ltd. (China)   Q2/15   2026-06-16
[ 1071 ]  
 
Requirements, visions and key technologies for communication access of EV-charger-based distributed computing networks  
To be verified by TSB
 
China Information Communication Technologies Group , Huawei Technologies Co., Ltd. (China) , State Grid Corporation of China , ZTE Corporation (China)   Q2/15   2026-06-16
[ 1070 ]  
 
G.sup.aiBB Motivations for applying AI technologies in access and home network V3  
To be verified by TSB
 
AT&T, Inc. (United States) , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , Nokia Corporation (Finland)   Q2/15   2026-06-16
[ 1069 ]  
 
Discussion of optical switch application in data center  
Not yet uploaded
 
Beijing University of Posts and Telecommunications (China) , China Unicom   Q6/15   2026-06-16
[ 1068 ]  
 
Proposal on Terms Alignment of GSTR.OPIM with Q7 Recommendations  
To be verified by TSB
 
China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q14/15   2026-06-16
[ 1067 ]  
 
Discussion on the datasets for transport networks  
To be verified by TSB
 
ZTE Corporation (China)   Q14/15, Q12/15   2026-06-16
[ 1066 ]  
 
Further test results of possible crosstalk effect with the self-tuning mechanism function for the revised G.698.4  
Not yet uploaded
 
China Unicom , ZTE Corporation (China)   Q6/15   2026-06-16
[ 1065 ]  
 
Updates to the texts of GSTR.ENO  
To be verified by TSB
 
ZTE Corporation (China)   Q14/15, Q12/15   2026-06-16
[ 1064 ]  
 
Input and output of DCP in GSTR.ENO  
To be verified by TSB
 
ZTE Corporation (China)   Q14/15, Q12/15   2026-06-16
[ 1063 ]  
 
Management model for OTScSi and OTScSiG  
To be verified by TSB
 
ZTE Corporation (China)   Q14/15   2026-06-16
[ 1062 ]  
 
Media constructs for tuneable chromatic dispersion compensator  
To be verified by TSB
 
ZTE Corporation (China)   Q12/15   2026-06-16
[ 1061 ]  
 
Measurement methods for splice loss of heterogeneous-structured HCFs  
To be verified by TSB
 
China Unicom   Q5/15   2026-06-16
[ 1060 ]  
 
Proposal for Revisions to ENO Interface in Clauses 10.1 and 10.2 of GSTR.ENO  
To be verified by TSB
 
China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China)   Q14/15, Q12/15   2026-06-16
[ 1059 ]  
 
Proposal on updating the related descriptions of ECAP in Clause 6.1 and Clause 7 of GSTR.ENO  
To be verified by TSB
 
China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q14/15, Q12/15   2026-06-16
[ 1058 ]  
 
Proposed updates on clause 6.5 in G.7713 Amd.1  
To be verified by TSB
 
China Information Communication Technologies Group   Q14/15   2026-06-16
[ 1057 ]  
 
Proposed working text of ToD distribution over XFIN system  
To be verified by TSB
 
China Telecommunications Corporation , ZTE Corporation (China)   Q3/15   2026-06-16
[ 1056 ]  
 
Proposal on transport network support of IMT-2030/6G  
Not yet uploaded
 
Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) (Spain) , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , China Unicom , Department of Electrical and Computer Engineering University of Patras (Greece) , Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of))   Q14/15, Q13/15, Q12/15, Q11/15   2026-06-16
[ 1055 ]  
 
Proposal to update clause 8.1 configuration management in GSTR.OPIM  
To be verified by TSB
 
China Information Communication Technologies Group   Q14/15   2026-06-16
[ 1054 ]  
 
Beyond 1T FlexO-LR interface specifications  
To be verified by TSB
 
ADTRAN Holdings Inc. (United States) , AT&T, Inc. (United States) , China Information Communication Technologies Group , Ciena Canada , Fujitsu Limited (Japan) , Microchip Technology Inc. (United States) , Nokia USA (United States) , NTT, Inc. (Japan) , Orange (France)   Q11/15   2026-06-16
[ 1053 ]  
 
Comments on G.709.1 draft  
Not yet uploaded
 
China Academy of Information and Communications Technology (CAICT) , China Information Communication Technologies Group , China Mobile Communications Co. Ltd.   Q11/15   2026-06-16
[ 1052 ]  
 
Refinements for GSTR.OPIM  
To be verified by TSB
 
China Mobile Communications Co. Ltd. , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q14/15   2026-06-16
[ 1051 ]  
 
Considerations on high-density optical interconnection technologies for TR.ION-aiDC  
To be verified by TSB
 
China Telecommunications Corporation , ZTE Corporation (China)   Q6/15   2026-06-16
[ 1050 ]  
 
Overhead definition of FlexOP over FlexO-xe  
Not yet uploaded
 
China Information Communication Technologies Group , China Telecommunications Corporation   Q11/15   2026-06-16
[ 1049 ]  
 
