International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : WP 2/11, 3/11 & 4/11 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  TD (2011-05-13) 

ITU-T SG 11

Signalling requirements and protocols

Study Period 2009

WP 2/11, 3/11 & 4/11

held in Switzerland [Geneva]

Other Meetings : 2012-06-11  2012-02-17  2011-10-17  2011-05-20  [ /11 & 4/11 ]  2011-01-24  2010-09-10  2010-04-26  2010-01-28  2009-09-02  2009-05-21  2009-01-19 

Results:45 total items.
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 672-GEN ]  
(Rev.1) 
2011-05-13 TSB   Final List of Participants     QALL/11  
[ 671-GEN ]  
 
2011-05-13 Chairman, WP2/11   oLS-Update on FSA signalling draft Recommendation Q.Flowstatesig     Q5/11  
[ 670-GEN ]  
(Rev.1) 
2011-05-13 Rapporteur, Q1/11   Q1/11 Meeting Report     Q1/11  
[ 669-GEN ]  
 
2011-05-13 Editor   A.5 Justification for draft Recommendation Q.3612     Q3/11, Q2/11  
[ 668-GEN ]  
 
2011-05-13 Editors   Draft new Recommendation Q.3612 (formerly Q.centrexSig) for consent     Q3/11, Q2/11  
[ 667-GEN ]  
(Rev.1) 
2011-05-13 Rapporteurs, Qs2&3/11   Q2&Q.3/11 joint Meeting Report     Q3/11, Q2/11  
[ 666-GEN ]  
 
2011-05-13 Chairman, WP4/11   Working Party 4/11 Meeting Report (Geneva, 13 May 2011)     Q12/11, Q11/11, Q10/11, Q9/11, Q8/11  
[ 665-GEN ]  
(Rev.1) 
2011-05-13 Rapporteur, Q12/11   Q.12/11 meeting report     Q12/11  
[ 664-GEN ]  
(Rev.1) 
2011-05-13 Chairman, WP4/11   oLS-Reply on JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups     Q11/11, Q10/11, Q8/11  
[ 663-GEN ]  
(Rev.1) 
2011-05-13 Chairman, WP4/11   oLS-Q. real-time multimedia service testing at NGN UNI     Q10/11  
[ 662-GEN ]  
 
2011-05-13 Rapporteur, Q7/11   Q7/11 meeting report (IoT-GSI, May 2011)     Q7/11  
[ 661-GEN ]  
 
2011-05-13 Rapporteur, Q7/11   Q.7/11 meeting report (May 2011)     Q7/11  
[ 660-GEN ]  
(Rev.1) 
2011-05-13 Chairman, WP3/11   Draft Working Party 3/11 Meeting Report (Geneva, 13 May 2011)     Q15/11, Q7/11, Q6/11  
[ 659-GEN ]  
(Rev.1-2) 
2011-05-13 Chairman, WP3/11   WP3/11 Work Programme     Q15/11, Q7/11, Q6/11  
[ 658-GEN ]  
 
2011-05-13 Rapporteur, Q9/11   Q.9/11 meeting Report     Q9/11  
[ 657-GEN ]  
(Rev.1) 
2011-05-13 Chairman, WP2/11   Draft report of Working Party 2/11 meeting, Geneva, 13 May 2011     Q5/11, Q4/11, Q3/11  
[ 656-GEN ]  
 
2011-05-13 Rapporteur, Q11/11   Q.11/11 Report     Q11/11  
[ 655-GEN ]  
 
2011-05-13 Rapporteur, Q10/11   Q.10/11 Report     Q10/11  
[ 654-GEN ]  
 
2011-05-13 Rapporteur, Q8/11   Q.8/11 Report     Q8/11  
[ 653-GEN ]  
 
2011-05-13 Editor   Justification of ETSI document ETSI TS 186 001- 4 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 4: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification for SIP-SIP     Q8/11  
[ 652-GEN ]  
 
2011-05-13 Editor   Justification of ETSI document ETSI TS 186 001-3 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 3: Test Suite Structure and Test Purposes (TSS&TP) for SIP-SIP     Q8/11  
[ 651-GEN ]  
 
