| Contributions  | 
| 
 | Number 
 | Title | Source | AI/Question 
 | Date | 
|  | [ 277 ] 
 | Proposed new work item on K.Small - "Small base stations - impact on the overall exposure level" | Argentina | Q3/5 | 2018-05-09 | 
|  | [ 276 ] 
 | Proposed new work item on K.reflection - "Impact of the metallic structures for the EMF exposure level" | Argentina | Q3/5 | 2018-05-09 | 
|  | [ 275 ] 
 | Proposed new work item on K.peak - "Comparison between peak and real exposure in the long term considerations" | Argentina | Q3/5 | 2018-05-09 | 
|  | [ 274 ] 
 | Proposed new work item on ITU-T K.Zones - "Guidance on Determining the Compliance Boundaries (the exclusion zone) of a Live Antenna" | Argentina | Q3/5 | 2018-05-09 | 
|  | [ 273 ] 
 | Proposed new work item on K.dosimeter - "Personal dosimeters as a device in assessing human exposure to EMF" | Argentina | Q3/5 | 2018-05-09 | 
|  | [ 272 ] (Rev.1)
 | IEC 60617 compliance and PoE testing | Bourns Limited | Q2/5 | 2018-05-08 | 
|  | [ 271 ] (Rev.1-2)
 | Insulation co-ordination and IEEE 802.3 insulation tests | Bourns Limited | Q2/5 | 2018-05-08 | 
|  | [ 270 ] (Rev.1)
 | IP PoE camera systems - Bridging Functional Insulation - implications and system consequences | Bourns Limited | Q2/5, Q1/5 | 2018-05-08 | 
|  | [ 269 ] 
 | Clarification needed on PoE testing - topics for discussion | Bourns Limited | Q2/5 | 2018-05-08 | 
|  | [ 268 ] (Rev.1)
 | Draft ITU-T Recommendation K.Radio.EMC - Electromagnetic Compatibility requirement for radio telecommunication equipment | Nokia Corporation | Q4/5 | 2018-05-08 | 
|  | [ 267 ] 
 | Referencing Figure 6.7-3 given in the ITU-T K.44 | Bourns Limited | Q2/5 | 2018-05-08 | 
|  | [ 266 ] 
 | Adequate assessment and sensitization on possible human exposure to RF EMF radiation around telecommunications installations | Uganda Communications Commission (UCC) | Q3/5 | 2018-05-08 | 
|  | [ 265 ] (Rev.1)
 | Harmonizing EMF Exposure Limits | Office of Electronic Communications
          	    ,
        	    Poland | Q3/5 | 2018-05-08 | 
|  | [ 264 ] (Rev.1-3)
 | Some reworked material for K.rcd document | Bourns Limited
          	    ,
        	    China Telecommunications Corporation | Q2/5 | 2018-05-08 | 
|  | [ 263 ] (Rev.1)
 | Proposed second draft of  K.soft_req "Reliability requirement of particle radiation effect for telecommunication systems" | Fujitsu Limited
          	    ,
        	    Hitachi, Ltd.
          	    ,
        	    NEC Corporation
          	    ,
        	    Nippon Telegraph and Telephone Corporation (NTT)
          	    ,
        	    Oki Electric Industry Company Ltd. (OKI)
          	    ,
        	    Xilinx Incorporation | Q5/5 | 2018-05-08 | 
|  | [ 262 ] (Rev.1)
 | Proposal of third draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests" | Fujitsu Limited
          	    ,
        	    Hitachi, Ltd.
          	    ,
        	    NEC Corporation
          	    ,
        	    Nippon Telegraph and Telephone Corporation (NTT)
          	    ,
        	    Oki Electric Industry Company Ltd. (OKI)
          	    ,
        	    Xilinx Incorporation | Q5/5 | 2018-05-08 | 
|  | [ 261 ] (Rev.1)
 | Proposal for the revision of ITU-T Rec. K.21 (07/2017) Resistibility of telecommunication equipment installed in customer premises to overvoltages and overcurrents | Nokia Corporation | Q2/5 | 2018-05-07 | 
|  | [ 260 ] (Rev.1)
 | Proposal for the revision of ITU-T Rec. K.45 (07/2017) Resistibility of telecommunication equipment installed in the access and trunk networks to overvoltages and overcurrents | Nokia Corporation | Q2/5 | 2018-05-07 | 
|  | [ 259 ] (Rev.1)
 | Proposal for Annex A "Case Study" to supplement TD 366 K.Supp-5G_EMF_Compliance: Electromagnetic field (EMF) compliance assessments for 5G wireless networks | Ministry of Communications
          	    ,
        	    India | Q3/5 | 2018-05-07 | 
|  | [ 258 ] (Rev.1)
 | Proposal for Supplement K.BPrac (May 2018) | GSMA | Q3/5 | 2018-05-07 | 
|  | [ 257 ] 
 | Modified proposal for Appendix II of K.121 on RF-EMF Compliance of Shared Radiocommunications Sites | GSMA | Q3/5 | 2018-05-07 | 
|  | [ 256 ] (Rev.1)
 | New version v 7.01 of the software "EMF-estimator" | Orange Polska S.A.
