| Contributions  | 
| 
 | Number 
 | Title | Source | AI/Question 
 | Date | 
|  | [ 398 ] 
 | Comparison of PTP Monitoring Options of Annex G [G.8275.1] | Microsemi Corporation (United States) | Q13/15 | 2017-06-06 | 
|  | [ 397 ] (Rev.1)
 | Network Slicing as a Service Considerations | Microsemi Corporation (United States) | Q11/15 | 2017-06-06 | 
|  | [ 396 ] 
 | Study of OTUCn and FlexE Device Latency for 5G Front Haul Applications | Microsemi Corporation (United States) | Q11/15 | 2017-06-06 | 
|  | [ 395 ] 
 | Study of OTUCn and FlexE Device Complexity for 5G Front Haul Applications | Microsemi Corporation (United States) | Q11/15 | 2017-06-06 | 
|  | [ 394 ] 
 | G.mgfast: Framing Issues | British Telecommunications Public Ltd. Co. (BT Plc) | Q4/15 | 2017-06-06 | 
|  | [ 393 ] 
 | Considerations on the convergence of access and in-home systems | Maxlinear Inc (United States) | Q4/15, Q18/15 | 2017-06-06 | 
|  | [ 392 ] 
 | G.fast: Additional cDTA Emulation Results | ADTRAN (United States) | Q4/15 | 2017-06-06 | 
|  | [ 391 ] 
 | Proposed working text for DO-based DTA Appendix | Intel Corporation (United States) | Q4/15 | 2017-06-06 | 
|  | [ 390 ] 
 | G.vector: Annex A: Optional value for the extended clipping limit of error sample reporting | Nokia Corporation | Q4/15 | 2017-06-06 | 
|  | [ 389 ] 
 | OAM Considerations for 5G Front Haul Applications | Microsemi Corporation (United States) | Q11/15 | 2017-06-06 | 
|  | [ 388 ] 
 | PLL Convergence of Unmonitored Connection: Start-Up or Switching [G.8275.1, G.8273.2] | Microsemi Corporation (United States) | Q13/15 | 2017-06-06 | 
|  | [ 387 ] 
 | List of editorial contributions for the new Recommendation G.9903 | ERDF | Q15/15 | 2017-06-06 | 
|  | [ 386 ] 
 | G.Fast: cross-layer DTA control based on the state of traffic priority queues | ZTE Corporation (China) | Q4/15 | 2017-06-06 | 
|  | [ 385 ] (Rev.1-2)
 | G.mgfast: BT Requirements vision | British Telecommunications Public Ltd. Co. (BT Plc) | Q4/15 | 2017-06-06 | 
|  | [ 384 ] 
 | G.fast: On propagation of common mode noise from electrical mains supply | British Telecommunications Public Ltd. Co. (BT Plc) | Q4/15 | 2017-06-06 | 
|  | [ 383 ] 
 | Towards Developing an Optimized Transport Network for 5G Front Haul Applications | Microsemi Corporation (United States) | Q11/15 | 2017-06-06 | 
|  | [ 382 ] 
 | G.fast: optimized vectoring method for high-frequency band | ZTE Corporation (China)
          	    ,
        	    ASSIA Inc. | Q4/15 | 2017-06-06 | 
|  | [ 381 ] 
 | G.fast: Comments on INM | Broadcom Corporation (United States) | Q4/15 | 2017-06-06 | 
|  | [ 380 ] 
 | G.fast: G.mgfast: Requirements for weighted  coherent transmission pre-combining (WCTP) | British Telecommunications Public Ltd. Co. (BT Plc) | Q4/15 | 2017-06-06 | 
|  | [ 379 ] 
 | G.fast: Comments on RMCR | Broadcom Corporation (United States) | Q4/15 | 2017-06-06 | 
|  | [ 378 ] 
 | G.vector: Annex A: MREFPSD control parameter | Nokia Corporation | Q4/15 | 2017-06-06 | 
|  | [ 377 ] 
 | G.vdsl: LR-VDSL Symbol definitions and alignment | Broadcom Corporation (United States) | Q4/15 | 2017-06-06 | 
|  | [ 376 ] 
 | Proposal for Appendix III - Product Characterization Checklist in the Draft Recommendation ITU-T L.pneid "Passive node elements with automated ID tag detection" | Futurewei Technologies US R&D Center (United States) | Q16/15 | 2017-06-06 | 
|  | [ 375 ] 
 | Further material on the topic of IMT 2020/5G network slicing | Coriant GmbH & Co. KG (Germany) | Q14/15, Q12/15 | 2017-06-06 | 
|  | [ 374 ] 
 | G.vector: Annex A: Proposed updates to TIGAVRESP command | Nokia Corporation | Q4/15 | 2017-06-06 | 
|  | [ 373 ] 
 | G.vector: Annex A: Valid values of F_sub_TIGAV and number of TIGAV bands | Nokia Corporation | Q4/15 | 2017-06-06 | 
|  | [ 372 ] 
 | G.vector: Annex A: Proposed updates to Annex A working text | Nokia Corporation | Q4/15 | 2017-06-06 | 
|  | [ 371 ] 