2011-05-13 Editor   A.5 Justification for Draft Recommendation Q.3203     Q7/11  
[ 650-GEN ]  
 
2011-05-13 Editor   Draft new Recommendation Q.3203 (formerly Q.nacf.mob2) for consent     Q7/11  
[ 649-GEN ]  
 
2011-05-13 Editor   A.5 justification for Draft Recommendation Q.3325     Q5/11  
[ 648-GEN ]  
(Rev.1) 
2011-05-13 Editor   Draft new Recommendation Q.3325 for consent     Q5/11  
[ 647-GEN ]  
 
2011-05-13 Rapporteur, Q6/11   Q.6/11 Report     Q6/11  
[ 646-GEN ]  
 
2011-05-13 Chairman, WP3/11   oLS-Handbook on Testing     Q6/11  
[ 645-GEN ]  
 
2011-05-13 Rapporteur   Report of the Q.5/11 (Resource control and signalling requirements and protocols) meeting     Q5/11  
[ 644-GEN ]  
 
2011-05-12 Editor   Clean output draft Recommendation Q.3948 Service testing framework for VoIP at NGN UNI     Q10/11  
[ 643-GEN ]  
 
2011-05-12 Editor   A.5 Justification for draft Recommendation Q. 3948     Q10/11  
[ 642-GEN ]  
 
2011-05-12 Editors   Draft of Handbook on "testing and monitoring Network performance testing and control for guarantee required QoS for NGN services"     Q11/11, Q6/11  
[ 641-GEN ]  
 
2011-05-12 Editor   Q.3941.4 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 4: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification for SIP-SIP     Q8/11  
[ 640-GEN ]  
 
2011-05-12 Editor   Q.3941.3 Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-SIP     Q8/11  
[ 639-GEN ]  
 
2011-05-12 Editor   Q.3941.2 - Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 2: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) proforma specification     Q8/11  
[ 638-GEN ]  
 
2011-05-12 Editor   Q.3941.1 - Network Integration Testing between SIP and ISDN/PSTN network signalling protocols; Part 1: Test Suite Structure and Test Purposes (TSS&TP) for SIP-ISDN     Q8/11  
[ 636-GEN ]  
 
2011-05-12 Chairmen, WP 2,3,4/11   Draft agenda of Working Party 2, 3 and 4/11 meeting, Geneva, 13 May 2011     Q15/11, Q12/11, Q11/11, Q10/11, Q9/11, Q8/11, Q7/11, Q6/11, Q5/11, Q4/11, Q3/11  
[ 635-GEN ]  
 
2011-05-02 ITU-T SG17   iLS-Liaison on definitions and terminology      
[ 634-GEN ]  
 
2011-04-29 ITU-T SG17   iLS-Liaison on template for proposed new Recommendation     QALL/11  
[ 633-GEN ]  
 
2011-04-29 JCA-CIT   iLS-JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups     QALL/11  
[ 632-GEN ]  
 
2011-04-19 ITU-T SG11   oLS-Reply LS to JCA-IoT on invitation to the IoT-GSI     QALL/11  
[ 631-GEN ]  
 
2011-04-18 JCA-AHF   iLS-Liaison to ITU-T SG17 on Child Online Protection (COP)     QALL/11  
[ 630-GEN ]  
 
2011-04-18 ITU-T SG3   iLS-NGN studies     Q1/11  
[ 629-GEN ]  
 
2011-03-24 ITU-T SG9   iLS-LS to TSAG on revision of Question 1/9 and deletion of Question 13/9     QALL/11  
[ 628-GEN ]  
 
2011-03-22 Convener, JCA-IoT   iLS-LS to all ITU-T Study Groups on invitation to the IoT-GSI     QALL/11  
[ 627-GEN ]  
 
2011-03-22 Leader, TSAG Corr. Group, Strategic & Op. Plan   iLS-Draft LS highlighting the changes of ITU-T portion of PP. Res. 71(Strategic plan) from (2008-20011) to (2012-2015)     QALL/11  
Results:45 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2011-05-13