Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2012-09-10 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2012-09-10) 

UIT-T SG15

Transport network structures

Période d'études 2009

Réunion  du 2012-09-10 au 2012-09-21

Lieu : Suisse [Genève]

Autres réunions : 2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultats:452 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 2390 ]  
 
Optic Fiber networks in Burundi     Burundi   QALL/15   2012-08-29
[ 2389 ]  
 
Implementation of L2.bis modes in ADSL2Plus     British Telecommunications Public Ltd. Co. (BT Plc)   Q4A/15   2012-08-29
[ 2388 ]  
 
Proposal of study items for multi-layer/multi-technology converged transport networks     NTT   Q9/15, Q14/15, Q12/15, Q10/15   2012-08-29
[ 2387 ]  
 
Proposal of clarification of requirements for MPLS-TP p2mp transport path     NTT   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15   2012-08-29
[ 2386 ]  
 
10 G signal transmission in seeded DWDM system     LG-Ericsson   Q6/15   2012-08-29
[ 2385 ]  
 
Comparison of proposed low cost DWDM system     LG-Ericsson   Q6/15   2012-08-29
[ 2384 ]  
(Rev.1) 
Boundary clock in networks and simulations     Tellabs Oy   Q13/15   2012-08-28
[ 2383 ]  
(Rev.1) 
Boundary clock simulation model     Tellabs Oy   Q13/15   2012-08-28
[ 2382 ]  
 
Not used  
Duplicate of C-2383
 
N/A     2012-08-28
[ 2381 ]  
(Rev.1) 
G.8265.1 supported duration of negotiated service     Tellabs Oy   Q13/15   2012-08-28
[ 2380 ]  
 
G.fast: Minimum Duration of Transmission Opportunity     Huawei Technologies Co. Ltd.   Q4A/15   2012-08-28
[ 2379 ]  
 
G.hn: Adding pre-defined BATs with bit loading up to 30MHz for an Amendment to G.9960     Sigma Designs Israel S.D.I Ltd.   Q4B/15   2012-08-28
[ 2378 ]  
 
Reversion fails at simultaneous clear SFs in PSC based MPLS-TP linear protection     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2012-08-28
[ 2377 ]  
 
G.fast: Per-Frame MAP     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2376 ]  
 
Proposal for determined Amendment 1 of G.9955 main body : EVM Evaluation     Yitran Communications Ltd.   Q4C/15   2012-08-28
[ 2375 ]  
 
Cooperation of G.781 and BMCA in telecom profile for time     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2012-08-28
[ 2374 ]  
 
PDV test pattern for G.8263     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2012-08-28
[ 2373 ]  
 
Proposal for G.epon specific managed entities     Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI)   Q2/15   2012-08-28
[ 2372 ]  
 
Proposal for G.epon related managed entities     Mitsubishi Electric Corporation , OKI Electric Industry Company Ltd. (OKI)   Q2/15   2012-08-28
[ 2371 ]  
 
Incorporation of agreed changes in G.8121.2     Cisco Systems, Inc.   Q9/15   2012-08-28
[ 2370 ]  
 
Comparison of protection interworking architectures using distributed G.8031     Electronics and Telecommunications Research Institute (ETRI)   Q9/15   2012-08-28
[ 2369 ]  
 
Coordination of G.698.2-related work within SG15     Deutsche Telekom AG   Q6/15   2012-08-28
[ 2368 ]  
 
Low-complexity DWDM system with self-seeded optical transceivers     Futurewei Technologies US R&D Center   Q6/15, Q2/15, Q12/15   2012-08-28
[ 2367 ]  
 
Proposal of inter-OLT communication in G.multi     Futurewei Technologies US R&D Center   Q2/15   2012-08-28
[ 2366 ]  
 
Definition of the "Tx power difference between polarizations" for G.698.2     Deutsche Telekom AG   Q6/15   2012-08-28
[ 2365 ]  
 
Discussion on G.poc upstream transmission     Futurewei Technologies US R&D Center   Q4A/15, Q2/15, Q1/15   2012-08-28
[ 2364 ]  
 
Comments on draft revised Recommendation G.872     Deutsche Telekom AG   Q12/15   2012-08-28
[ 2363 ]  
 
2.5G upstream GPON discussion     Futurewei Technologies US R&D Center   Q2/15   2012-08-28
[ 2362 ]  
 
Scope of G.8275.1     France Télécom Orange   Q13/15   2012-08-28
[ 2361 ]  
 
Review of G.8272 latest draft     France Télécom Orange   Q13/15   2012-08-28
[ 2360 ]  
 
G.8272: New Appendix describing possible PRTC locations     France Télécom Orange   Q13/15   2012-08-28
[ 2359 ]  
 
Results of PDV tolerance testing using sinusoidal patterns as defined in G.8263-Testing     France Télécom Orange   Q13/15   2012-08-28
[ 2358 ]  
 
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing     France Télécom Orange   Q13/15   2012-08-28
[ 2357 ]  
 
Development of a new Appendix of G.8261.1 on PDV generation testing     France Télécom Orange   Q13/15   2012-08-28
[ 2356 ]  
 
G.fast: Dynamic BW allocation     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2355 ]  
 
G.fast: Low Complexity FFT/IFFT Scheme     Telefon AB - LM Ericsson   Q4A/15   2012-08-28
[ 2354 ]  
 
G.fast: New cable model for wiring type B05a, CAD55     Telefon AB - LM Ericsson   Q4A/15   2012-08-28
[ 2353 ]  
 
G.fast: Are you willing to give up 6dB of performance gain???     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2352 ]  
 
G.fast: Updated measurements and modelling of CAD55 cable     Telefon AB - LM Ericsson   Q4A/15   2012-08-28
[ 2351 ]  
 
Scope of Q2, as applies to access vs. OTN     British Telecommunications Public Ltd. Co. (BT Plc) , China Telecommunications Corporation , Futurewei Technologies US R&D Center , Nippon Telegraph and Telephone Corporation (NTT)   Q6/15, Q2/15, Q12/15   2012-08-28
[ 2350 ]  
 
G.fast: On the adaptation of the G.998.4 DTU format to G.fast     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-28
[ 2349 ]  
(Rev.1) 
Modulation format for 100G in G.698.2     Deutsche Telekom AG   Q6/15   2012-08-28
[ 2348 ]  
 
G.fast: Principle Operations Of Layered Modulation     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2347 ]  
 
G.gen: VDSL: G.ploam: Corrigendum on "INPMIN-ROC"     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2346 ]  
 
VDSL: Amendment of Receiver Initiated SRA following an SOS procedure     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2345 ]  
 
G.gen: VDSL: G.ploam: Reporting parameter "Actual AELE-MODE"     Alcatel-Lucent Bell N.V.   Q4A/15   2012-08-28
[ 2344 ]  
 
Consequence of floor delay changes under tight PLL bandwidth     RAD Data Communications, Ltd.   Q13/15   2012-08-28
[ 2343 ]  
 
The TVL of Signaling message     Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2342 ]  
 
Proposal to finalize a Recommendation specifying APS based MPLS-TP linear protection for PTN applications     Italy   Q9/15, Q14/15, Q10/15   2012-08-28
[ 2341 ]  
 
The effect of MAC control pause operation for PTP synchronization     Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
Resultats:452 documents
Résultats :  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-23