International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R R23-SG05  C 

ITU-R R23-SG05

Terrestrial Services

Results:19 total items.
Contributions  Documents / Contributions
 
Number 
Title Source Date
[ 19 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chair, CCV   2024-04-22
[ 18 ]  
 
Liaison statement on definition of CitiVerse     ITU-T FG-MV   2024-04-18
[ 17 ]  
 
Liaison statement on initiation of the draft new technical Report ITU-T TR.URCN-REQ - Service requirements of ubiquitous real time communication network for future networks     ITU-T SG13   2024-04-09
[ 16 ]  
 
Liaison statement on results of the fifth meeting of the FG-MV     ITU-T FG-MV   2024-04-02
[ 15 ]  
 
Liaison statement on Vocabulary for metaverse     ITU-T FG-MV   2024-03-27
[ 14 ]  
 
Liaison statement out to key SDOs on the publication of GR THz 001 and GR THz 002     ETSI   2024-03-27
[ 13 ]  
 
Draft new Report ITU-R M.[IMT.ABOVE 100 GHz] - Technical feasibility of IMT in bands above 100 GHz     WP 5D   2024-02-14
[ 12 ]  
 
Text from WRC-23 Plenary for the attention of the ITU-R Working Parties that are either responsible for or contributing to studies relevant to items of the WRC-27 agenda or the WRC-31 preliminary agenda     Director, BR   2024-01-30
[ 11 ]  
(Rev.1) 
List of proposed Vice-Chairs of the Radiocommunication Study Groups and the CCV     Director, BR   2024-01-26
[ 10 ]  
 
Studies under Resolution 731 (WRC-23) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz     Chairs, SGs 1, 5 & 7   2024-01-22
[ 9 ]  
 
Liaison statement on the activities and studies on sustainable digital transformation     ITU-T SG5   2023-12-22
[ 8 ]  
 
Liaison statement on the new version of the home network transport (HNT) standards overview and work plan     ITU-T SG15   2023-12-21
[ 7 ]  
 
Liaison statement on the new version of the access network transport (ANT) standards overview and work plan     ITU-T SG15   2023-12-21
[ 6 ]  
 
Liaison statement on results of the fourth meeting of the FG-MV     ITU FG-MV   2023-12-19
[ 5 ]  
 
Liaison statement on the approval of the Technical Specification ITU FGMV-19 on service scenarios and high-level requirements for metaverse cross-platform Interoperability     ITU FG-MV   2023-12-19
[ 4 ]  
 
Liaison statement on initiation of draft new Recommendation ITU-T Y.U2USM-req-fra - Future networks including IMT-2020: Requirements and framework for the support of UE-to-UE session management     ITU-T SG13   2023-12-08
[ 3 ]  
 
Liasion statement on initiation of a new Technical Report ITU-T TR.ISAC-fra - Considerations of integrated sensing and communication in IMT-2020 networks and beyond     ITU-T SG13   2023-12-08
[ 2 ]  
 
Documents to be carried over from the 2019-2023 Study Period     SG 5   2023-11-22
[ 1 ]  
 
Assignment of texts to the Study Group 5 Sub-Groups     Chair, SG 5   2023-11-22
Results:19 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-04-22