International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2008-01-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  C (2008-01-14) 

ITU-T SG13

Project management and coordination; Architectures and internetworking principles; Multi-protocol networks and mechanisms; Network performance and resource management

Study Period 2005

Meeting  from 2008-01-14 to 2008-01-25

held in Korea (Rep. of) [Seoul]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2007-09-21  2007-04-16  2006-11-03  2006-07-17  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Results:260 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 560 ]  
 
2008-01-15 ETRI   Proposed texts for section 7 of draft Recommendation Y.ipsplit     Q3/13  
[ 559 ]  
 
2008-01-15 ETRI   Revised Draft of Y.ipv6-NGN "General Overview of IPv6 based NGN"     Q9/13  
[ 558 ]  
 
2008-01-15 ETRI   Proposed texts for the IPv6-based NGN in NGN-R2-Reqts     Q9/13, Q2/13  
[ 557 ]  
 
2008-01-15 ETRI   Additional Text of Appendix II for Example of IPTV Multicast VPN     Q3/13, IPTV-GSI  
[ 556 ]  
 
2008-01-17 N/A   WITHDRAWN      
[ 555 ]  
 
2008-01-17 N/A   WITHDRAWN      
[ 554 ]  
 
2008-01-17 N/A   WITHDRAWN      
[ 553 ]  
 
2008-01-14 France Telecom   On the integrity and the stability of the WG1 deliverables of the FG IPTV     QALL/13, IPTV-GSI  
[ 552 ]  
 
2008-01-11 Huawei Technologies Co., Ltd.   Proposal of Peer-to-Peer Approach for Distributed Content Distribution     Q7/11, Q3/13, Q3/11, Q2/13, Q1/11, IPTV-GSI  
[ 551 ]  
 
2008-01-11 China Telecom   Proposal on adding study item and task in Q13/SG12 for IPTV performance monitoring     Q4/13, IPTV-GSI  
[ 550 ]  
 
2008-01-11 China Telecom   Proposal on IGMP Filter in DOC-0190     Q3/13, Q2/13, Q2/11, Q1/11, IPTV-GSI  
[ 549 ]  
 
2008-01-09 VeriSign   Roadmap for Critical Identity Management Capabilities for NGN and Nomadicity     Q15/13, Q3/13, Q6/17, IDM-GSI  
[ 548 ]  
 
2008-01-09 VeriSign   Applying Identity Management Requirements to NGN work     IDM-GSI, QALL/13, Q6/17  
[ 547 ]  
 
2008-01-09 France Telecom   IPTV Architecture - Completion of the document reorganization     IPTV-GSI, Q3/13  
[ 546 ]  
 
2008-01-09 ETRI   Proposed Requirements in Y.ngn-account-R2     Q2/13  
[ 545 ]  
 
2008-01-09 ETRI   Proposed General Architecture in Y.ngn-account-R2     Q4/13, Q2/13  
[ 544 ]  
 
2008-01-09 France Telecom   Proposed modifications to Draft Recommendation Y.NACF-R1     Q3/13  
[ 543 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 9 Procedures in Y.mpm     Q4/13  
[ 542 ]  
(Rev.1) 
2008-01-08 ETRI   Additional description on Rn and Rc reference point for y.racf-mpls centralized architecture     Q4/13  
[ 541 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 7. Reference Measurement Network Model in Y.mpm     Q4/13  
[ 540 ]  
 
2008-01-08 ETRI   Proposed modifications on one-to-many real-time multicast scenario (appendix IV of Y.ngn-mcastsf)     Q2/13  
[ 539 ]  
 
2008-01-08 ETRI   Proposed modifications on NGN multicast service models (clause 6 of Y.ngn-mcastsf)     Q2/13  
[ 538 ]  
 
2008-01-08 ETRI   Revision of Y.ngn-vpn (NGN-GSI/DOC - 267R1)     Q2/13  
[ 537 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 8.3. Reference Points in Y.mpm     Q4/13  
[ 536 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 8.2. Functional Architecture in Y.mpm     Q4/13  
[ 535 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 8.1. General Architecture in Y.mpm     Q4/13  
[ 534 ]  
 
