International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2004-04-19 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2004-04-19) 

ITU-T SG15

Optical and other transport networks

Study Period 2001

Meeting  from 2004-04-19 to 2004-04-30

held in Switzerland [Geneva]

Other Meetings : [ 2004-04-19 ]  2003-10-21  2003-01-20  2002-04-29  2001-10-15  2001-02-05 

Results:275 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Delayed Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 1257 ]  
 
2004-04-19 SBC , BellSouth   Proposed G.nm Requirements     Q4/15  
[ 1256 ]  
 
2004-04-14 N/A   WITHDRAWN     Q16/15  
[ 1255 ]  
 
2004-04-13 LM Ericsson   VDSL2: Proposed TPS-TC for Ethernet transport in VDSL2     Q4/15  
[ 1254 ]  
 
2004-04-13 Vitesse Semiconductor   A Proposed Enhanced FEC for G.975.x     Q18/15  
[ 1253 ]  
 
2004-04-13 BT   G.hs, G.ADSL - Comparison of tone sets A43C and V43P for ADSL2+     Q4/15  
[ 1252 ]  
 
2004-04-13 BT   Functional Architecture of Access Networks And Technologies - Proposal for a New Recommendation G.ATD     Q12/15, Q4/15, Q2/15  
[ 1251 ]  
 
2004-04-13 BT   G.TEST G.ADSL Improved Impulse Noise Modelling for xDSL Modem Testing     Q4/15  
[ 1250 ]  
 
2004-04-13 ZTE Corporation   Suggestion about supplying squelching method by using trail trace identifier in ITU-TG.808.2 and G.873.2     Q9/15  
[ 1249 ]  
 
2004-04-13 Editor Rec. G.8021/Y.1341   Draft new Recommendation G.8021/Y.1341 (ex-G.eequ) - Characteristics of Ethernet Transport Network Equipment Functional Blocks (for consent)     Q9/15  
[ 1248 ]  
 
2004-04-13 Editor Rec. G.8011   Draft new Recommendation G.8011 (G.ethsrv) - Ethernet over Transport - Ethernet Services Framework (for consent)     Q12/15  
[ 1247 ]  
 
2004-04-08 ZTE Corporation   Proposal on implementation of shared protection ring protection switching protocol based on IP signal method     Q9/15  
[ 1246 ]  
 
2004-04-08 ZTE Corporation   Proposal on adding channel shared protection ring in OTN     Q9/15  
[ 1245 ]  
 
2004-04-08 ZTE Corporation   ASON Functional Requirements for Restoration for Virtual Connection     Q12/15, Q14/15  
[ 1244 ]  
 
2004-04-08 China Unicom , ATE Corporation   A Proposal to Draft Requirement for Optical Multicast     Q12/15  
[ 1243 ]  
 
2004-04-08 ZTE Corporation   A Proposal regarding Explicit Route Objects in Call/Connection Requests     Q12/15, Q14/15  
[ 1242 ]  
 
2004-04-08 ZTE Corporation   An Proposal on Relationship between Client Layer Connection and Server Layer Connection     Q14/15  
[ 1241 ]  
 
2004-04-08 ZTE Corporation   A proposal on related link attributes and link state distribution mode of SNPP link status in SDH/SONET network     Q14/15  
[ 1240 ]  
 
2004-04-08 ZTE Corporation   A Proposal on DCM Maintenance Messages     Q14/15  
[ 1239 ]  
 
2004-04-08 ZTE Corporation   A Proposal on DCM Maintenance Messages (related to G.7713.x-series)     Q14/15  
[ 1238 ]  
 
2004-04-08 ZTE Corporation   Proposal for ADSL CO In-band Management Standard     Q4/15  
[ 1237 ]  
 
2004-04-08 ZTE Corporation   Suggestion about dividing the section 14 of G.808.1 into two parts     Q9/15  
[ 1236 ]  
 
2004-04-08 ZTE Corporation   Suggestion about applying group protection concept to ITU-T G.808.2     Q9/15  
[ 1235 ]  
 