 | Proposal for Appendix II - Performance Test Programme in the Draft Recommendation ITU-T L.pneid "Passive node elements with automated ID tag detection" | Futurewei Technologies US R&D Center (United States) | Q16/15 | 2017-06-06 | 
|  | [ 370 ] 
 | G.mgfast: Full Duplex over coax | Nokia Corporation | Q4/15 | 2017-06-06 | 
|  | [ 369 ] 
 | Comments and recommended corrections to the FEC specification in draft G.709otu4lr | Microsemi Corporation (United States) | Q11/15 | 2017-06-06 | 
|  | [ 368 ] 
 | G.mgfast: A technology fulfilling future requirements | Nokia Corporation | Q4/15 | 2017-06-06 | 
|  | [ 367 ] 
 | Proposal for Appendix I - Performance Evaluation Criteria in the Draft Recommendation ITU-T L.pneid "Passive node elements with automated ID tag detection" | Futurewei Technologies US R&D Center (United States) | Q16/15 | 2017-06-06 | 
|  | [ 366 ] 
 | Impact of Timestamp Processing Delay [G.8275.1] | Microsemi Corporation (United States) | Q13/15 | 2017-06-06 | 
|  | [ 365 ] 
 | Proposal for new Recommendation Optical fibre cables for in-home directly wall surface applications- Correspondence summary Document withdrawn - Posted as TD37/WP2
 | China Mobile Communications Corporation
          	    ,
        	    China Unicom
          	    ,
        	    FiberHome Technologies Group (China)
          	    ,
        	    Ministry of Industry and Information Technology (MIIT) (China) | Q16/15 | 2017-06-06 | 
|  | [ 364 ] 
 | G.mgfast: On the scope of the G.mgfast project | British Telecommunications Public Ltd. Co. (BT Plc) | Q4/15 | 2017-06-06 | 
|  | [ 363 ] 
 | Discussion on block lock behavior as given in G.709, G.798 and G.8021 | Coriant GmbH & Co. KG (Germany) | Q11/15, Q10/15 | 2017-06-06 | 
|  | [ 362 ] 
 | G.vlc: Multiple Asymmetrically Clipped Optical OFDM | Futurewei Technologies US R&D Center (United States) | Q18/15 | 2017-06-06 | 
|  | [ 361 ] 
 | On the G.mgfast routing topologies | Intel Corporation (United States) | Q4/15 | 2017-06-06 | 
|  | [ 360 ] 
 | Proposed bandwidth for G.mgfast | Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
          	    ,
        	    AT&T, Inc. (United States)
          	    ,
        	    Intel Corporation (United States)
          	    ,
        	    Sckipio Technologies S.I. Ltd. (Israel) | Q4/15 | 2017-06-06 | 
|  | [ 359 ] 
 | Measurement of EVM-related parameters from a user (operator) perspective | Deutsche Telekom AG (Germany) | Q6/15 | 2017-06-06 | 
|  | [ 358 ] 
 | Systematic IQ impairments of commercially available 100G coherent QPSK transmitters | Deutsche Telekom AG (Germany) | Q6/15 | 2017-06-06 | 
|  | [ 357 ] 
 | Discussion on 5G network support for PON system | FiberHome Technologies Group (China) | Q2/15 | 2017-06-06 | 
|  | [ 356 ] 
 | G.hn Evolution: on the framing efficiency reduction | Maxlinear Inc (United States) | Q18/15 | 2017-06-06 | 
|  | [ 355 ] 
 | G.VLC: Considerations on multi-AP & handover handling in G.VLC | Maxlinear Inc (United States) | Q18/15 | 2017-06-06 | 
|  | [ 354 ] 
 | G.8273.1 T-GM interfaces | Microsemi Corporation (United States) | Q13/15 | 2017-06-06 | 
|  | [ 353 ] 
 | G.8272 amendment number | Microsemi Corporation (United States) | Q13/15 | 2017-06-06 | 
|  | [ 352 ] 
 | ePRC phase discontinuity requirement | Microsemi Corporation (United States) | Q13/15 | 2017-06-06 | 
|  | [ 351 ] (Rev.1)
 | G.fast: On controls for the optimisation of vectoring | British Telecommunications Public Ltd. Co. (BT Plc) | Q4/15 | 2017-06-06 | 
|  | [ 350 ] 
 | Optical Physical Infrastructures | Guinea | QALL/15 | 2017-06-06 | 
|  | [ 349 ] 
 | G.fast: G.mgfast: On slicing in G.fast and G.mgfast | British Telecommunications Public Ltd. Co. (BT Plc) | Q4/15 | 2017-06-06 | 
| Results:398 total items. Result page: 	
	1 -
	2 - 
     	3 - 
     	4 - 
     	5 - 
     	6 - 
     	7 - 
     	8
	   - Next
  
 | 
Multiple Document Download: Formats and Languages to be included (when available):