Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1137 ]
|
Socio-economic Changes to Draft Recommendation Y.3001
|
Swiss Administration
|
Q21/13
|
2011-05-05 |
|
[ 1136 ]
|
Proposed modifications to the draft Rec.Q.3909 "NGN interoperability"
|
NEC
|
Q8/11
|
2011-05-03 |
|
[ 1135 ]
|
Proposed text to the draft Recommendation Rec Q.3948 "Q.VoIP service testing at NGN UNI"
|
NEC Corporation
,
OKI Electric Industry
|
Q10/11
|
2011-05-03 |
|
[ 1134 ]
|
Proposed new work programme of real-time multimedia service testing at NGN UNI
|
NEC
|
Q10/11
|
2011-05-03 |
|
[ 1133 ]
|
Proposed new work items of protocol for additional service of PSTN/ISDN Simulation services
|
NEC
|
Q3/11
|
2011-05-03 |
|
[ 1132 ]
|
Editorial comments on draft Rec. Y.2205 rev 1
|
France Telecom
|
Q5/13
|
2011-05-03 |
|
[ 1131 ]
|
Proposed update on Clause 9 of Y.FNvirt
|
ETRI
|
Q21/13
|
2011-05-03 |
|
[ 1130 ]
|
Proposed update on Clause 8 of Y.FNvirt
|
ETRI
|
Q21/13
|
2011-05-03 |
|
[ 1129 ]
|
Proposal for modification regarding "Framework of network virtualization for Future Networks"
|
Hitachi, Ltd.
|
Q21/13
|
2011-05-02 |
|
[ 1128 ]
|
Edtorial modification regarding draft recommendation Y.3001
|
Hitachi, Ltd.
|
Q21/13
|
2011-05-02 |
|
[ 1127 ]
|
Proposed Initiation of New Work Item for Autonomic Manageable Network Architecture for Future Networks
|
ETRI
|
Q21/13
|
2011-05-02 |
|
[ 1126 ]
|
Proposal modifying the description of CDF in clause 7.2.4 of Y.dsnarch
|
NSN, ZTE
|
Q19/13
|
2011-05-02 |
|
[ 1125 ]
|
Proposal modifying the description of FEs within CDF in clause 7.3.1 of Y.dsnarch
|
NSN, ZTE
|
Q19/13
|
2011-05-02 |
|
[ 1124 ]
|
Proposal for modifying the description of FEs in RLF in 7.3.3 and modifying figure 7-5
|
NSN, China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1123 ]
|
Proposal for modifying the RLF description in 7.2.2
|
Nokia Siemens Networks
|
Q19/13
|
2011-05-02 |
|
[ 1122 ]
|
Proposal for deleting the descriptions of 7.1 DSN architecture framework
|
NSN, China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1121 ]
|
Proposal for adding new references in chapter 2 in Y.dsnarch
|
NSN, China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1120 ]
|
Proposal for adding an information flow to illustrate DSN MMTel in Appendix I
|
NSN, China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1119 ]
|
Proposal for adding information flow for reference point C4 in 7.4.5
|
NSN, China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1118 ]
|
Proposal for adding description in Annex A Relationship between DSN architecture and NGN architecture
|
NSN, China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1117 ]
|
Proposed Requirements in the draft Recommendations, Y.vnc
|
ETRI
|
Q4/13
|
2011-05-02 |
|
[ 1116 ]
|
Proposed Definitions in the Amendment of Y.2111 Rev.1 for Policy-based Charging and Control
|
ETRI
|
Q4/13
|
2011-05-02 |
|
[ 1115 ]
|
Addition of Multi-connection Congestion Rate FE to the Multi-connection Access Control FE in the Multi-connection Architecture (Y.MC-ARCH)
|
InterDigital
|
Q9/13
|
2011-05-02 |
|
[ 1114 ]
|
Addition of Multi-connection Retransmission Coordination FE to the Multi-connection Coordination Function in the Multi-connection Architecture (Y.MC-ARCH)
|
InterDigital
|
Q9/13
|
2011-05-02 |
|
[ 1113 ]
|
Recommendation about network discovery flow
|
CATR,MIIT, P.R. China
|
Q19/13
|
2011-05-02 |
|
[ 1112 ]
|
Recommendation about node ungraceful leaving for new session setup
|
CATR,MII P.R. China
|