2008-01-08 ETRI   Proposed text of Section 5. NGN release 2 services of 'Supplement NGN Release 2 Scope' document     Q1/13  
[ 533 ]  
 
2008-01-08 ETRI   Proposed text of Section 4. NGN release 2 environment overview of 'Supplement NGN Release 2 Scope' document     Q1/13  
[ 532 ]  
 
2008-01-08 ETRI   Proposed text of Section 2. References of 'Supplement NGN Release 2 Scope' document     Q1/13  
[ 531 ]  
 
2008-01-08 ETRI   Proposed text of Section 2. References of 'Supplement NGN Release 2 Scope' document     Q1/13  
[ 530 ]  
 
2008-01-08 ETRI   Proposed text of Bibliography of 'Supplement NGN Release 2 Scope' document     Q1/13  
[ 529 ]  
 
2008-01-08 ETRI   Restructured text of Draft 'Supplement NGN Release 2 Scope' document     Q1/13  
[ 528 ]  
 
2008-01-11 ETRI   Revised Text for Draft Recommendation Q.HCF (v0.8)     Q2/19, Q6/13  
[ 527 ]  
 
2008-01-11 ETRI   Revision of Section 8.4 in Q.MMF     Q2/19, Q6/13  
[ 526 ]  
 
2008-01-11 Samsung Electronics   Text on Transport Level Convergence for Draft Rec. FMC-IMS     Q5/19, Q6/13  
[ 525 ]  
 
2008-01-11 ZTE Corporation , Samsung Electronics Ltd.   Proposed restructuring of Q.FMC-IMS     Q5/19, Q6/13  
[ 524 ]  
 
2008-01-08 ETRI   Draft Recommendation Y.NGN-DSL: Roadmap for DSL based systems in Next Generation Networks     Q3/13  
[ 523 ]  
 
2008-01-08 ETRI   Proposed Revisions in Section 6 "Requirement" of Y.mpls-mob     Q2/13  
[ 522 ]  
 
2008-01-08 ETRI   Missing functional requirements and relationship of clause 8 with clause 7 of Y.ngn-mcastsf     Q2/13  
[ 521 ]  
 
2008-01-08 ETRI   Proposed modifications on appendices of Y.ngn-mcastsf     Q2/13  
[ 520 ]  
 
2008-01-08 ETRI   Proposal for adding policy enabling capability to open service environment     Q2/13  
[ 519 ]  
 
2008-01-08 China Mobile, ZTE Corporation, Huawei Technologies   New Question on Distributed IP Services Network(DISN)     FUTURES, QALL/13  
[ 518 ]  
 
2008-01-08 China Mobile, Huawei Technologies Co. Ltd   New Question: Multi-connection in the heterogeneous access transport network environment     QALL/13, FUTURES  
[ 517 ]  
 
2008-01-08 ZTE Corporation   Proposed new Question on Impact of Intelligent Terminals to NGN Architecture     Futures, QALL/13;  
[ 516 ]  
 
2008-01-08 ETRI   Non-NGN related high level requirements to support USN applications and services     Q2/13  
[ 515 ]  
 
2008-01-08 ETRI   Proposed modifications to section 6.2 in Y.enet     Q4/13  
[ 514 ]  
 
2008-01-08 Nortel Networks (Canada)   Moving away from the concept of Releases and Release Planning as we move into the 2009 - 2012 Study Period     PLENARY, QALL/13  
[ 513 ]  
 
2008-01-08 Nortel Networks (Canada)   Proposal to accept SG 13 TD 288 (PLEN) as the baseline text for the IPTV services requirements draft Recommendation     Q2/13  
[ 512 ]  
 
2008-01-08 Canada   Consideration of IPTV Deliverables     QALL/13  
[ 511 ]  
 
2008-01-08 Nortel Networks (Canada)   Proposal to accept FG IPTV-DOC-0181 as the baseline text for the IPTV Architecture draft Recommendation     Q3/13  
Results:260 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-12-3