Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 295 ]
|
2012-05-29 |
Korea (Rep. of)
|
Proposal for updated description to clause 5 and editorial changes for Q.WebMidCall
|
Q2/11
|
|
[ 294 ]
|
2012-05-29 |
Korea (Rep. of)
|
Proposed enhancement of Q.3230(formerly Q.nacp.M13) for consent
|
Q7/11
|
|
[ 293 ]
|
2012-05-29 |
Korea (Rep. of)
|
Proposed modification of revised X.603.1(2010) for Consent
Not yet uploaded
|
Q15/11
|
|
[ 292 ]
|
2012-05-29 |
Huawei Technologies Co. Ltd.
|
Proposed additions to support the resource reservation protocol in Q.3303.2 V2 (ex Q.3323.2)
|
Q5/11
|
|
[ 291 ]
|
2012-05-29 |
Huawei Technologies Co. Ltd.
|
Proposed additions to support Pull mode package in Q.3303.2 v2 (ex Q.3323.2)
Not yet uploaded
|
Q5/11
|
|
[ 290 ]
|
2012-05-29 |
Huawei Technologies Co. Ltd.
|
Proposed additions to support IP Realm Availability Package in Q.3303.2 v2 (ex Q.3323.2)
Not yet uploaded
|
Q5/11
|
|
[ 289 ]
|
2012-05-29 |
NEC Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Proposed draft Q.OIP/OIR
To be verified by TSB
|
Q3/11
|
|
[ 288 ]
|
2012-05-29 |
NEC Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
Proposed text and appendix to the draft Q.MMtesting
To be verified by TSB
|
Q10/11
|
|
[ 287 ]
|
2012-05-29 |
NEC Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
HATS Interoperability event on NGN supported by ITU
To be verified by TSB
|
Q8/11
|
|
[ 286 ]
|
2012-05-29 |
Huawei Technologies Co. Ltd.
|
Proposed ways to support IPv6 HSI in Q.IPv6ProBB
|
Q16/11
|
|
[ 285 ]
|
2012-05-29 |
A1 Telekom Austria AG
|
NGN Supplementary Service Descriptions for Q.OIP/OIR
|
Q8/11, Q3/11
|
|
[ 284 ]
(Rev.1) |
2012-05-28 |
KT
|
Proposed detailed description to Clause 6 Signalling requirements for Q.WebMidCall
|
Q2/11
|
|
[ 283 ]
(Rev.1) +Add.1 |
2012-05-28 |
Universidad Del País Vasco
|
Proposal: Collaborative testing platform for extensive QoS experimental scenarios
To be verified by TSB
|
Q11/11
|
|
[ 282 ]
(Rev.1) |
2012-05-27 |
A1 Telekom Austria AG
|
Q.3930 - Performance Testing of Distributed Systems; Concepts and Terminology
|
Q11/11, Q10/11
|
|
[ 281 ]
(Rev.1) |
2012-05-27 |
A1 Telekom Austria AG
|
A.5 Justification for draft recommendation: Q.3940 - NGN/IMS interconnection tests between national network operators or international network operators at the Ic Interface
|
Q8/11
|
|
[ 280 ]
(Rev.1) |
2012-05-27 |
A1 Telekom Austria AG
,
Deutsche Telekom
|
Q.3940- NGN/IMS interconnection tests between national network operators or international network operators at the Ic Interface
|
Q8/11
|
|
[ 279 ]
|
2012-05-24 |
Applied Communication Sciences
|
Updates to draft TRQ.ets-protocol - Signalling Protocol Mappings in Support of Emergency Telecommunications Service in IP Networks
|
Q13/11
|
|
[ 278 ]
|
2012-05-24 |
Applied Communication Sciences
|
Postpone the Consent of Draft Revised Recommendation Q.3303.3 (Version 3)
|
Q5/11
|
|
[ 277 ]
|
2012-05-24 |
China
,
Huawei Technologies Co. Ltd.
|
Propose a new work item on signalling requirements for NGN real-time multimedia services supporting IPv6 transition
|
Q16/11
|
|
[ 276 ]
|
2012-05-24 |
Russian Federation
|
Draft new SG11 Question Q. TaaS "Testing as a service (TaaS): ITU cloud" for next study period
|
Q9/11, Q8/11, Q12/11, Q11/11, Q10/11
|
|
[ 275 ]
|
2012-05-23 |
Russian Federation
|
Draft new SG11 Question Q.CT "Content reference model and monitoring" for the next ITU-T study period
|
Q9/11, Q8/11, Q12/11, Q11/11, Q10/11
|
|
[ 274 ]
|
2012-05-23 |
Russian Federation
|
Draft new SG11 Question Q.CL "Cloud interoperability testing" for next study period
|
Q9/11, Q8/11, Q12/11, Q11/11, Q10/11
|
|
[ 273 ]
|
2012-05-23 |
Russian Federation
|
Draft new SG11 Question Q.bench "Service and networks benchmarking" for next study period
|
Q9/11, Q8/11, Q12/11, Q11/11, Q10/11
|
|
[ 272 ]
|
2012-05-23 |
Russian Federation
|
Proposal: new draft Recommendation ITU-T Q.MSPQuality "The signaling protocol of the quality of service monitoring system for controlling and data exchanging"
|
Q9/11, Q11/11
|
|
[ 271 ]
(Rev.1) |
2012-05-22 |
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Proposed update to draft Q.3303.1v2
|
Q5/11
|
Results:294 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):