|
Format |
Size |
Posted |
|
|
|
English |
Word
|
63396 bytes |
2016-11-03 |
[196] Annex 38
- List of Liaison Statements to ITU-R Groups |
|
Word
|
61561 bytes |
2016-11-03 |
[196] Annex 37
- Liaison statement to ITU-D Study Group 1, Question 2/1 (copy to Coordination Committee for Vocabulary (CCV), Working Parties 4B, 4C, 5A, 5B, 5C, 5D and 6A) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband? |
|
Word
|
64748 bytes |
2016-10-20 |
[196] Annex 36
- Work plan for WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
|
68912 bytes |
2016-10-19 |
[196] Annex 35
- Working document towards preliminary draft CPM Text for WRC-19 agenda item 9.1, issue 9.1.3 |
|
Word
|
72847 bytes |
2016-10-19 |
[196] Annex 34
- Work plan for WRC-19 agenda item 9.1, issue 9.1.3 |
|
Word
|
80961 bytes |
2016-10-19 |
[196] Annex 33
- Working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2 |
|
Word
|
72833 bytes |
2016-10-19 |
[196] Annex 32
- Work plan for WRC-19 agenda item 9.1, issue 9.1.2 |
|
Word
|
66543 bytes |
2016-10-19 |
[196] Annex 31
- Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A and 9.13 or 9.21 |
|
Word
|
63708 bytes |
2016-10-19 |
[196] Annex 30
- Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Discrepancy and / or inconsistency between the regulatory provisions dealing with any changes to the characteristics of an assignment |
|
Word
|
62292 bytes |
2016-10-18 |
[196] Annex 29
- Work plan for WRC-19 agenda item 7 |
|
Word
|
64149 bytes |
2016-10-19 |
[196] Annex 28
- Work plan for WRC-19 agenda item 1.6 |
|
Word
|
69761 bytes |
2016-10-18 |
[196] Annex 27
- Work plan for WRC-19 agenda item 1.5 |
|
Word
|
62912 bytes |
2016-10-18 |
[196] Annex 26
- Work plan for WRC-19 agenda item 1.4 |
|
Word
|
75129 bytes |
2016-10-18 |
[196] Annex 25
- Working document - Updating the reference situation for networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments - WRC-19 agenda item 7 - Issue G |
|
Word
|
84699 bytes |
2016-10-18 |
[196] Annex 24
- Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe
the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F |
|
Word
|
68751 bytes |
2016-10-18 |
[196] Annex 23
- Working document - Harmonization of RR Appendix 30B with RR Appendices 30 and 30A - WRC-19 agenda item 7 - Issue E |
|
Word
|
178795 bytes |
2016-10-18 |
[196] Annex 22
- Working document - Application of coordination arc in the Ka-band, to determine coordination requirements between the FSS and other satellite services |
|
Word
|
5224102 bytes |
2016-10-18 |
[196] Annex 21
- Working document - Considerations on the content and application of Recommendation ITU-R S.1503-2 |
|
Word
|
133611 bytes |
2016-10-18 |
[196] Annex 20
- Working document on WRC-19 agenda item 1.5 - ITU SRS database analysis of [stationary] FSS earth station characteristics in 17.7-19.7 GHz |
|
Word
|
196840 bytes |
2016-10-18 |
[196] Annex 19
- Working document on WRC-19 agenda item 1.5 - ITU SRS database analysis of [stationary] FSS earth station e.i.r.p. spectral density envelope in 27.5-29.5 GHz |
|
Word
|
2512812 bytes |
2016-10-14 |
[196] Annex 18
- Working document on WRC-19 agenda item 1.5 - Working document [towards a preliminary draft new Recommendation/Report] on a methodology to estimate the interference from land-based earth stations in motion (ESIMs) communicating with geostationary space stations in the fixed satellite service into fixed service stations operating in the 27.5-29.5 GHz frequency band |
|
Word
|
561835 bytes |
2016-10-14 |
[196] Annex 17
- Working document on WRC-19 Agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed service in the 27.5-29.5 GHz frequency band |
|
Word
|
469033 bytes |
2016-10-14 |
[196] Annex 16
- Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz |
|
Word
|
574882 bytes |
2016-10-14 |
[196] Annex 15
- Working document towards a preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHZ] - Uplink interference issues associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band |
|
Word
|
91502 bytes |
2016-10-14 |
[196] Annex 14
- Working document towards a preliminary draft new Report ITU-R S.[NON-AXIAL_SYM_ANT] - Maximum permissible levels of off-axis e.i.r.p. density from non-axially symmetric earth station antennas transmitting to geostationary-satellite orbit networks operating in the fixed-satellite service in the 27.5-30 GHz frequency band |
|
Word
|
396868 bytes |
2016-10-14 |
[196] Annex 13
- Working document [towards a preliminary draft new Report] on sharing with Incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
|
999685 bytes |
2016-10-14 |
[196] Annex 12
- Working document [towards a prelimInary draft new Report] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9 |
|
Word
|
134899 bytes |
2016-10-14 |
[196] Annex 11
- Working document [Towards a preliminary draft new Recommendation/Report] ITU-R S.[NGSO_6/4-GHZ] on technical and regulatory studies for 6/4 GHz GSO/NON-GSO FSS sharing |
|
Word
|
1054676 bytes |
2016-10-14 |
[196] Annex 10
- Working document towards a preliminary draft new Report ITU-R S.[NGSO FSS 6/4 GHZ SHARING] |
|
Word
|
2449697 bytes |
2016-10-14 |
[196] Annex 09
- Working document [towards a preliminary draft new Report/Recommendation] on sharing between 50/40 GHz GSO and non-GSO systems - WRC-19 agenda item 1.6 |
|
Word
|
825364 bytes |
2016-10-14 |
[196] Annex 08
- Working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2 50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6 |
|
Word
|
111368 bytes |
2016-10-13 |
[196] Annex 07
- Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems |
|
Word
|
127058 bytes |
2016-10-07 |
[196] Annex 06
- Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Studies on compatibility of International Mobile Telecommunications and broadcasting-satellite service (sound) in the frequency band 1 452-1 492 MHz in Regions 1 and 3 - WRC-19 agenda item 9.1, issue 9.1.2 |
|
Word
|
1954915 bytes |
2016-10-12 |
[196] Annex 05
- Working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions |
|
Word
|
1764284 bytes |
2016-10-12 |
[196] Annex 04
- Working document towards a preliminary draft revision of Recommendation ITU-R S.1323-2 - Maximum permissible levels of interference in a satellite network (GSO/FSS; non-GSO/FSS; non-GSO/MSS feeder links) in the fixed-satellite service caused by other co-directional FSS networks
operating in frequency bands below 52.4 GHz |
|
Word
|
69232 bytes |
2016-10-12 |
[196] Annex 03
- Working document towards a preliminary draft new [Recommendation/REPORT] ITU-R S.[GUIDELINES_14.5-14.8 GHz] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band14.5-14.8 GHz |
|
Word
|
139928 bytes |
2016-10-07 |
[196] Annex 02
- Working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERF.AREA] - A guiding methodology using Appendix 7 of the Radio Regulations to determine the area where ubiquitously deployed earth stations of the fixed-satellite service can be deployed [without triggering coordination with other countries] |
|
Word
|
199008 bytes |
2016-10-11 |
[196] Annex 01
- Preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UA] - Technical and operational characteristics of Unmanned Aircraft Control and Non-Payload satellite communication links operated in certain frequency bands allocated to the fixed-satellite service not subject to RR Appendices 30, 30A and 30B |
|
Word
|
154438 bytes |
2016-11-03 |
[196]
- Report on the meeting of Working Party 4A (Geneva, 28 September - 6 October 2016) |
|
|