Temporary Documents
(WP2)
 |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 252-WP2 ]
(Rev.1) |
Transverse compatible DWDM applications for repeatered optical fibre submarine cable systems
|
Editor
|
Q8/15
|
2020-02-04 |
|
[ 251-WP2 ]
|
Document withdrawn
|
N/A
|
|
2020-02-03 |
|
[ 250-WP2 ]
|
Proposed base text for continuous discussion for the revision of G.650.1
|
Rapporteur Q5/15
|
Q5/15
|
2020-02-03 |
|
[ 249-WP2 ]
|
Latest draft L.cid
|
Rapporteur Q17/15
|
Q17/15
|
2020-01-28 |
|
[ 248-WP2 ]
|
Agenda of joint meeting between Q5, 16, and 17/15
|
WP2/15 Chairman
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-28 |
|
[ 247-WP2 ]
|
Correspondence summary related to WP2/15 restructuring for the next study period
|
WP2/15 Chairman
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-26 |
|
[ 246-WP2 ]
(Rev.1-4) |
Updated draft Question texts for WP2/15
|
WP2/15 Chairman
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-25 |
|
[ 245-WP2 ]
|
Base text of WP2/15 work programme
|
WP2/15 Chairman
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-22 |
|
[ 244-WP2 ]
(Rev.1) |
Joint Correspondence Summary for updating Q8 text
|
Rapporteur
|
Q8/15
|
2020-01-21 |
|
[ 243-WP2 ]
|
Draft revised Recommendation ITU-T G.672, version 2.0.1
|
Editor G.672
|
Q7/15
|
2020-01-21 |
|
[ 242-WP2 ]
|
Joint Correspondence Summary for G.971, G.972, and G.977.1
|
Editor
|
Q8/15
|
2020-01-17 |
|
[ 241-WP2 ]
|
G.698.1 application parameters document
|
Editor G.698.1
|
Q6/15
|
2020-01-17 |
|
[ 240-WP2 ]
|
G.698.2 correspondence report
|
Editor G.698.2
|
Q6/15
|
2020-01-17 |
|
[ 239-WP2 ]
|
Correspondence report on terms of reference for Q6/15 and Q7/15
|
Rapporteurs Q6/15 and Q7/15
|
Q7/15, Q6/15
|
2020-01-16 |
|
[ 238-WP2 ]
(Rev.1-4) |
Correspondence summary and draft revised question text for 2021-2024 study period
|
Rapporteur Q16/15
|
Q16/15
|
2020-01-16 |
|
[ 237-WP2 ]
|
Correspondence summary of the attenuation specification and the note of cut off wavelength for G.654.E
|
Editor G.654
|
Q6/15, Q5/15
|
2020-01-14 |
|
[ 236-WP2 ]
|
Correspondence summary of L.tifm
|
Editor L.tifm
|
Q17/15
|
2020-01-14 |
|
[ 235-WP2 ]
(Rev.1) |
Draft L.tifm for discusssion
|
Editor L.tifm
|
Q17/15
|
2020-01-14 |
|
[ 234-WP2 ]
(Rev.1) |
Draft New Recommendation ITU-T L.oha "Optical fibre cables for in-home applications" (Latest draft)
|
Editor L.oha
|
Q16/15
|
2020-01-14 |
|
[ 233-WP2 ]
|
Correspondence activity summary of L.oha
|
Correspondence activity coordinator
|
Q16/15
|
2020-01-14 |
|
[ 232-WP2 ]
|
Correspondence summary of the topic of fast repair system
|
Correspondence leader
|
Q17/15
|
2020-01-14 |
|
[ 231-WP2 ]
|
Cable identification correspondence activity leader
|
Cable identification correspondence activity lead
|
Q17/15
|
2020-01-14 |
|
[ 230-WP2 ]
|
LS/i/r on attenuation characteristic of cabled G.654.E fibre (reply to SG15-LS202) [from IEC TC 86 SC 86A]
|
IEC TC 86 SC 86A
|
Q5/15
|
2020-01-13 |
|
[ 229-WP2 ]
|
WP2/15 proposed interim activities
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-10 |
|
[ 228-WP2 ]
|
WP2/15 outgoing Liaison Statements
