International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : NGN-GSI : Meeting 2011-05-09 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T NGN-GSI  C (2011-05-09) 

ITU-T NGN-GSI

NGN Global Standards Initiative

Study Period 2009

Meeting  from 2011-05-09 to 2011-05-20

held in Switzerland [Geneva]

Other Meetings : 2012-12-03  2012-06-04  2012-02-06  2011-10-10  2011-01-17  2010-09-06  2010-04-19  2010-01-18  2009-09-02  2009-05-11  2009-01-12 

Results:257 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1137 ]  
 
Socio-economic Changes to Draft Recommendation Y.3001     Swiss Administration   Q21/13   2011-05-05
[ 1136 ]  
 
Proposed modifications to the draft Rec.Q.3909 "NGN interoperability"     NEC   Q8/11   2011-05-03
[ 1135 ]  
 
Proposed text to the draft Recommendation Rec Q.3948 "Q.VoIP service testing at NGN UNI"     NEC Corporation , OKI Electric Industry   Q10/11   2011-05-03
[ 1134 ]  
 
Proposed new work programme of real-time multimedia service testing at NGN UNI     NEC   Q10/11   2011-05-03
[ 1133 ]  
 
Proposed new work items of protocol for additional service of PSTN/ISDN Simulation services     NEC   Q3/11   2011-05-03
[ 1132 ]  
 
Editorial comments on draft Rec. Y.2205 rev 1     France Telecom   Q5/13   2011-05-03
[ 1131 ]  
 
Proposed update on Clause 9 of Y.FNvirt     ETRI   Q21/13   2011-05-03
[ 1130 ]  
 
Proposed update on Clause 8 of Y.FNvirt     ETRI   Q21/13   2011-05-03
[ 1129 ]  
 
Proposal for modification regarding "Framework of network virtualization for Future Networks"     Hitachi, Ltd.   Q21/13   2011-05-02
[ 1128 ]  
 
Edtorial modification regarding draft recommendation Y.3001     Hitachi, Ltd.   Q21/13   2011-05-02
[ 1127 ]  
 
Proposed Initiation of New Work Item for Autonomic Manageable Network Architecture for Future Networks     ETRI   Q21/13   2011-05-02
[ 1126 ]  
 
Proposal modifying the description of CDF in clause 7.2.4 of Y.dsnarch     NSN, ZTE   Q19/13   2011-05-02
[ 1125 ]  
 
Proposal modifying the description of FEs within CDF in clause 7.3.1 of Y.dsnarch     NSN, ZTE   Q19/13   2011-05-02
[ 1124 ]  
 
Proposal for modifying the description of FEs in RLF in 7.3.3 and modifying figure 7-5     NSN, China Mobile   Q19/13   2011-05-02
[ 1123 ]  
 
Proposal for modifying the RLF description in 7.2.2     Nokia Siemens Networks   Q19/13   2011-05-02
[ 1122 ]  
 
Proposal for deleting the descriptions of 7.1 DSN architecture framework     NSN, China Mobile   Q19/13   2011-05-02
[ 1121 ]  
 
Proposal for adding new references in chapter 2 in Y.dsnarch     NSN, China Mobile   Q19/13   2011-05-02
[ 1120 ]  
 
Proposal for adding an information flow to illustrate DSN MMTel in Appendix I     NSN, China Mobile   Q19/13   2011-05-02
[ 1119 ]  
 
Proposal for adding information flow for reference point C4 in 7.4.5     NSN, China Mobile   Q19/13   2011-05-02
[ 1118 ]  
 
Proposal for adding description in Annex A Relationship between DSN architecture and NGN architecture     NSN, China Mobile   Q19/13   2011-05-02
[ 1117 ]  
 
Proposed Requirements in the draft Recommendations, Y.vnc     ETRI   Q4/13   2011-05-02
[ 1116 ]  
 
Proposed Definitions in the Amendment of Y.2111 Rev.1 for Policy-based Charging and Control     ETRI   Q4/13   2011-05-02
[ 1115 ]  
 
Addition of Multi-connection Congestion Rate FE to the Multi-connection Access Control FE in the Multi-connection Architecture (Y.MC-ARCH)     InterDigital   Q9/13   2011-05-02
[ 1114 ]  
 
Addition of Multi-connection Retransmission Coordination FE to the Multi-connection Coordination Function in the Multi-connection Architecture (Y.MC-ARCH)     InterDigital   Q9/13   2011-05-02
[ 1113 ]  
 