2004-04-08 ZTE Corporation   Storage Strategy of Connections, and Connection Management     Q14/15  
[ 1234 ]  
 
2004-04-08 ZTE Corporation   A proposal on the revision of tunable dispersion compensator part in G.671     Q17/15  
[ 1233 ]  
 
2004-04-08 ZTE Corporation   Contribution on tunable dispersion compensator     Q17/15  
[ 1232 ]  
 
2004-04-08 ZTE Corporation MII   A proposal and specification of adding a 2.5Gbps transmission rate and Optical Preamplifier (OPA) in the black link module for G.dapp     Q16/15  
[ 1231 ]  
 
2004-04-08 China   Comments on management of PC by MP in G.7718/Y.1709 (ex-G.fame)     Q14/15  
[ 1230 ]  
 
2004-04-08 ZTE Corporation   New Management Functional Model     Q12/15, Q14/15  
[ 1229 ]  
 
2004-04-08 ZTE Corporation   A method to detect effective LCAS control packet     Q12/15, Q11715  
[ 1228 ]  
 
2004-04-08 ZTE Corporation , China Unicom   Proposal on Drafting a Frame of Optical Multicast     Q12/15  
[ 1227 ]  
 
2004-04-08 ZTE Corporation   Proposal of Transported Signal's Spectrum Frame in WDM Systems     Q16/15  
[ 1226 ]  
 
2004-04-08 ZTE Corporation   Protection of MPLS LSPs     Q12/15  
[ 1225 ]  
 
2004-04-08 ZTE Corporation   IP Packet 1+1 Protection in SCN     Q14/15  
[ 1224 ]  
 
2004-04-08 ZTE Corporation   On Management and Control Plane interactions between ASON and Ethernet     Q12/15  
[ 1223 ]  
 
2004-04-08 Italy   Text revision for Recommendation G.695     Q16/15  
[ 1222 ]  
 
2004-04-08 WorldCom   Need for Ethernet Transport Over E3/NxE3 Facilities, and Inclusion in Rec. G.8040     Q11/15  
[ 1221 ]  
 
2004-04-08 ZTE Corporation   Considerations about the definition of SMSR of transmitter signal in G.959.1     Q16/15  
[ 1220 ]  
 
2004-04-08 KDDI   Proposal for investigating interconnection between pre-OTN with GMPLS control plane and OTN with ASON control plane     Q11/15  
[ 1219 ]  
 
2004-04-07 Catena Networks   VDSL2: Rule based L2 mode for VDSL2     Q4/15  
[ 1218 ]  
 
2004-04-07 Spirent Communications   ADSL & G.996.1: Proposed G.992.5 Annex G Test Loops     Q4/15  
[ 1217 ]  
 
2004-04-07 Canada   Support for G.8011 consent     Q12/15  
[ 1216 ]  
 
2004-04-07 Canada   RPR Payload for G.7041     Q11/15  
[ 1215 ]  
 
2004-04-07 Canada   Rin Signal for the Acoustic Echo Control Test in G.160     Q6/15  
[ 1214 ]  
 
2004-04-07 Nortel (Canada)   Topics in ASON Addressing, Naming, and Routing     Q12/15  
[ 1213 ]  
 
2004-04-07 Nortel (Canada)   G.8080 Text Changes in Support of Layer 1 VPN     Q12/15  
[ 1212 ]  
 
2004-04-07 Nortel (Canada)   Some Requirements for a Mechanism to Coordinate SPNE in a Communication Link to Improve Voice Quality     Q8/15  
[ 1211 ]  
 
2004-04-07 Nortel (Canada)   Impact of Layer 1 VPN on G.8080     Q12/15  
[ 1210 ]  
 
2004-04-07 Nortel (Canada)   Service Capability Exchange for the ASON Provisioning and Validation Process     Q14/15  
[ 1209 ]  
 
2004-04-07 Nortel (Canada)   Provisioning and Validation Process in ASON     Q12/15, Q14/15  
[ 1208 ]  
 
2004-04-07 Nortel (Canada)   Enhancements to SNP and SNP link connection states in G.8080     Q14/15, Q12/15  
Results:275 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2004-04-13