International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP6C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-WP6C  C 

ITU-R R23-WP6C

Programme production and quality assessment

Results:44 total items.
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 44 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV     2024-04-22
[ 43 ]  
 
Liaison statement on definition of CitiVerse     ITU-T FG-MV     2024-04-18
[ 42 ]  
 
Liaison statement on vocabulary for metaverse     IRG-AVA     2024-04-17
[ 41 ]  
 
Liaison statement on results of the fifth meeting of the FG-MV     ITU-T FG-MV     2024-04-02
[ 40 ]  
 
Liaison statement on Vocabulary for metaverse     ITU-T FG-MV     2024-03-27
[ 39 ]  
 
Reply liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 6A and 6C)     WP 6B     2024-03-25
[ 38 ]  
 
Liaison statement to Working Party 6C - Updated work plan for advanced sound systems     WP 6B     2024-03-21
[ 37 ]  
+Ch.3Ann.3.02 
Report of the meeting of Working Party 6C (Geneva, 4-8 March 2024)     Acting Chair, WP 6C     2024-03-07
[ 36 ]  
 
Final list of participants - Working Party 6C (Geneva, 4-8 March 2024)     Director, BR     2024-03-07
[ 35 ]  
 
Liaison statement on invitation to provide inputs to the "Glossary of terms and definitions for machine learning"     JCA-ML     2024-03-04
[ 34 ]  
 
Liaison statement on invitation to provide inputs to the machine learning standardization roadmap     JCA-ML     2024-03-04
[ 33 ]  
(Rev.1) 
List of documents issued (Documents 6C/1 - 6C/35)     BR, Study Groups Department     2024-03-04
[ 32 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 6 and ITU-R Working Parties 6A, 6B and 6C - Strategies, policies, regulations and methods of migration to and adoption of digital technologies for broadcasting, including to provide new services for various environments     ITU-D SG1     2024-03-01
[ 31 ]  
(Rev.3) 
Proposed organization of the work of the Study Group 6     Chair, SG 6     2024-03-01
[ 30 ]  
 
Intersector Rapporteur Group Audiovisual Quality Assessment meeting Report (online)     Co-Chairs, IRG-AVQA     2024-02-28
[ 29 ]  
 
Progress Report of Rapporteur Group on the Audio     Co-Chairs, RG-Audio     2024-02-27
[ 28 ]  
 
Progress Report on High Dynamic Range Televisions     RG on HDR-TV (RG-24)   Q142/6   2024-02-23
[ 27 ]  
 
Rapporteur Group - Future of Broadcasting Progress Report (October 2023 - February 2024)     RG-FOB     2024-02-23
[ 26 ]  
 
Proposed changes to Report ITU-R BT.2408-7 in sections 5 and 7     United States of America     2024-02-21
[ 25 ]  
 
Proposed revisions of Recommendation ITU-R BT.[MON] - [Reference] viewing conditions for HDR and SDR monitoring in close proximity within a single-master broadcast production environment     North American Broadcasters Association (NABA)     2024-02-21
[ 24 ]  
 
Comments on working document towards a preliminary draft new Recommendation ITU-R BT.[MON]     Philips International B.V.   Q142-3/6   2024-02-21
[ 23 ]  
 
A subjective analysis of the discomfort duration in brightness transitions in high dynamic range media     British Broadcasting Corporation (BBC)     2024-02-21
[ 22 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R BT.[REQ-MIL][REQ-IL] - Requirements and applications for Image Level meters     British Broadcasting Corporation (BBC)   Q142-3/6   2024-02-21
[ 21 ]  
 
HDR Vivid practice in China (Information document)     China (People's Republic of)     2024-02-21
[ 20 ]  
 
Working document towards a preliminary draft revision of Report ITU-R BS.2493-0 - Application of the Audio Vivid format     China (People's Republic of)     2024-02-21
[ 19 ]  
 
Proposal for a new ITU-R Report - Usage scenarios and key technologies of 5G-based UHD/HD contribution and production     China (People's Republic of)     2024-02-21
[ 18 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R BT.[MF3] - A measurement framework for broadcasters to assess their Scope 3 impact of televisions displaying a television programme     InterDigital Communications Inc.     2024-02-19
[ 17 ]  
 
RG-EAB Progress Report - August 2023 to March 2024     RG-EAB     2024-02-19
[ 16 ]  
 
Proposed continuation of the Rapporteur Group - Energy Aware Broadcasting (RG-EAB)     RG-EAB   Q147/6   2024-02-19
[ 15 ]  
 
Draft liaison to greening of streaming, dimpact, ultra-HD forum sustainability Working Group - New Report on Energy Aware Broadcasting     RG-EAB   Q147/6   2024-02-19
[ 14 ]  
 
Draft liaison statement to ISO TC-100, ATSC PT9, DVB CM-EE, MPEG WG 3 - Progress of Working Party 6C on Energy Aware Broadcasting     RG-EAB   Q147/6   2024-02-19
[ 13 ]  
 
Proposed draft new Report ITU-R BT.[ERTIP] - Display energy reduction through image signal processing     RG-EAB   Q147/6   2024-02-19
[ 12 ]  
 
[Working document towards a] preliminary draft new Recommendation ITU-R BT.[CARE] - A framework for content-adaptive methods for reduction of energy consumption in television displays     RG-EAB   Q147/6   2024-02-19
[ 11 ]  
 
AI-based no-reference (NR) video quality measurement methods     Korea (Republic of)   Q44-4/6   2024-02-19
[ 10 ]  
 
Brazilian next-generation Digital Terrestrial Television (Information document)     Brazil (Federative Republic of)     2024-02-16
[ 9 ]  
 
Proposed draft revision of Report ITU-R BT.2420-5 - Collection of usage scenarios of advanced immersive sensory media systems     Japan   Q143-2/6   2024-02-16
[ 8 ]  
 
Proposed draft revision of Report ITU-R BT.2506-0 - Requirements for spatial characteristics of an ideal head-mounted display for immersive video     Japan   Q143-2/6   2024-02-16
[ 7 ]  
 
Response liaison statement on providing comment and suggestions on the progress made on the draft new ITU-T Technical Report JSTR.LCAP - Technical advances, challenges, and best practices in live captioning     IRG-AVA     2024-02-09
[ 6 ]  
 
Proposed changes to Report ITU-R BT.2408-7 in sections 5 and 7     North American Broadcasters Association (NABA)     2024-02-06
[ 5 ]  
 
Liaison statement on progress made on the draft new ITU-T Technical Report JSTR.LCAP "Technical advances, challenges and best practices in live captioning", draft new Recommendation ITU-T J.acc-us-prof "Requirements for the specific semantics of a Common User Profile used to personalize audiovisual media", and the new ITU-T Technical Report TR.CUP "Concept of a common User...     ITU-T SG9     2023-12-21
[ 4 ]  
 
Liaison statement on practical examples of actions to realize energy aware broadcasting     ITU-T SG5     2023-12-21
[ 3 ]  
 
Liaison statement on results of the fourth meeting of the FG-MV     ITU FG-MV     2023-12-19
[ 2 ]  
 
Liaison statement on the approval of the Technical Specification ITU FGMV-19 on service scenarios and high-level requirements for metaverse cross-platform Interoperability     ITU FG-MV     2023-12-19
[ 1 ]  
 
Documents to be carried over from the 2019-2023 Study Period     WP 6C     2023-12-06
Results:44 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-04-22