International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG06 : Reports  Recently posted -  Search Meeting Documents
   
ITU-T SG06  R 

ITU-T SG06

Outside plant

Study Period 2001

Results:7 total items.
Reports  Documents / Contributions
 
Number 
Received Source Title Questions
[ 7 ]  
 
2004-07-05 SG 6 Chairman   Report of the sixth meeting of Study Group 6 - Outside Plant (Geneva, 14-18 June 2004)     QALL/6  
[ 6 ]  
 
2004-02-04 SG 6 Chairman   Report of the fifth meeting of Study Group 6 - Outside Plant (Hanoi, 25-28 November 2003)     QALL/6  
[ 5 ]  
 
2003-04-22 SG 6 Chairman   Report of the fourth meeting of Study Group 6 - Outside Plant (Geneva, 7-11 April 2003) - Part II.B: Draft new Recommendation L.55 - Digital database for underwater cables     QALL/6  
[ 4 ]  
 
2003-05-15 SG 6 Chairman   Report of the fourth meeting of Study Group 6 - Outside Plant (Geneva, 7-11 April 2003)     QALL/6  
[ 3 ]  
 
2002-11-20 Chairman SG 6   Report of the third meeting of Study Group 6 - Outside Plant - Kessel-lo, 23-27 September 2002     QALL/6  
[ 2 ]  
 
2002-02-18 TSB   Report of the second meeting of Study Group 6 - Outside Plant (Geneva, 10-14 December 2001)     QALL/6  
[ 1 ]  
 
2001-04-19 TSB   Report of the first meeting of Study Group 6 - Outside Plant (Geneva, 6 -9 March 2001)     QALL/6  
Results:7 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2003-07-18