International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2021-07-15 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD-WP1 (2021-07-15) 

ITU-T SG 11

Protocols and test specifications

Study Period 2017

Meeting  from 2021-07-15 to 2021-07-16

held in E-Meeting

Other Meetings : 2021-12-01  [ 2021-07-15 ]  2021-03-17  2020-12-18  2020-12-04  2020-11-19  2020-07-22  2020-03-04  2019-10-16  2019-06-26  2019-03-06  2018-10-31  2018-07-18  2017-11-08  2017-07-12  2017-02-06 

Results:49 total items.
Temporary Documents  (WP1)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 114-WP1 ]  
 
New work items (WP1/11 virtual meeting, 16 July 2021)     TSB   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2021-07-14
[ 113-WP1 ]  
 
Output - baseline text for a new work item Technical Report TR-NCDP "Session layer network coding protocol for multicast data transmission" (e-meeting, 7-16 July 2021)     Editors   Q2/11   2021-07-14
[ 112-WP1 ]  
 
Output - baseline text for a new work item Q.QKDN_profr "Quantum key distribution networks - Protocol framework" (e-meeting, 7-16 July 2021)     Editors   Q2/11   2021-07-14
[ 111-WP1 ]  
 
Output - draft new Recommendation ITU-T Q.PRO-Trust: "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" (e-meeting, 7-16 July 2021)     Editors   Q2/11   2021-07-14
[ 110-WP1 ]  
 
Output - draft Recommendation ITU-T Q.IMT2020-SAO: "Requirement, framework and protocols for signalling network analyses and optimization in IMT-2020" (e-meeting, 7-16 July 2021)     Editors   Q2/11   2021-07-14
[ 109-WP1 ]  
 
Output - draft Recommendation ITU-T Q.VoLTE-SAO-FP "Framework and protocols for signalling network analyses and optimization in VoLTE" (e-meeting, 7-16 July 2021)     Editors   Q2/11   2021-07-14
[ 108-WP1 ]  
 
Output - draft Recommendation ITU-T Q.CIDA "Signalling procedures of calling line identification authentication" (e-meeting, 7-16 July 2021)     Editor   Q2/11   2021-07-14
[ 107-WP1 ]  
 
LS/o on initiation of new Technical Report TR-NCDP "Session layer network coding protocol for multicast data transmission" [to IETF NWCRG]     ITU-T Study Group 11   Q2/11   2021-07-14
[ 106-WP1 ]  
 
LS/o on initiation of new work item Q.QKDN_profr "Quantum key distribution networks - Protocol framework" [to ITU-T SG13, SG17, FG-QIT4N; ETSI ISG-QKD, WG QSC; ISO/IEC JTC1-SC27]     ITU-T Study Group 11   Q2/11   2021-07-14
[ 105-WP1 ]  
 
LS/i/r on Proposed suppression of the Compendium of ITU's work on Emergency Telecommunications (ITU-R WP5A 5A/TEMP/99(Rev.1)) [from ITU-R WP4C]     ITU-R WP4C   Q3/11   2021-07-13
[ 104-WP1 ]  
 
LS/o on the new work item Q.DC-SA "Signalling architecture of data channel enhanced IMS network" [to IETF RTCWEB WG, 3GPP SA4, 3GPP SA2]     ITU-T Study Group 11   Q1/11   2021-07-13
[ 103-WP1 ]  
 
LS/o on the new work item Q.NICE-SA "Signalling architecture of NICE (Network intelligence capability enhancement) in support of awareness capabilities" [to ITU-T SG13]     ITU-T Study Group 11   Q1/11   2021-07-13
[ 102-WP1 ]  
 
Output - baseline text for a new work item Q.DC-SA "Signalling architecture of data channel enhanced IMS network" (e-meeting, 7-16 July 2021)     Editors   Q1/11   2021-07-13
[ 101-WP1 ]  
 
Output - baseline text for a new work item Q.NICE-SA "Signalling architecture of NICE (Network intelligence capability enhancement) in support of awareness capabilities" (e-meeting, 7-16 July 2021)     Editors   Q1/11   2021-07-13
[ 100-WP1 ]  
 
