International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG07 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG07  C 

ITU-R SG07

Science Services

Results:105 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 105 ]  
 
Summary Report of actions taken during the meetings of Radiocommunication Study Group 7 (Geneva, 12 October 2023)     Chair, SG 7     2023-10-13
[ 104 ]  
 
Final list of participants SG 7 (Geneva, 12 October 2023)     Director BR     2023-10-13
[ 103 ]  
 
List of documents issued (Documents 7/70 - 7/103)     BR, Study Groups Department     2023-10-13
[ 102 ]  
(Rev.2) 
Executive Report on the September-October 2022 and October 2023 meetings of Working Party 7B (27 September - 5 October 2022 and 3-10 October 2023)     Chairman, WP 7B     2023-10-11
[ 101 ]  
 
Executive Report on the October 2023 meeting of Working Party 7D (5-11 October 2023)     Chairman, WP 7D     2023-10-11
[ 100 ]  
 
Executive Report on the October 2023 meeting of Woking Party 7C (4-11 October 2023)     Chairman, WP 7C     2023-10-11
[ 99 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R RS.2042-1 - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz band     WP 7C     2023-10-11
[ 98 ]  
 
Draft new Report ITU-R RS.[SPACEBORNE VHF RADAR SOUNDER] - Sharing and compatibility studies related to spaceborne radar sounders in the 40-50 MHz frequency band     WP 7C     2023-10-11
[ 97 ]  
 
Draft revision of Recommendation ITU-R RA.314-10 - Preferred frequency bands for radio astronomical measurements     WP 7D     2023-10-11
[ 96 ]  
 
Resolution ITU-R 55 - ITU-R studies of disaster prediction, detection, mitigation and relief     WP 7C     2023-10-11
[ 95 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R RS.1166-4 - Performance and interference criteria for active spaceborne sensors     WP 7C     2023-10-11
[ 94 ]  
(Rev.1) 
Draft revised Recommendation ITU-R RS.2105-1 - Typical technical and operational characteristics of Earth exploration-satellite service (active) systems using allocations between 432 MHz and 238 GHz     WP 7C     2023-10-11
[ 93 ]  
 
Draft revision of Recommendation ITU-R RS.2066-0 - Protection of the radio astronomy service in the frequency band 10.6-10.7 GHz from unwanted emissions of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9 600 MHz     WP 7C     2023-10-11
[ 92 ]  
 
Editorial revision of Recommendation ITU-R RS.1861-1 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz     WP 7C     2023-10-11
[ 91 ]  
 
Draft new Report ITU-R RS.[231.5-252 GHZ EESS] - Studies related to possible EESS (passive) allocations in the frequency range 231.5-252 GHz     WP 7C     2023-10-11
[ 90 ]  
(Rev.1) 
Draft revision of Question ITU-R 256/7 - Space weather observations     WP 7C     2023-10-11
[ 89 ]  
 
Draft revision of Report ITU-R RS.2456-0 - Space weather sensor systems using radio spectrum     WP 7C     2023-10-11
[ 88 ]  
 
Editorial updates in Recommendation ITU-R SA.1016     WP 7B     2023-10-10
[ 87 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SA.2079-0 - Frequency sharing between SRS and FSS (space-to-Earth) systems in the 37.5-38 GHz band     WP 7B     2023-10-09
[ 86 ]  
 
Draft revision of Report ITU-R SA.2307-0 - Protection of SRS and FSS systems sharing the 37.5-38 GHz band     WP 7B     2023-10-09
[ 85 ]  
 
Draft revision of Recommendation ITU-R SA.1014-3 - Radiocommunication requirements for manned and unmanned deep space research     WP 7B     2023-10-09
[ 84 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R RS.1813-1 - Reference antenna pattern for passive sensors operating in the Earth exploration-satellite service (passive) to be used in compatibility analyses in the frequency range 1.4-450 GHz     WP 7C     2023-10-09
[ 83 ]  
(Rev.1) 
Draft new Recommendation ITU-R RS.[EESS_SAR-RNSS] - Evaluation of the potential for pulsed interference from planned and future spaceborne synthetic aperture radar sensors in the earth exploration-satellite (active) service to radionavigation-satellite service receivers in the 1 215-1 300 MHz band     WP 7C     2023-10-09
[ 82 ]  
 
Draft revision of Recommendation ITU-R RS.1263-2 - Interference criteria for meteorological aids operated in the 400.15-406 MHz and 1 668.4-1 700 MHz bands     WP 7C     2023-10-09
[ 81 ]  
(Rev.1) 
Draft new Report ITU R RS.[EESS_SAR-RNSS] - Representative system characteristics and examples of evaluating interference into receiving earth stations in the radionavigation-satellite service (space-to-Earth) from spaceborne synthetic aperture radar sensors in the Earth exploration-satellite (active) service in the 1 215-1 300 MHz band     WP 7C     2023-10-09
[ 80 ]  
 