Considerations on positioning function about the TR.fsc  
To be verified by TSB
 
China Unicom , ZTE Corporation (China)   Q6/15   2026-06-16
[ 1048 ]  
 
Refined text for TAPI in G.7702 Appendix I  
To be verified by TSB
 
China Academy of Information and Communications Technology (CAICT) , China Telecommunications Corporation , Ciena Canada , ZTE Corporation (China)   Q12/15   2026-06-16
[ 1047 ]  
 
Mapping from LO FlexO Path to FlexO-ne/xe Section  
Not yet uploaded
 
China Information Communication Technologies Group , China Telecommunications Corporation   Q11/15   2026-06-16
[ 1046 ]  
 
Considerations and analysis on phase detection about the TR.fsc  
To be verified by TSB
 
China Unicom , ZTE Corporation (China)   Q6/15   2026-06-16
[ 1045 ]  
 
Outline consideration of G.sup.FlexOP-o-FlexOxe  
Not yet uploaded
 
China Academy of Information and Communications Technology (CAICT) , China Information Communication Technologies Group , China Telecommunications Corporation   Q11/15   2026-06-16
[ 1044 ]  
 
Considerations about revised G.696.1 for DWDM system  
To be verified by TSB
 
China Mobile Communications Co. Ltd. , ZTE Corporation (China)   Q6/15   2026-06-16
[ 1043 ]  
 
Proposal for the standardization of I3 and MCS in GSTR.ENO  
To be verified by TSB
 
China Academy of Information and Communications Technology (CAICT) , China Mobile Communications Co. Ltd. , China Telecommunications Corporation , Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q14/15, Q12/15   2026-06-16
[ 1042 ]  
 
Considerations about use cases for HCF systems  
To be verified by TSB
 
ZTE Corporation (China)   Q6/15   2026-06-16
[ 1041 ]  
 
Considerations about transmission damage and compensation in HCF systems  
To be verified by TSB
 
China Mobile Communications Co. Ltd. , ZTE Corporation (China)   Q6/15, Q5/15   2026-06-16
[ 1040 ]  
 
G.807 - Optical circulator construct  
Not yet uploaded
 
Ciena Canada , ZTE Corporation (China)   Q6/15, Q12/15   2026-06-16
[ 1039 ]  
 
G.872 Figure 6-1 - Overview of the OTN  
Not yet uploaded
 
Ciena Canada   Q12/15, Q11/15   2026-06-16
[ 1038 ]  
 
Proposal to revise the G.665 for including the new definition  
To be verified by TSB
 
China Academy of Information and Communications Technology (CAICT) , China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , China Unicom , ZTE Corporation (China)   Q6/15   2026-06-16
[ 1037 ]  
 
Consideration on the further study of G.874  
To be verified by TSB
 
ZTE Corporation (China)   Q14/15   2026-06-16
[ 1036 ]  
 
Proposal for architecture alignment on observation and memory in NMA  
To be verified by TSB
 
China Mobile Communications Co. Ltd. , Huawei Technologies Co., Ltd. (China)   Q12/15   2026-06-16
[ 1035 ]  
 
Proposal for cross-layer association between OPIM and carried layer networks  
To be verified by TSB
 
China Information Communication Technologies Group , China Mobile Communications Co. Ltd. , ZTE Corporation (China)   Q14/15   2026-06-16
[ 1034 ]  
 
Proposed use case for G.suppl.ION-aiBB: Generative AI for Broadband Network Management and Automation  
Not yet uploaded
 
Fraunhofer HHI & IIS (Germany)   Q3/15   2026-06-15
[ 1033 ]  
 
Proposed use case for G.sup.IONaiHome: Distributed Intelligence with Privacy-Preserving Features for Monitoring and Automation of FTTR  
Not yet uploaded
 
Fraunhofer HHI & IIS (Germany)   Q3/15   2026-06-15
[ 1032 ]  
 
Proposal to study and define the capabilities and KPIs of ION-2030  
To be verified by TSB
 
Centre Tecnològic de Telecomunicacions de Catalunya (CTTC) (Spain)   Q6/15, Q2/15, Q12/15   2026-06-15
[ 1031 ]  
 
Key management for FlexOsec  
To be verified by TSB
 
Nokia USA (United States)   Q14/15, Q11/15   2026-06-15
[ 1030 ]  
 
G.709.x: "Convention" clause updates  
To be verified by TSB
 
Nokia USA (United States)   Q11/15   2026-06-15
[ 1029 ]  
 
Impact of automatic path startup (APSU) functions in IEEE P802.3dj on OTN mapping  
To be verified by TSB
 
Nokia USA (United States)   Q11/15   2026-06-15
[ 1028 ]  
 
G.709.1: editorial corrections related to references to IEEE 802.3dj and G.8020.3  
To be verified by TSB
 
Nokia USA (United States)   Q11/15   2026-06-15
[ 1027 ]  
 
APS protection protocol for B1T OTN  
To be verified by TSB
 
Nokia USA (United States)   Q11/15   2026-06-15
Results:311 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2026-6-16