| Contributions  | 
| 
 | Number 
 | Title | Source | AI/Question 
 | Date | 
|  | [ 183 ] 
 | Roadmap for E- Waste Take- back committee | Centre for Environment and Development for the Arab Region and Europe-Egypt | Q7/5 | 2017-11-01 | 
|  | [ 182 ] 
 | Baseline Document for work item L.ICT and FA - Use of ICT in the adaptation of the Fisheries Sector to the Effects of Climate Change | Ministry of Communication and Information Technology (MCIT)-Egypt | Q9/5 | 2017-11-01 | 
|  | [ 181 ] 
 | Technical Report on "Analysis of EMC aspects and definition of requirements for 5G systems" | Nokia Corporation | Q4/5 | 2017-11-01 | 
|  | [ 180 ] (Rev.1)
 | Proposal for L.1000 revision | Orange | Q7/5 | 2017-10-31 | 
|  | [ 179 ] 
 | Carbon budget for the ICT sector | Orange | Q9/5 | 2017-10-31 | 
|  | [ 178 ] 
 | L.ENST3 - New energy storage technology for stationary use with network and CPE; Super-Capacitor technology | Huawei Technologies Co., Ltd.
          	    ,
        	    Telecom Italia S.p.A. | Q6/5 | 2017-10-31 | 
|  | [ 177 ] 
 | First draft of Recommendation ITU-T K.int (Limits of interferences on telecommunication transmissions on copper other than speech) | Orange
          	    ,
        	    Société nationale des chemins de fer français | Q1/5 | 2017-10-31 | 
|  | [ 176 ] 
 | Research of limits on ADSL disturbances created by A.C. electrified traction systems for K.int (Limits of interference on telecommunication transmissions on copper other than speech) | Orange
          	    ,
        	    Société nationale des chemins de fer français | Q1/5 | 2017-10-31 | 
|  | [ 175 ] 
 | Proposal to create a new work item to develop a new ITU-T Recommendation on  Procurement Criteria for Data Centres. | Ministerio de Modernización-Argentina | Q6/5 | 2017-10-31 | 
|  | [ 174 ] (Rev.1)
 | Proposed new work item: Draft Recommendation on 5G energy efficiency | Ministerio de Modernización-Argentina
          	    ,
        	    Huawei Technologies Co., Ltd. | Q6/5 | 2017-10-31 | 
|  | [ 173 ] 
 | Baseline Document for the Recommendation on "EPR Guidelines for Sustainable E-waste Management in countries" | Ministry of Communication and Information Technology (MCIT)-Egypt
          	    ,
        	    Royal KPN N.V.
          	    ,
        	    Uganda Communications Commission (UCC) | Q7/5 | 2017-10-31 | 
|  | [ 172 ] 
 | Proposal to convert the Technical Report on "Study on methods and metrics to evaluate energy efficiency for future 5G systems" into a Supplement | Huawei Technologies Co., Ltd.
          	    ,
        	    Telecom Italia S.p.A. | Q6/5 | 2017-10-31 | 
|  | [ 171 ] (Rev.1)
 | Contribution on 5 sept draft ID2r1 of L.400migration / ETSI DES 0260 | Orange | Q6/5 | 2017-10-31 | 
|  | [ 170 ] 
 | Proposed text for the Draft Recommendation on the methodologies for the assessment of the environmental impact of the ICT sector | Nokia Corporation
          	    ,
        	    Orange
          	    ,
        	    Telefon AB - LM Ericsson | Q9/5 | 2017-10-31 | 
|  | [ 169 ] (Rev.1)
 | Recommendation L.mmNFV - Measurement method for energy efficiency of Network Function Virtualization | Consorzio Nazionale Interuniversitario per le Telecomunicazioni
          	    ,
        	    Huawei Technologies Co., Ltd. | Q6/5 | 2017-10-31 | 
|  | [ 168 ] 
 | 2nd revised baseline text of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities) | Electronics and Telecommunications Research Institute (ETRI) | Q9/5 | 2017-10-31 | 
|  | [ 167 ] (Rev.1)
 | Presentation of the main concepts of the fourth draft of the ITU-T L.GAL2 | Consorzio Nazionale Interuniversitario per le Telecomunicazioni | Q6/5 | 2017-10-31 | 
|  | [ 166 ] (Rev.1)
 | The fourth draft of the ITU-T L.GAL2 - Interface for power management in NFV environments  "Green Abstraction Layer 2" | Consorzio Nazionale Interuniversitario per le Telecomunicazioni | Q6/5 | 2017-10-31 | 
|  | [ 165 ] 
 | Points to consider for 5G energy efficiency | Telecom Italia S.p.A. | Q6/5 | 2017-10-31 | 
|  | [ 164 ] 
 | Questionnaire to develop a guideline on best practices and environment friendly policies for effective ICT deployment methods. | Malaysian Communications and Multimedia Commission | Q6/5 | 2017-10-31 | 
|  | [ 163 ] 
