International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2017-07-12 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD (2017-07-12) 

ITU-T SG 11

Protocols and test specifications

Study Period 2017

Meeting  from 2017-07-12 to 2017-07-13

held in Switzerland [Geneva]

Other Meetings : 2021-12-01  2021-07-15  2021-03-17  2020-12-18  2020-12-04  2020-11-19  2020-07-22  2020-03-04  2019-10-16  2019-06-26  2019-03-06  2018-10-31  2018-07-18  2017-11-08  [ 2017-07-12 ]  2017-02-06 

Temporary Documents  (WP1)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 18-WP1 ]  
(Rev.1) 
Draft Report for Working Party 1/11 "Signalling requirements and protocols for emerging telecommunications networks" (Geneva, 12 July 2017)     Chairman WP1/11   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2017-07-11
[ 17-WP1 ]  
 
Agenda for Interim Meeting of WP1/11 "Signalling requirements and protocols for emerging telecommunications networks"     Chairman WP1/11   Q5/11, Q4/11, Q3/11, Q2/11, Q1/11   2017-07-11
[ 16-WP1 ]  
 
Withdrawn     N/A     2017-07-11
[ 15-WP1 ]  
 
Output - draft new Recommendation of Q.BNG-DBOD "Signalling requirements for dynamic bandwidth adjustment on demand on broadband network gateway implemented by SDN technologies"     Editors   Q5/11   2017-07-11
[ 14-WP1 ]  
 
Report for Q5/11 meeting "Protocols and procedures supporting services provided by broadband network gateways" (e-meeting, 5 July 2017)     Associate Rapporteur Q5/11   Q5/11   2017-07-11
Currently viewing 5 of 18  documents related to this meeting (more...)  

 
Temporary Documents  (WP2)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 22-WP2 ]  
(Rev.1) 
Draft report for Working Party 2/11 "Control and management protocols for IMT-2020" (Geneva, 13 July 2017)     Chairman WP2/11   Q8/11, Q7/11, Q6/11   2017-07-13
[ 21-WP2 ]  
(Rev.1) 
Agenda for WP2/11 "Control and management protocols for IMT-2020"     Chairman WP2/11   Q8/11, Q7/11, Q6/11   2017-07-13
[ 20-WP2 ]  
(Rev.1) 
Report of Rapporteur meeting of Question 8/11 (Geneva, 3-12 July 2017)     Rapporteur Q8/11   Q8/11   2017-07-13
[ 19-WP2 ]  
(Rev.1-2) 
Report of Q7/11 Rapporteur meeting "Signalling requirements and protocols for network attachment including mobility and resource management for future networks and IMT-2020" (Geneva, 3-12 July 2017)     Rapporteur Q7/11   Q7/11   2017-07-13
[ 18-WP2 ]  
 
Output-Draft Recommendation Q.MEA-SRA "Signalling requirement and architecture for media service entity attachment" (Q7/11 Rapporteur meeting, Geneva, 3-12 July 2017)     Editors   Q7/11   2017-07-13
Currently viewing 5 of 22  documents related to this meeting (more...)  

 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2017-07-18