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-10 |
|
[ 227-WP2 ]
|
WP2/15 Work Programme updates
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-10 |
|
[ 226-WP2 ]
|
WP2/15 texts for Approval, Determination, Consent and Agreement
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-10 |
|
[ 225-WP2 ]
|
WP2/15 meeting report
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-10 |
|
[ 224-WP2 ]
(Rev.1) |
WP2/15 meeting agenda
|
Chairman WP2/15
|
Q8/15, Q7/15, Q6/15, Q5/15, Q17/15, Q16/15
|
2020-01-10 |
|
[ 223-WP2 ]
|
Agenda of the Joint Q6, Q7/15 on Terms of Reference
|
Rapporteurs Q6, 7/15
|
Q7/15, Q6/15
|
2020-01-10 |
|
[ 222-WP2 ]
|
Agenda of the Joint Q5, Q6 and Q7/15
|
Rapporteurs Q5, 6, 7/15
|
Q7/15, Q6/15, Q5/15
|
2020-01-10 |
|
[ 221-WP2 ]
(Rev.1) |
Report of the Q17/15 meeting
|
Rapporteur Q17/15
|
Q17/15
|
2020-01-10 |
|
[ 220-WP2 ]
(Rev.1) |
Agenda of the Q17/15 meeting
Agenda of the Q17/15 meeting
|
Rapporteur Q17/15
|
Q17/15
|
2020-01-10 |
|
[ 219-WP2 ]
(Rev.1) |
Report of the Q16/15 meeting
|
Rapporteur Q16/15
|
Q16/15
|
2020-01-10 |
|
[ 218-WP2 ]
|
Agenda of the Q16/15 meeting
|
Rapporteur Q16/15
|
Q16/15
|
2020-01-10 |
|
[ 217-WP2 ]
|
Report of the Q8/15 meeting
|
Rapporteur Q8/15
|
Q16/15
|
2020-01-10 |
|
[ 216-WP2 ]
|
Agenda of the Q8/15 meeting
|
Rapporteur Q8/15
|
Q16/15
|
2020-01-10 |
|
[ 215-WP2 ]
|
Report of the Q7/15 meeting
|
Rapporteur Q7/15
|
Q7/15
|
2020-01-10 |
|
[ 214-WP2 ]
(Rev.1-2) |
Agenda of the Q7/15 meeting (27 January - 7 February 2020)
|
Rapporteur Q7/15
|
Q7/15
|
2020-01-10 |
|
[ 213-WP2 ]
|
Report of the Q6/15 meeting
|
Rapporteur Q6/15
|
Q6/15
|
2020-01-10 |
|
[ 212-WP2 ]
|
Agenda of the Q6/15 meeting (Geneva, 27 January - 7 February 2020)
|
Rapporteur Q6/15
|
Q6/15
|
2020-01-10 |
|
[ 211-WP2 ]
(Rev.1) |
Draft Report of the Q5/15 meeting (Geneva, January 2020)
|
Rapporteur Q5/15
|
Q5/15
|
2020-01-10 |
|
[ 210-WP2 ]
|
Agenda of the Q5/15 meeting
|
Rapporteur Q5/15
|
Q5/15
|
2020-01-10 |
|
[ 209-WP2 ]
(Rev.1) |
Draft revision of L.100-ref 2020 for meeting
|
Editor L.100
|
Q16/15
|
2020-01-10 |
|
[ 208-WP2 ]
|
Correspondence summary on revision of ITU-T L.100, "Optical fibre cables for duct and tunnel application"
|
Editor L.100
|
Q16/15
|
2020-01-10 |
|
[ 207-WP2 ]
(Rev.1) |
Correspondence summary of Q17 question text for next study period
|
Rapporteur Q17/15
|
Q17/15
|
2020-01-08 |
|
[ 206-WP2 ]
|
Correspondence summary of loss estimation matrix for G.652.D and G.654.E fibres
|
Rapporteur Q5/15
|
Q6/15, Q5/15
|
2020-01-07 |
|
[ 205-WP2 ]
|
Correspondence summary on revision of ITU-T Technical Report "Guide on the use of ITU-T L-series Recommendations related to optical technologies for outside plant"
|
Editor L-series Guide
|
Q8/15, Q7/15, Q17/15, Q16/15
|
2020-01-07 |
|
[ 204-WP2 ]
(Rev.1) |
Correspondence summary and draft revised question text for 2021-2024 study period
|
Rapporteur Q5/15
|
Q5/15
|
2019-12-23 |
|
[ 203-WP2 ]
|
LS/o/r on questions from IEEE 802.3 on 100 Gbit/s and 400 Gbit/s DWDM issues (reply to TD315/GEN and TD316/GEN)
|
Rapporteur Q6/15
|
Q6/15
|
2019-11-01 |
Results:50 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):