Contributions  |
|
Numéro
|
Date
|
Source
|
Titre
|
Questions
|
|
[ 39 ]
|
2009-05-19 |
Swisscom Ltd.
|
Comments and suggestions for an automatic long term EMF measurement system
|
Q3/5
|
|
[ 38 ]
|
2009-05-19 |
Bourns Inc.
|
Draft Revision of Rec. K.30rev/K.ocp
|
Q13/5
|
|
[ 37 ]
|
2009-05-15 |
BT
,
FT
,
Telecom Italia
|
Proposed new question and their related Study Groups on 'Energy Saving Requirements for ICTs over the lifecycle'
|
QALL/5
|
|
[ 36 ]
|
2009-05-15 |
BT
|
Proposed new question and their related Study Groups on 'ICTs for GHG abatement in buildings'
|
QALL/5
|
|
[ 35 ]
|
2009-05-15 |
BT
|
Proposed new question and their related Study Groups on 'ICTs for GHG reduction by travel substitution'
|
QALL/5
|
|
[ 34 ]
|
2009-05-15 |
BT
,
NSN Germany
|
Proposed new question and related Study Groups on 'Technologies for Carbon Labelling over the Lifecycle"
|
QALL/5
|
|
[ 33 ]
|
2009-05-15 |
ANATEL, Brazil
|
Determination of Relevant Measurement Points
|
Q3/5
|
|
[ 32 ]
|
2009-05-15 |
ANATEL, Brazil
|
Inputs from Brazil to K.Guide
|
Q3/5
|
|
[ 31 ]
|
2009-05-14 |
Telekomunikacja Polska, Poland
|
Working document toward draft new Recommendation K.guide
|
Q3/5
|
|
[ 30 ]
|
2009-05-14 |
Telekomunikacja Polska, Poland
|
Editorial errors in ITU-T Recommendation K.52
|
Q3/5
|
|
[ 29 ]
|
2009-05-14 |
Telekomunikacja Polska, Poland
|
Comparison between measurement and calculations of the EMF
|
Q3/5
|
|
[ 28 ]
|
2009-05-14 |
Republic of Korea
|
A proposal on the structure of a new WP for climate change issues
|
QALL/5
|
|
[ 27 ]
|
2009-05-14 |
Republic of Korea
|
Field experiments to confirm the error rate by deviated potential probe positioning in the fall-of-potential earth resistance measurement method
|
Q6/5
|
|
[ 26 ]
|
2009-05-14 |
KT, Korea
|
Test results on conductive coupling effects when measure induced voltage on telecommunication line near a.c. traction line with AT feeding system in Korea
|
Q9/5
|
|
[ 25 ]
|
2009-05-14 |
Republic of Korea
|
Proposal of measurement time reduction for exposure assessment
|
Q3/5
|
|
[ 24 ]
|
2009-05-14 |
NTT
,
BT
,
FT
,
Fujitsu
|
Proposed new questions and their related Study Groups on ICT and Climate Change
|
QALL/5
|
|
[ 23 ]
|
2009-05-14 |
ZTE Corporation
|
Proposed test condition for PTN immunity test
|
Q12/5
|
|
[ 22 ]
|
2009-05-14 |
China Mobile Communications Corp.
|
Proposal for Recommendation K.guide: Calculation and measurements for exposure assessment of adaptive antennas
|
Q3/5
|
|
[ 21 ]
|
2009-05-14 |
MIIT, China
|
Conducted electromagnetic environment research in home networking
|
Q8/5
|
|
[ 20 ]
|
2009-05-14 |
CIAJ
|
Test results of "Broadband impulsive conducted disturbances"
|
Q8/5
|
|
[ 19 ]
|
2009-05-14 |
Thailand
|
Measurement time for EMF exposure assessment
|
Q3/5
|
|
[ 18 ]
|
2009-04-08 |
Germany
|
Automatic Long Term EMF Measurement System
|
Q3/5
|
Resultats:22 documents
|
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):