|
Number |
Date
|
Source
|
Title
|
Questions
|
| |
Number |
Posted |
Size
|
|
|
| |
|
[ TD 1029-GEN ]
|
2012-02-06 |
TSB
|
RESOLUTION ITU-R 60 - Reduction of energy consumption for environmental protection and mitigating climate change by use of ICT/radiocommunication technologies and systems
|
Q17/5, Q18/5, Q19/5, Q21/5, Q22/5, Q23/5
|
|
[ TD 1029-GEN ] - English - Word 2010 |
2012-02-06 [16:37]
|
33'271 bytes |
|
| |
|
[ COL 9 ]
|
2012-01-30 |
SG 5
|
Meeting of Study Group 5, Geneva, 11-19 April 2012
|
N/A
|
|
[ COL 9 ] - English - Word 2010 |
2012-01-30 [12:24]
|
75'844 bytes |
|
| |
|
[ TD 1028-GEN ]
|
2012-01-20 |
IEC TC 100
|
Incoming LS: Liaison letter to ITU-T SG5 on universal Li-ion battery solution
|
Q21/5
|
|
[ TD 1028-GEN ] - English - Zip (Document) |
2012-01-20 [11:37]
|
22'359 bytes |
|
| |
|
[ TD 1025-GEN ]
|
2012-01-20 |
ITU-T SG15
|
Incoming LS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs
|
QALL/5
|
|
[ TD 1025-GEN ] - English - Word |
2012-01-20 [11:37]
|
60'416 bytes |
|
| |
|
[ TD 1026-GEN ]
|
2012-01-20 |
JCA-AHF
|
Incoming LS: Liaison Statement on wireless hearing aid compatibility
|
QALL/5
|
|
[ TD 1026-GEN ] - English - Zip (Document) |
2012-01-20 [11:37]
|
91'548 bytes |
|
| |
|
[ TD 1027-GEN ]
|
2012-01-20 |
TSAG
|
Incoming LS: Contributions by Study Groups to CWG-WCIT12
|
QALL/5
|
|
[ TD 1027-GEN ] - English - Word |
2012-01-20 [11:37]
|
65'536 bytes |
|
| |
|
[ TD 1024-GEN ]
|
2012-01-20 |
ITU-T FG Cloud
|
Incoming LS: LS - ITU-T FG Cloud final output documents
|
QALL/5
|
|
[ TD 1024-GEN ] - English - Zip (Document) |
2012-01-20 [11:36]
|
9'861'059 bytes |
|
| |
|
[ C 378 ]
|
2012-01-13 |
Russian Federation
|
Cellular network with capacity transfer
|
Q22/5
|
|
[ C 378 ] - Russian - Word 2010 |
2012-01-23 [14:28]
|
791'302 bytes |
|
|
[ C 378 ] - English - Word |
2012-01-13 [14:52]
|
540'672 bytes |
|
| |
|
[ R 9 ]
|
2011-12-20 |
SG 5
|
Report of the meeting of Study Group 5 (Seoul, 20-28 September 2011)
|
QALL/5
|
|
[ R 9 ] - English - Zip (Document) |
2011-12-20 [09:45]
|
188'702 bytes |
|
|
[ R 9 ] - English - Word |
2011-12-20 [09:45]
|
1'065'472 bytes |
|
| |
|
[ TD 1023-GEN ]
|
2011-12-15 |
ITU-T Liaison Officer to JTC 1
|
Conclusions of the second ITU-T | JTC 1 joint leadership meeting, 6 November 2011
|
QALL/5
|
|
[ TD 1023-GEN ] - English - Zip (Document) |
2011-12-15 [15:24]
|
109'588 bytes |
|
| |
|
[ TD 1021-GEN ]
|
2011-12-15 |
ITU-T SG16
|
Incoming LS: Reply LS to TSAG, JCA-CIT and ITU-T SGs on draft document on Conformance and Interoperability Testing (CIT) needs for review and comment by the Study Groups (JCA-CIT-LS4)
|
QALL/5
|
|
[ TD 1021-GEN ] - English - Word |
2011-12-15 [15:01]
|
53'248 bytes |
|
| |
|
[ TD 1022-GEN ]
|
2011-12-15 |
ITU-T SG16
|
Incoming LS: LS to TSAG and ITU-T SGs on pre-defined form to document the establishment of work items towards new Recommendations