Note to Study Group 7     WP 7A     2023-07-05
[ 79 ]  
(Rev.1) 
Draft revised Question ITU-R 236-2/7 - The future of the UTC time scale     WP 7A     2023-07-04
[ 78 ]  
 
Reply liaison statement to CCT (copy to Study Group 7) - Revising Recommendation ITU-R V.431-8     WP 7A     2023-07-04
[ 77 ]  
 
Liaison statement from ITU-D Study Group 2 Question 6/2 to ITU-T Study Groups 5 and 20, and ITU-R Study Groups 1, 4, 6 and 7 on new Question 6/2 and collaboration     ITU-D SG2     2022-12-21
[ 76 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol THF     WP 5C     2022-11-30
[ 75 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5C, 5D, 6A, 7C and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     WP 5A     2022-11-28
[ 74 ]  
 
Revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Terametric waves     ATDI   Q228/3   2022-11-21
[ 73 ]  
 
Executive Report on September-October 2022 and June 2023 meetings of Working Party 7A     WP 7A     2023-09-14
[ 72 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 6 and 7, as well as Working Parties 1B, 5A, 5C, 6A and 7D) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     WP 5D     2022-10-28
[ 71 ]  
 
Liaison statement on invitation to provide inputs to the roadmap of AI and IoT activities for digital agriculture     ITU-T (FG-AI4A)     2022-10-25
[ 70 ]  
 
Summary Report of actions taken during the meetings of Radiocommunication Study Group 7 (Geneva, 7 October 2022)     Chairman, SG 7     2022-10-07
[ 69 ]  
 
Final list of participants Study Group 7 (Geneva, 7 October 2022)     Director, BR     2022-10-07
[ 68 ]  
 
List of documents issued (Documents 7/42 - 7/68)     BR, Study Groups Department     2022-10-07
[ 67 ]  
 
Draft new Report ITU-R TF.[UTC] - Content and structure of time signals to be disseminated by radiocommunication systems and various aspects of current and potential future reference time scales, including their impacts and applications in radiocommunication     WP 7A     2022-10-06
[ 66 ]  
 
Note to Study Group 7 regarding draft editorial corrections of Recommendations ITU-R TF.583-6 and ITU-R TF.768-7     WP 7A     2022-10-06
[ 65 ]  
 
Reply liaison statement to Coordination Committee for Terminology (CCT) (copy to Study Groups 1, 3, 4, 5 and 6) - Symbols in Recommendation ITU-R V.431-8 inconsistent with the definitions of the SI units and adding a new symbol to the Radio Regulations     Chairman, SG 7     2022-10-06
[ 64 ]  
 
Draft new Report ITU-R RA.[CMB] - Technical and operational characteristics of broadband, background-limited detectors operating in the millimetre-wave regime     WP 7D     2022-10-05
[ 63 ]  
 
Draft new Recommendation ITU-R SA.[S-BAND UL USE OPT] - Guidelines on the use of the 2 025-2 110 MHz frequency band by EESS/SRS/SOS satellite networks or systems without spread- spectrum modulation     Chairman, SG 7     2022-10-05
[ 62 ]  
 
Draft new Recommendation ITU-R SA.[S-BAND DL USE OPT] - Guidelines on the use of the 2 200-2 290 MHz frequency band by EESS/SRS/SOS satellite networks or systems without spread- spectrum modulation     Chairman, SG 7     2022-10-05
[ 61 ]  
(Rev.1) 
Draft new Recommendation ITU-R SA.[S-BAND UL USE OPT] - Guidelines on the use of the 2 025-2 110 MHz frequency band by EESS/SRS/SOS satellite networks or systems without spread- spectrum modulation     WP 7B     2022-10-03
[ 60 ]  
 
Executive Report on the September 2021 and April 2022 meetings of Working Party 7B (8-15 September 2021 and 26 April - 4 May 2022)     WP 7B     2022-10-03
[ 59 ]  
 
Executive Report on the April 2022 meeting of Working Party 7D (25-29 April 2022)     WP 7D     2022-10-03
[ 58 ]  
 
Draft new Report on technical and operational characteristics of Geodetic VLBI     WP 7D   Q258/7   2022-09-30
[ 57 ]  
 
Draft new Report ITU-R RA.[67-116GHZ] - Technical and operational characteristics of radio astronomy systems at 67-116 GHz (3-4 mm)     WP 7D   Q226/7   2022-09-30
[ 56 ]  
 
Draft new Report ITU-R RA.[350MHZ] - Technical and operational characteristics of radio astronomy systems operating below 350 MHz (85 cm)     WP 7D   Q237/7, Q145/7, Q129-7   2022-09-30
Results:105 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-01-15