          	    ,
        	    National Institute of Telecommunications
          	    ,
        	    Poland | Q3/5 | 2018-05-07 | 
|  | [ 255 ] (Rev.1)
 | Minimum distances to transmitting antennas | Orange Polska S.A. | Q3/5 | 2018-05-07 | 
|  | [ 254 ] (Rev.1)
 | Revision of the ITU-T Recommendation K.90 | Orange Polska S.A. | Q3/5 | 2018-05-07 | 
|  | [ 253 ] 
 | Comparison of controlled and uncontrolled exposure levels | Orange Polska S.A. | Q3/5 | 2018-05-07 | 
|  | [ 252 ] (Rev.1)
 | Comparison of measurements of the exposure levels in countries with different exposure limits | Orange
          	    ,
        	    Orange Polska S.A. | Q3/5 | 2018-05-07 | 
|  | [ 251 ] 
 | Exposure levels in the vicinity of the collocated base stations | Orange Polska S.A. | Q3/5 | 2018-05-07 | 
|  | [ 250 ] (Rev.1)
 | Comments and proposed changes to K 44 | Cisco Systems, Inc. | Q2/5 | 2018-05-07 | 
|  | [ 249 ] 
 | Proposal for the revision of K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication facilities" | Nippon Telegraph and Telephone Corporation (NTT) | Q4/5 | 2018-05-07 | 
|  | [ 248 ] 
 | Proposal about resistibility level of internal Ethernet port | Nippon Telegraph and Telephone Corporation (NTT) | Q2/5 | 2018-05-07 | 
|  | [ 247 ] 
 | Proposed revision of K.44 for definition of "Intra-system port" | Nippon Telegraph and Telephone Corporation (NTT) | Q2/5 | 2018-05-07 | 
|  | [ 246 ] 
 | Comments and re-proposals on K.vss "Lightning protection and Earthing of Video Surveillance System" | Nippon Telegraph and Telephone Corporation (NTT) | Q1/5 | 2018-05-07 | 
|  | [ 245 ] (Rev.1)
 | The fourth draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions" | China Unicom | Q1/5 | 2018-05-06 | 
|  | [ 244 ] (Rev.1)
 | Proposal for the revision of ITU-T Rec. K.20 (07/2017) Resistibility of telecommunication equipment installed in a telecommunication centre to overvoltages and overcurrents | Nokia Corporation | Q2/5 | 2018-05-03 | 
|  | [ 243 ] (Rev.1)
 | Proposals to revise K.44 (2017) Resistibility tests for telecommunication equipment exposed to overvoltagesand overcurrents - Basic Recommendation | Nokia Corporation | Q2/5 | 2018-05-03 | 
|  | [ 242 ] 
 | Second Draft new Recommendation ITU-T K.wire-line_emc | Huawei Technologies Co., Ltd. | Q4/5 | 2018-05-03 | 
|  | [ 241 ] (Rev.1-2)
 | The proposal of Mains power contact test for outdoor UTP/STP Ethernet in ITU-T K.20/K.21/K.45 | Huawei Technologies Co., Ltd. | Q2/5 | 2018-05-03 | 
|  | [ 240 ] 
 | Proposal to add a new Appendix to give some examples for protection GPS system against lightning in ITU-T K.112 | Huawei Technologies Co., Ltd. | Q1/5 | 2018-05-03 | 
|  | [ 239 ] (Rev.1)
 | Proposal for Appendix II of K.121 on the Shared Radiocommunications Site | Electronics and Telecommunications Research Institute (ETRI)
          	    ,
        	    Korea (Rep. of)
          	    ,
        	    Ministry of Science and ICT | Q3/5 | 2018-05-03 | 
|  | [ 238 ] (Rev.1)
 | Proposal for some issues regarding the Technical Report on 5G and EMF | Electronics and Telecommunications Research Institute (ETRI)
          	    ,
        	    Korea (Rep. of)
          	    ,
        	    Ministry of Science and ICT | Q3/5 | 2018-05-03 | 
|  | [ 237 ] 
 | Proposed text for K.121 Annex on Guidance on environmental management for shared sites | China Telecommunications Corporation | Q3/5 | 2018-05-02 | 
|  | [ 236 ] (Rev.1)
 | 3rd draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipment". | China Telecommunications Corporation
          	    ,
        	    Beijing University of Posts and Telecommunications | Q4/5 | 2018-05-02 | 
|  | [ 235 ] 
 | Proposed second draft of new Recommendation K.spdsafe "Guidance on safety relating to the use of surge protective devices and surge protective components in customer building and access network" | Nippon Telegraph and Telephone Corporation (NTT) | Q2/5 | 2018-04-27 | 
|  | [ 234 ] 
 | Comments on use of terms of insulation and isolation | Nippon Telegraph and Telephone Corporation (NTT) | Q2/5 | 2018-04-27 | 
|  | [ 233 ] 
 | Study of the desirability of easing the overvoltage resistibility requirement for STP Ethernet ports in K.20 and K.21 | Nippon Telegraph and Telephone Corporation (NTT) | Q2/5 | 2018-04-26 | 
|  | [ 232 ] (Rev.1)
 | A Study on necessity of overvoltage test of USB port in K.20 and K.21 (in the case of connecting USB device which is supplied power by an AC adapter) | Nippon Telegraph and Telephone Corporation (NTT) | Q2/5 | 2018-04-26 | 
|  | [ 231 ] 
 | K.45 cable length of 6 meters or less are exempt from testing | ADTRAN | Q2/5 | 2018-04-23 | 
|  | [ 230 ] (Rev.1)
 | Review of IEC 62305-4 | Littelfuse UK Ltd. | Q1/5 | 2018-04-19 | 
|  | [ 229 ] 
 | K.20 internal cable length of 10 meters or less are exempt from testing. | ADTRAN | Q2/5 | 2018-04-19 | 
|  | [ 228 ] (Rev.1)
 | Bridging Ethernet functional insulation | Bourns Limited | Q2/5 | 2018-04-19 | 
| Results:62 total items. Result page: 	
	1 -
	2
	   - Next
  
 | 
Multiple Document Download: Formats and Languages to be included (when available):