Output - baseline text of draft Recommendation ITU-T Q.Sig_Req_ETS_IMS_roaming "Signalling requirements for emergency telecommunication service in IMS roaming environment" (e-meeting, 7-16 July 2021)     Editors   Q3/11   2021-07-13
[ 99-WP1 ]  
 
Output - draft Recommendation Q.CPN "Signaling requirements for Computing Power Network" (e-meeting, 7-16 July 2021)     Editors   Q4/11   2021-07-13
[ 98-WP1 ]  
 
Output -draft Recommendation Q.SFPtr "Signalling requirements for Service Function Paths Load Balancing Traceroute in SFC" (e-meeting, 7-16 July 2021)     Editors   Q4/11   2021-07-13
[ 97-WP1 ]  
 
Output - Draft Recommendation Q.hns "Signaling requirements for hierarchical network slicing service" (e-meeting, 7-16 July 2021)     Editors   Q4/11   2021-07-13
[ 96-WP1 ]  
 
Output - draft Recommendation ITU-T Q.telemetry-VBNS "Signalling Requirement of telemetry for virtual Broadband Network Services" (e-meeting, 7-16 July 2021)     Editors   Q4/11   2021-07-13
[ 95-WP1 ]  
(Rev.1) 
Output - draft new Recommendation ITU-T Q.CNCG-IC "Signalling requirements for intelligent control of cloud-network-converged networks gateway" (e-meeting, 7-16 July 2021)     Editors   Q5/11   2021-07-13
[ 94-WP1 ]  
(Rev.1) 
Output - new draft Recommendation ITU-T Q.BNG-INC "Requirements and signalling of intelligence control for the border network gateway in computing power network" (e-meeting, 7-16 July 2021)     Editors   Q5/11   2021-07-13
[ 93-WP1 ]  
(Rev.1) 
Output - draft new Recommendation ITU-T Q.BNG-P4switch "Procedures for Programming Protocol-Independent Packet Processors(P4) Switch-based vBNG" (e-meeting, 7-16 July 2021)     Editors   Q5/11   2021-07-13
[ 92-WP1 ]  
 
LS/o/r on progress of ITU-T TR-USSD (CYBERQSC(21)021007r2) [to ETSI TC Cyber WG QSC]     ITU-T Study Group 11   Q2/11   2021-07-12
[ 91-WP1 ]  
 
LS/o/r on draft Recommendation ITU-T Q.Pro-Trust "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" [to ITU-T SG17]     ITU-T Study Group 11   Q2/11   2021-07-12
[ 90-WP1 ]  
 
LS/o/r on proposed suppression of the Compendium of ITU's work on Emergency Telecommunications (ITU-R WP 5A-5A/TEMP/99(Rev.1)) [to ITU-R WP5A]     ITU-T Study Group 11   Q3/11   2021-07-08
[ 89-WP1 ]  
 
LS/o/r on invitation to provide inputs to the roadmap of AI activities for natural disaster management (FG-AI4NDM-LS1) [to FG-AI4NDM]     ITU-T Study Group 11   Q3/11   2021-07-08
[ 88-WP1 ]  
(Rev.1) 
Draft Report of Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (virtual, 16 July 2021)     Chairman WP1/11   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2021-06-18
[ 87-WP1 ]  
(Rev.1-2) 
Draft Report of interim Q5/11 RGM e-meeting Q5/11 "Signalling requirements and protocols for border network gateway in the context of network virtualization and intelligentization" (e-meeting, 7-16 July 2021)     Rapporteur Q5/11   Q5/11   2021-06-18
[ 86-WP1 ]  
(Rev.1) 
Draft Report of interim Q4/11 RGM e-meeting Q4/11 "Protocols for control, management and orchestration of network resources" (e-meeting, 7-16 July 2021)     Rapporteur Q4/11   Q4/11   2021-06-18
[ 85-WP1 ]  
(Rev.1) 
Draft Report of interim Q3/11 RGM e-meeting Q3/11 "Signalling requirements and protocols for emergency telecommunications" (e-meeting, 7-16 July 2021)     Rapporteur Q3/11   Q3/11   2021-06-18
[ 84-WP1 ]  
(Rev.1) 
Draft Report of interim Q2/11 RGM e-meeting Q2/11 "Signalling requirements and protocols for services and applications in telecommunication environments" (e-meeting, 7-16 July 2021)     Rapporteur Q2/11   Q2/11   2021-06-18
[ 83-WP1 ]  
 
