International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 3 : Meeting 2009-01-19 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 3  TD (2009-01-19) 

ITU-T SG 3

Tariff and accounting principles including related telecommunication economic and policy issues

Study Period 2009

Meeting  from 2009-01-19 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-09-03  2012-01-16  2011-03-28  2010-05-17  2009-09-21  [ 2009-01-19 ] 

Results:42 total items.
Result page:  1 - 2  - Next Next
Temporary Documents  (PLEN)   Documents / Contributions
 
Number 
Received Source Title Questions
[ 42-PLEN ]  
 
2009-01-23 Rapporteur, Mobile Roaming   OUTGOING LS - ITU-T Study Group 3 Rapporteur Group on Mobile Roaming     Q2/3  
[ 41-PLEN ]  
 
2009-01-23 ITU-T SG3   OUTGOING LS - Accessibility and Resolution 70 (WTSA-08) "Telecommunication/information and communication technology accessibility for persons with disabilities"     QALL/3  
[ 40-PLEN ]  
 
2009-01-22 Convenor, JCA-AHF   LS - Accessibility and Resolution 70 (WTSA-08) ?Telecommunication/information and communication technology accessibility for persons with disabilities?     QALL/3  
[ 39-PLEN ]  
(Rev.1) 
2009-01-22 Convener, ad-hoc   Working party 1 Ad Hoc on Traffic Flow Multifactors and Internet Traffic Flow Methodologies     Q1/3  
[ 38-PLEN ]  
(Rev.1) 
2009-01-22 Rapporteur   Report of the first meetingof the Rapporteur Group for dispute prevention and resolution     Q2/3  
[ 37-PLEN ]  
(Rev.1) 
2009-01-22 Rapporteur Group on mobile roaming   Terms of Reference for work on mobile roaming     Q2/3  
[ 36-PLEN ]  
(Rev.1) 
2009-01-12 TSB   Draft agenda for the meeting of the ad-hoc group on developing country issues     QALL/3  
[ 35-PLEN ]  
(Rev.1-2) 
2009-01-12 TSB   Report for Working Party 3/3     QALL/3  
[ 34-PLEN ]  
(Rev.1-2) 
2009-01-12 TSB   Report for Working Party 2/3     QALL/3  
[ 33-PLEN ]  
(Rev.1-2) 
2009-01-12 TSB   Report for Working Party 1/3     QALL/3  
[ 32-PLEN ]  
 
2009-01-08 TSB   Results of consultation with members ? TSB Circular 6     QALL/3  
[ 31-PLEN ]  
+Add.1-2 
2009-01-08 TSB   Tutorial on basic economics and telecommunications: Regulating Telecommunications Services     QALL/3  
[ 30-PLEN ]  
(Rev.1) 
2009-01-22 TSB   Report of the ad-hoc Group on Developing Country Issues     QALL/3  
[ 29-PLEN ]  
 
2008-12-18 N/A   NUMBER NOT ASSIGNED     N/A  
[ 28-PLEN ]  
(Rev.1) 
2009-01-21 Convenor, Ad-hoc Group   Draft Terms of Reference, expected output, time-line(s) for work, and proposed working methods for a Rapporteur's Group on infrastructure issues and mechanisms related to reducing costs for international Internet connectivity as called for in ITU-T Recommendation D.50     Q1/3  
[ 27-PLEN ]  
(Rev.1) 
2009-01-20 Chairman, SG3   OUTGOING LS - Contributions received from France for information     QALL/3  
[ 26-PLEN ]  
 
2008-12-17 Chairman, SG3   Reply to questionnaire by ICT&CC contained in the Summary Report of First Meeting, Geneva, 1-3 September     QALL/3  
[ 25-PLEN ]  
(Rev.1) 
2008-12-15 TSB   Regulator-operator disputes: the place of alternative dispute resolution (ADR) processes such as mediation and arbitration     Q2/3  
[ 24-PLEN ]  
 
2008-11-19 TSB   Call for papers - Second ITU-T Kaleidoscope "Innovations for Digital Inclusion"     QALL/3  
[ 23-PLEN ]  
 
2008-11-13 ITU-T SG2 (Geneva, 6-15 May 2008)   LS - Alternative Calling Procedure and Phantom Traffic (Ex TD 23 (WP3/3))     Q3/3  
[ 22-PLEN ]  
 
2008-11-13 TSB   Response from Director of BDT to document concerning accounting rates for calls terminating on mobile networks and transiting via the fixed network (Ex TD 42 (WP2/2))     Q2/3  
[ 21-PLEN ]  
 
2008-11-13 Chairman, SG3   Outgoing LS from Chairman to SG2: Recommendation E.cpnd ? International calling party number delivery (Ex TD 64 (WP1/3))     Q2/3  
[ 20-PLEN ]  
 
2008-11-13 ITU-T SG2 (Geneva, 6-15 May 2008)   LS - Recommendation E.cpnd - International calling party number delivery (Ex TD 63 (WP1/3))     Q2/3  
[ 19-PLEN ]  
 
2008-11-13 GSM Association   LS - Roaming hubbing - SCCP Translation Type (Ex TD 62 (WP1/3))     Q1/3  
[ 18-PLEN ]  
 
2008-11-12 TSB   Final report of ITU Workshop on IPv6, Geneva, 4-5 September 2008 (Ex TD 190 (PLEN/3))     QALL/3  
Results:42 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2009-01-23