 | Proposal for considerations on using risk assessment method of L.CCRisk | Electronics and Telecommunications Research Institute (ETRI) | Q9/5 | 2017-10-31 | 
|  | [ 162 ] 
 | Study : Role of ICT in facing Climate Change within the Arab region | Arab Information and Communication Technology Organization (AICTO) | Q9/5 | 2017-10-31 | 
|  | [ 161 ] (Rev.1-2)
 | Mitigating Climate Change Impacts for a Sustainable Agriculture in the Arab Region | Arab Information and Communication Technology Organization (AICTO) | Q9/5 | 2017-10-31 | 
|  | [ 160 ] 
 | Information regarding an ongoing study on ICTs carbon footprint | Telefon AB - LM Ericsson | Q9/5 | 2017-10-31 | 
|  | [ 159 ] (Rev.1)
 | EMF Estimator Error factor | National Telecommunications Corporation (NTC)-Sudan | Q3/5 | 2017-10-31 | 
|  | [ 158 ] (Rev.1)
 | Updated draft document of L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities) | Korea (Rep. of) | Q9/5 | 2017-10-31 | 
|  | [ 157 ] (Rev.1)
 | Contribution for Clause 9 and 10 of L.CCRisk | Korea (Rep. of) | Q9/5 | 2017-10-31 | 
|  | [ 156 ] (Rev.1)
 | Draft baseline document for L.CCRisk (Framework of climate change risk assessment for telecommunication and electrical facilities) | Korea (Rep. of) | Q9/5 | 2017-10-31 | 
|  | [ 155 ] 
 | Consideration topics in preparation for the Technical Report concerning 5G and EMF | Korea (Rep. of) | Q3/5 | 2017-10-31 | 
|  | [ 154 ] 
 | Proposal of updating L.green_mgm_DC | Korea (Rep. of) | Q6/5 | 2017-10-31 | 
|  | [ 153 ] 
 | Proposal of the operational procedure of the energy-saving management system in L.green_mgm_DC | Korea (Rep. of) | Q6/5 | 2017-10-31 | 
|  | [ 152 ] 
 | Proposal to advance current work item L.SIB "Sustainable and intelligent building services" | Secretaría de Estado para la Sociedad de la Información y la Agenda Digital-Spain | Q6/5 | 2017-10-31 | 
|  | [ 151 ] 
 | Isolation transformers and rated insulation withstand | Bourns Limited | Q8/5, Q2/5 | 2017-10-31 | 
|  | [ 150 ] (Rev.1)
 | 5G energy consumption and exponential traffic growth | Orange | Q6/5 | 2017-10-31 | 
|  | [ 149 ] (Rev.1)
 | Electromagnetic field (EMF) compliance assessments for 5G wireless networks Technical Report | Telstra Corporation Ltd.
          	    ,
        	    Telefon AB - LM Ericsson | Q3/5 | 2017-10-31 | 
|  | [ 148 ] 
 | Uses analysis of ship-related big data to estimate fuel efficiency, speed and other performance in actual sea | Ministry of Communication and Information Technology (MCIT)-Egypt | Q9/5 | 2017-10-31 | 
|  | [ 147 ] (Rev.1)
 | Eco-fee modulation principles in France for EPR | Orange | Q7/5 | 2017-10-31 | 
|  | [ 146 ] (Rev.1)
 | Comments and proposed changes to K .44 | Cisco Systems, Inc. | Q2/5 | 2017-10-31 | 
|  | [ 145 ] (Rev.1)
 | Discussion on passive intermodulation distortions of array antenna systems in mobile communication system | China Mobile Communications Corporation | Q4/5 | 2017-10-31 | 
|  | [ 144 ] (Rev.1)
 | First draft of Smart energy solution for telecom base stations(L.SM_BS) | Ministry of Industry and Information Technology (MIIT)-China | Q6/5 | 2017-10-31 | 
|  | [ 143 ] 
 | Orange's e- Waste Take Back System in Egypt | Orange | Q7/5 | 2017-10-30 | 
|  | [ 142 ] 
 | Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations | Huawei Technologies Co., Ltd. | Q2/5 | 2017-10-30 | 
|  | [ 141 ] (Rev.1)
 | Information for the inclusion in K.BPrac | Orange | Q3/5 | 2017-10-30 | 
|  | [ 140 ] (Rev.1)
 | Second Draft new Recommendation ITU-T K.wire-line_emc | Huawei Technologies Co., Ltd. | Q4/5 | 2017-10-30 | 
|  | [ 139 ] 
 | New version v 6.02 of the software "EMF-estimator" | ORANGE POLSKA S.A. | Q3/5 | 2017-10-30 | 
|  | [ 138 ] 
 | Impact of 5G technology on human exposure | Orange | Q3/5 | 2017-10-30 | 
|  | [ 137 ] 
 | Impact of EU RED Directive | Orange | Q3/5 | 2017-10-30 | 
|  | [ 136 ] 
 | EMF in the vicinity of the metallic objects | ORANGE POLSKA S.A. | Q3/5 | 2017-10-30 | 
|  | [ 135 ] (Rev.1)
 | Partially edited COM 595 "The draft of Recommendation ITU-T K.appl2" | Bourns Limited | Q2/5 | 2017-10-30 | 
|  | [ 134 ] (Rev.1)
 | EMF measurements in different environment | ORANGE POLSKA S.A. | Q3/5 | 2017-10-30 | 
| Results:106 total items. Result page: 	
	1 -
	2 - 
     	3
	   - Next
  
 | 
Multiple Document Download: Formats and Languages to be included (when available):