Q19/13
|
2011-05-02 |
|
[ 1111 ]
|
Recommendation about node graceful leaving for new session setup
|
CATR,MII P.R. China
|
Q19/13
|
2011-05-02 |
|
[ 1110 ]
|
Proposal of adding performance management description in Y.dsnmmtel
|
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1109 ]
|
Proposal of adding configuration management description in Y.dsnmmtel
|
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1108 ]
|
Proposal of node load balancing in Y.dsnmmtel
|
CATR,MIIT P.R. China
|
Q19/13
|
2011-05-02 |
|
[ 1107 ]
|
Proposal for new media control procedure in Y.MC-ARCH
|
China Mobile
|
Q9/13
|
2011-05-02 |
|
[ 1106 ]
|
Proposal for new functions of Multi-connection Transport Function in Y.MC-ARCH
|
China Mobile
|
Q9/13
|
2011-05-02 |
|
[ 1105 ]
|
Proposal for new functions of MMC-FE in Y.MC-ARCH
|
China Mobile
|
Q9/13
|
2011-05-02 |
|
[ 1104 ]
|
Proposal for modification to content integrity protection in 7.6 of Y.dsn_sec_req
|
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1103 ]
|
Proposal for communication HOLD service of supplementary services support in chapter 9 of Y.dsnmmtel
|
CATR,MIIT P.R. China
|
Q19/13
|
2011-05-02 |
|
[ 1102 ]
|
Proposal for adding a mapping table between security threats and correspondent requirement to Y.dsn_sec_req
|
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1101 ]
|
Proposal for adding a comparison in trust models between DSN and NGN to Y.dsn_sec_req
|
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1100 ]
|
Proposal for modifying the description of C9 reference point (between SCF and RF) and procedures of C9
|
Ericsson
,
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1099 ]
|
Proposal for modifying the description of C3 and adding procedures of C3 reference point in chapter 7.4.3 in Y.dsnarch
|
Ericsson
,
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1098 ]
|
Proposal for adding new descriptions in Conventions in Y.dsnarch.
|
Ericsson
,
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1097 ]
|
Proposal for adding new descriptions in 7.2.8 End User Functions.
|
Ericsson
,
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1096 ]
|
Proposal for adding information flow for reference point C7 (between SCF and RLF) in 7.4.9
|
Ericsson
,
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1095 ]
|
Proposal for adding descriptions in Summary and Keywords, and add History item in Y.dsnarch
|
Ericsson
,
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1094 ]
|
Proposal for adding description to C6 reference points (between EF and SCF) in 7.4.8
|
Ericsson
,
China Mobile
|
Q19/13
|
2011-05-02 |
|
[ 1093 ]
(Rev.1) |
Proposed modifications to Q.3323.3 on stream synchronization
|
Huawei technologies Co. Ltd
|
Q5/11
|
2011-05-02 |
|
[ 1092 ]
(Rev.1) |
Propose a new work item to define the protocol interaction of multicast transition from IPv4 to IPv6
|
Huawei technologies Co. Ltd
|
Q5/11
|
2011-05-02 |
|
[ 1091 ]
|
Proposed baseline text of draft recommendation for iSCP architecture
|
Huawei Technologies Co., Ltd
|
Q20/13
|
2011-05-02 |
|
[ 1090 ]
(Rev.1) |
Proposal to add some scenario description in Y.ipv6na
|
Huawei Technologies Co., Ltd.
|
Q7/13
|
2011-05-02 |
|
[ 1089 ]
|
Proposed baseline text of draft recommendation for iSCP requirements
|
Huawei Technologies Co., Ltd
|
Q20/13
|
2011-05-02 |
|
[ 1088 ]
|
Q.Flowstatesig is stable and ready for consent
|
Anagran Inc.
|
Q5/11
|
2011-05-02 |
Results:257 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):