Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG11 : Réunion 2003-09-01 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG11  TD-WP1 (2003-09-01) 

UIT-T SG11

Spécifications et protocoles de signalisation

Période d'études 2001

Réunion  du 2003-09-01 au 2003-09-12

Lieu : Suisse [Genève]

Autres réunions : 2004-03-01  [ 2003-09-01 ]  2002-11-11  2002-02-18  2001-07-02  2001-05-14  2001-03-21  2000-11-27 

Resultats:12 documents
Documents Temporaires  (WP1)   Documents / Contributions
 
Numéro 
Date Source Titre Questions
[ 12-WP1 ]  
 
2003-09-10 Editor (A. Narita)   Draft TRQ.NCAP1 High level Functional Requirements for Packet-based Network Control Architecture (editing output)     Q1/11  
[ 11-WP1 ]  
 
2003-09-08 Editor (B. Chatras)   Baseline text for a Recommendation on SIP-based Service Triggering and Service Interactions     Q1/11  
[ 10-WP1 ]  
 
2003-09-08 Editor (B. Chatras)   Baseline text for a Technical Report on NGN Service Control Architectures     Q1/11  
[ 9-WP1 ]  
 
2003-09-04 Rapporteur (J. Dobrowolski)   Q.1/11 and Q.2/11 meeting agenda, document allocation and schedule     Q1/11, Q2/11  
[ 8-WP1 ]  
 
2003-09-04 Editor (K. Matsumoto)   Draft of guideline document for API specification     Q4/11  
[ 7-WP1 ]  
 
2003-09-02 Rapporteur (K. Matsumoto)   Proposed Agenda for Q.4/11     Q4/11  
[ 6-WP1 ]  
 
2003-08-29 WP1/11 Vice-chairmen   SG 11 WP1/11 Work Programme (Input)     Q1/11, Q2/11, Q3/11, Q4/11, Q5/11  
[ 5-WP1 ]  
 
2003-08-25 Editor (A. Narita)   Draft Technical Report Q.ncap1 - High Level Functional Requirements for Packet-based Network Control Architecture - Output of the Paris Rapporteurs Meeting     Q1/11  
[ 4-WP1 ]  
 
2003-01-21 SG17 (GVA. 20-29 November 2002)   Liasion Statement - Request for comments on baseline document on Security Architecture for Systems Providing End-to-End Communications     Q1/11, Q10/17  
[ 3-WP1 ]  
 
2003-01-21 SG17 (GVA 20-29 November 2002)   Liaison Statement - Information Security Management System for Telecommunication Use     Q1/11, Q10/17  
[ 2-WP1 ]  
(Rev.1) 
2003-09-01 TSB   List of WP1/11 Series Temporary Documents  
Rev. 1 - updated list 05.09.03
 
QALL/11  
[ 1-WP1 ]  
 
2003-08-29 WP 1/11 Vice Chairmen   Agenda - WP1/11 Plenary Sessions     Q1/11, Q2/11, Q3/11, Q4/11, Q5/11  
Resultats:12 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

 

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2013-5-24