International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : TSAG : Meeting 2011-02-08 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T TSAG  TD (2011-02-08) 

ITU-T TSAG

Telecommunication Standardization Advisory Group

Study Period 2009

Meeting  from 2011-02-08 to 2011-02-11

held in Switzerland [Geneva]

Other Meetings : 2012-07-02  2012-01-10  [ 2011-02-08 ]  2010-02-08  2009-04-28 

Results:101 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Received Source Title Questions
[ 249 ]  
(Rev.1) 
2011-02-11 Bruno Ramos, leader informal discussion group   Mailing List on adjustments to the current structure of ITU-T     N/A  
[ 248 ]  
 
2011-02-11 Director TSB   EBU support for the establishment of an ITU focus group on accessibility     N/A  
[ 247 ]  
(Rev.1) 
2011-02-11 Chairman TSAG   Draft Report of the TSAG meeting held in Geneva (8-11 February 2011)     N/A  
[ 246 ]  
 
2011-02-11 Convener ad hoc group   Report of ad hoc group on Working Methods (including electronic working methods)     N/A  
[ 245 ]  
 
2011-02-11 Director BR   Welcome remarks by the Director BR     N/A  
[ 244 ]  
 
2011-02-11 Director BDT   Welcome remarks by the Director BDT     N/A  
[ 243 ]  
 
2011-02-10 Director TSB   Membership information session     N/A  
[ 242 ]  
(Rev.1) 
2011-02-10 Heung Youl Youm, leader informal discussion group   Discussion results on strengthening the role and responsibilities of each (lead) SG for maintaining terms and definitions     N/A  
[ 241 ]  
 
2011-02-10 TSB   Welcome remarks by the Deputy Secretary-General     N/A  
[ 240 ]  
 
2011-02-10 Director TSB   Welcome remarks by the Director TSB     N/A  
[ 239 ]  
 
2011-02-09 Chair Focus Group on Smart Grid   Interim report to TSAG on status of the work in the focus Group on Smart Grid     N/A  
[ 238 ]  
 
2011-02-09 Chairman ITU-T SG16   Proposed revision of Question 27/16 (Vehicle gateway platform for telecommunication/ITS services/applications)     N/A  
[ 237 ]  
(Rev.1-3) 
2011-02-09 TSB   Final List of participants     N/A  
[ 236 ]  
 
2011-02-08 ISO/IEC JTC 1   ISO/IEC JTC 1 liaison report to TSAG, February 2011     N/A  
[ 235 ]  
 
2011-02-08 Director TSB   Internet of Things Definitions and ITU-T SG Questions     N/A  
[ 234 ]  
(Rev.1) 
2011-02-07 Leader, Corr. Group on Strategic & Op Plan   Draft LS highlighting the changes of ITU-T portion of PP. Res. 71(Strategic plan) from (2008-20011) to (2012-2015)     N/A  
[ 233 ]  
 
2011-02-07 EWM Coordinator ITU-T SG12   Issues with regard to electronic working methods     N/A  
[ 232 ]  
 
2011-02-07 Director TSB   TSB Director's Report: Highlights of 2010  
Includes presentation
 
N/A  
[ 231 ]  
 
2011-02-07 JCA-NID   iLS-JCA-NID Progress Report to TSAG     N/A  
[ 230 ]  
 
2011-02-04 Director TSB   Report of TSB Director's ad hoc group for IPR matters     N/A  
[ 229 ]  
 
2011-02-04 Director TSB   PP-10: Summary of results and what they mean for ITU-T     N/A  
[ 228 ]  
 
2011-02-04 Director TSB   Draft four-year Rolling Operational Plan for the 2012 to 2015 Timeframe     N/A  
[ 227 ]  
 
2011-02-04 Director TSB   Information on IPv4 Address Depletion and IPv6 Deployment     N/A  
[ 226 ]  
 
2011-02-07 TSB   TSAG meeting facilities and information     N/A  
[ 225 ]  
 
2011-02-04 Director TSB   Accessibility Work since the last TSAG meeting     N/A  
Results:101 total items.
Result page:  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2011-02-11