Recommendation about network discovery flow     CATR,MIIT, P.R. China   Q19/13   2011-05-02
[ 1112 ]  
 
Recommendation about node ungraceful leaving for new session setup     CATR,MII P.R. China   Q19/13   2011-05-02
[ 1111 ]  
 
Recommendation about node graceful leaving for new session setup     CATR,MII P.R. China   Q19/13   2011-05-02
[ 1110 ]  
 
Proposal of adding performance management description in Y.dsnmmtel     China Mobile   Q19/13   2011-05-02
[ 1109 ]  
 
Proposal of adding configuration management description in Y.dsnmmtel     China Mobile   Q19/13   2011-05-02
[ 1108 ]  
 
Proposal of node load balancing in Y.dsnmmtel     CATR,MIIT P.R. China   Q19/13   2011-05-02
[ 1107 ]  
 
Proposal for new media control procedure in Y.MC-ARCH     China Mobile   Q9/13   2011-05-02
[ 1106 ]  
 
Proposal for new functions of Multi-connection Transport Function in Y.MC-ARCH     China Mobile   Q9/13   2011-05-02
[ 1105 ]  
 
Proposal for new functions of MMC-FE in Y.MC-ARCH     China Mobile   Q9/13   2011-05-02
[ 1104 ]  
 
Proposal for modification to content integrity protection in 7.6 of Y.dsn_sec_req     China Mobile   Q19/13   2011-05-02
[ 1103 ]  
 
Proposal for communication HOLD service of supplementary services support in chapter 9 of Y.dsnmmtel     CATR,MIIT P.R. China   Q19/13   2011-05-02
[ 1102 ]  
 
Proposal for adding a mapping table between security threats and correspondent requirement to Y.dsn_sec_req     China Mobile   Q19/13   2011-05-02
[ 1101 ]  
 
Proposal for adding a comparison in trust models between DSN and NGN to Y.dsn_sec_req     China Mobile   Q19/13   2011-05-02
[ 1100 ]  
 
Proposal for modifying the description of C9 reference point (between SCF and RF) and procedures of C9     Ericsson , China Mobile   Q19/13   2011-05-02
[ 1099 ]  
 
Proposal for modifying the description of C3 and adding procedures of C3 reference point in chapter 7.4.3 in Y.dsnarch     Ericsson , China Mobile   Q19/13   2011-05-02
[ 1098 ]  
 
Proposal for adding new descriptions in Conventions in Y.dsnarch.     Ericsson , China Mobile   Q19/13   2011-05-02
[ 1097 ]  
 
Proposal for adding new descriptions in 7.2.8 End User Functions.     Ericsson , China Mobile   Q19/13   2011-05-02
[ 1096 ]  
 
Proposal for adding information flow for reference point C7 (between SCF and RLF) in 7.4.9     Ericsson , China Mobile   Q19/13   2011-05-02
[ 1095 ]  
 
Proposal for adding descriptions in Summary and Keywords, and add History item in Y.dsnarch     Ericsson , China Mobile   Q19/13   2011-05-02
[ 1094 ]  
 
Proposal for adding description to C6 reference points (between EF and SCF) in 7.4.8     Ericsson , China Mobile   Q19/13   2011-05-02
[ 1093 ]  
(Rev.1) 
Proposed modifications to Q.3323.3 on stream synchronization     Huawei technologies Co. Ltd   Q5/11   2011-05-02
[ 1092 ]  
(Rev.1) 
Propose a new work item to define the protocol interaction of multicast transition from IPv4 to IPv6     Huawei technologies Co. Ltd   Q5/11   2011-05-02
[ 1091 ]  
 
Proposed baseline text of draft recommendation for iSCP architecture     Huawei Technologies Co., Ltd   Q20/13   2011-05-02
[ 1090 ]  
(Rev.1) 
Proposal to add some scenario description in Y.ipv6na     Huawei Technologies Co., Ltd.   Q7/13   2011-05-02
[ 1089 ]  
 
Proposed baseline text of draft recommendation for iSCP requirements     Huawei Technologies Co., Ltd   Q20/13   2011-05-02
[ 1088 ]  
 
Q.Flowstatesig is stable and ready for consent     Anagran Inc.   Q5/11   2011-05-02
Results:257 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25