|
QALL/5
|
|
[ TD 1022-GEN ] - English - Word |
2011-12-15 [15:02]
|
50'688 bytes |
|
| |
|
[ TD 1018-GEN ]
|
2011-12-15 |
JCA-AHF
|
Incoming LS: LS from JCA-AHF on Meeting report of Joint Coordination Activity on Accessibility and Human Factors (JCA-AHF)
|
QALL/5
|
|
[ TD 1018-GEN ] - English - Word |
2011-12-15 [15:01]
|
209'408 bytes |
|
| |
|
[ TD 1019-GEN ]
|
2011-12-15 |
ITU-R WP5D
|
Incoming LS: Techniques to mitigate disturbance/interference between radio devices and cable or equipment connected to broadband networks and TV networks
|
Q8/5
|
|
[ TD 1019-GEN ] - English - Word |
2011-12-15 [15:01]
|
161'792 bytes |
|
| |
|
[ TD 1020-GEN ]
|
2011-12-15 |
ITU-T SG9
|
Incoming LS: Reply LS on ITU-T work on possible disturbance/interference between radio devices and broadband cable and TV networks
|
Q8/5
|
|
[ TD 1020-GEN ] - English - Word |
2011-12-15 [15:01]
|
59'904 bytes |
|
| |
|
[ TD 1015-GEN ]
|
2011-12-15 |
ETSI TC EE
|
Incoming LS: Liaison to ITU-T SG5 on control/monitoring and telecom performance metric standard
|
Q17/5
|
|
[ TD 1015-GEN ] - English - Word |
2011-12-15 [15:00]
|
83'968 bytes |
|
| |
|
[ TD 1016-GEN ]
|
2011-12-15 |
ETSI TC EE
|
Incoming LS: ETSI TC-EE Work Item on network level power
|
Q17/5
|
|
[ TD 1016-GEN ] - English - Zip (Document) |
2011-12-15 [15:00]
|
132'912 bytes |
|
| |
|
[ TD 1017-GEN ]
|
2011-12-15 |
ITU-T SG9
|
Incoming LS: Reply to JCA-CIT (Ref: JCA-CIT-LS 4-E) on draft document on CIT needs
|
QALL/5
|
|
[ TD 1017-GEN ] - English - Word |
2011-12-15 [15:00]
|
59'904 bytes |
|
| |
|
[ TD 1014-GEN ]
|
2011-12-15 |
ITU-T SG11
|
Incoming LS: Draft Handbook on "Network performance testing and control monitoring for guarantee required QoS for NGN services"
|
QALL/5
|
|
[ TD 1014-GEN ] - English - Zip (Document) |
2011-12-15 [15:00]
|
8'476'529 bytes |
|
| |
|
[ TD 1011-GEN ]
|
2011-12-15 |
ETSI TC EE
|
Incoming LS: Approval of ETSI TS 103 199
|
Q18/5
|
|
[ TD 1011-GEN ] - English - Word |
2011-12-15 [14:59]
|
86'016 bytes |
|
| |
|
[ TD 1012-GEN ]
|
2011-12-15 |
ITU-T SG11
|
Incoming LS: Request for feedback on draft revision of Supplement 62 to ITU-T Q series Recommendations
|
QALL/5
|
|
[ TD 1012-GEN ] - English - Zip (Document) |
2011-12-15 [14:59]
|
171'207 bytes |
|
| |
|
[ TD 1013-GEN ]
|
2011-12-15 |
ITU-T SG11
|
Incoming LS: Reply to [JCA-CIT - LS 5 - E] regarding JCA-CIT draft document on Conformance and Interoperability Testing (CIT) needs
|
QALL/5
|
|
[ TD 1013-GEN ] - English - Word |
2011-12-15 [14:59]
|
61'952 bytes |
|
| |
|
[ TD 1009-GEN ]
|
2011-12-13 |
ITU-T Liaison officer to JTC 1
|
Report of the ISO/IEC JTC 1 Plenary meeting, 7-12 November 2011
|
QALL/5
|
|
[ TD 1009-GEN ] - English - Word |
2011-12-15 [14:58]
|
66'048 bytes |
|
Results: 27 total items.
Result Page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):