Draft Report of interim Q1/11 RGM e-meeting Q1/11 "Signalling and protocol architectures for telecommunication networks and guidelines for implementations" (e-meeting, 7-16 July 2021)     Rapporteur Q1/11   Q1/11   2021-06-18
[ 82-WP1 ]  
 
LS/i/r on Comments from ETSI TC CYBER QSC to ITU-T SG11 on TR-USSD (SG11-LS175) [from ETSI TC Cyber WG QSC]     ETSI TC Cyber WG QSC   Q2/11   2021-06-11
[ 81-WP1 ]  
 
LS/i/r on invitation to provide inputs to the roadmap of AI activities for natural disaster management (FG-AI4NDM-LS1) [from ITU-T SG20]     ITU-T Study Group 20   Q3/11   2021-06-08
[ 80-WP1 ]  
 
LS/i/r on Disaster Relief Use Cases (SG11-LS166) [from ITU-R WP5A]     ITU-R WP5A   Q3/11   2021-05-21
[ 79-WP1 ]  
 
Draft Report of interim RGM of Q4/11 e-meeting (18-19 May 2021)     Rapporteur Q4/11   Q4/11   2021-05-19
[ 78-WP1 ]  
 
Output - draft new Recommendation ITU-T Q.telemetry-VBNS "Signalling requirements for telemetry of virtual broadband network services" (e-meeting, 18-19 May 2021)     Editors   Q4/11   2021-05-19
[ 77-WP1 ]  
 
Output - draft new Recommendation ITU-T Q.SFPtr "Signalling requirements for Service Function Paths Load Balancing Traceroute in SFC" (e-meeting, 18-19 May 2021)     Editors   Q4/11   2021-05-19
[ 76-WP1 ]  
 
LS/i on Proposed suppression of the Compendium of ITU's work on Emergency Telecommunications [from ITU-R WP5A]     ITU-R WP5A   Q3/11   2021-05-18
[ 75-WP1 ]  
 
LS/i on coordination for identity management [from ITU-T SG17]     ITU-T Study Group 17   Q2/11, Q15/11   2021-05-18
[ 74-WP1 ]  
 
LS/i/r on progress of ongoing work item ITU-T TR-USSD (SG11-LS177) [from ISO IEC JTC1 SC27 WG2]     ISO IEC JTC1 SC27 WG2   Q2/11   2021-05-05
[ 73-WP1 ]  
 
LS/i on the Output Report on Question 5/2 [from ITU-D Q5/2]     ITU-D Q5/2   Q3/11   2021-05-05
[ 72-WP1 ]  
 
LS/i on invitation to provide inputs to the roadmap of AI activities for natural disaster management [from FG-AI4NDM]     FG-AI4NDM   Q3/11   2021-05-05
[ 71-WP1 ]  
 
LS/i/r on draft Recommendation ITU-T Q.Pro-Trust "Signalling procedures and protocols for enabling interconnection between trustable network entities in support of existing and emerging networks" (SG11-LS176) [from ITU-T SG17]     ITU-T Study Group 17   Q2/11   2021-04-15
[ 70-WP1 ]  
 
List of WP1/11 Rapporteurs, Associate Rapporteurs and Acting Rapporteurs     TSB   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2021-04-15
[ 69-WP1 ]  
 
Incoming and outgoing liaison statements (WP1/11 virtual meeting, 16 July 2021)     TSB   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2021-04-15
[ 68-WP1 ]  
 
List of participants (virtual, 15-16 July 2021)     TSB   QALL/11   2021-04-14
[ 67-WP1 ]  
(Rev.1-8) 
Draft time plan of interim Rapporteur group e-meetings and WP1/11, WP2/11 and WP3/11 virtual meetings (7-16 July 2021)     TSB   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2021-04-14
[ 66-WP1 ]  
(Rev.1-2) 
Draft Agenda for Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (virtual, 16 July 2021)     TSB   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2021-04-14
Results:49 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-17