International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions : 196 Recently posted -  Search Meeting Documents
   
[196]  Report on the meeting of Working Party 4A (Geneva, 28 September - 6 October 2016)

Format

Size

Posted

English

Word  

63396 bytes 2016-11-03 [196] Annex 38 - List of Liaison Statements to ITU-R Groups

Word  

61561 bytes 2016-11-03 [196] Annex 37 - Liaison statement to ITU-D Study Group 1, Question 2/1 (copy to Coordination Committee for Vocabulary (CCV), Working Parties 4B, 4C, 5A, 5B, 5C, 5D and 6A) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?

Word  

64748 bytes 2016-10-20 [196] Annex 36 - Work plan for WRC-19 agenda item 9.1, issue 9.1.9

Word  

68912 bytes 2016-10-19 [196] Annex 35 - Working document towards preliminary draft CPM Text for WRC-19 agenda item 9.1, issue 9.1.3

Word  

72847 bytes 2016-10-19 [196] Annex 34 - Work plan for WRC-19 agenda item 9.1, issue 9.1.3

Word  

80961 bytes 2016-10-19 [196] Annex 33 - Working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2

Word  

72833 bytes 2016-10-19 [196] Annex 32 - Work plan for WRC-19 agenda item 9.1, issue 9.1.2

Word  

66543 bytes 2016-10-19 [196] Annex 31 - Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12, 9.12A and 9.13 or 9.21

Word  

63708 bytes 2016-10-19 [196] Annex 30 - Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue C: Discrepancy and / or inconsistency between the regulatory provisions dealing with any changes to the characteristics of an assignment

Word  

62292 bytes 2016-10-18 [196] Annex 29 - Work plan for WRC-19 agenda item 7

Word  

64149 bytes 2016-10-19 [196] Annex 28 - Work plan for WRC-19 agenda item 1.6

Word  

69761 bytes 2016-10-18 [196] Annex 27 - Work plan for WRC-19 agenda item 1.5

Word  

62912 bytes 2016-10-18 [196] Annex 26 - Work plan for WRC-19 agenda item 1.4

Word  

75129 bytes 2016-10-18 [196] Annex 25 - Working document - Updating the reference situation for networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments - WRC-19 agenda item 7 - Issue G

Word  

84699 bytes 2016-10-18 [196] Annex 24 - Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F

Word  

68751 bytes 2016-10-18 [196] Annex 23 - Working document - Harmonization of RR Appendix 30B with RR Appendices 30 and 30A - WRC-19 agenda item 7 - Issue E

Word  

178795 bytes 2016-10-18 [196] Annex 22 - Working document - Application of coordination arc in the Ka-band, to determine coordination requirements between the FSS and other satellite services

Word  

5224102 bytes 2016-10-18 [196] Annex 21 - Working document - Considerations on the content and application of Recommendation ITU-R S.1503-2

Word  

133611 bytes 2016-10-18 [196] Annex 20 - Working document on WRC-19 agenda item 1.5 - ITU SRS database analysis of [stationary] FSS earth station characteristics in 17.7-19.7 GHz

Word  

196840 bytes 2016-10-18 [196] Annex 19 - Working document on WRC-19 agenda item 1.5 - ITU SRS database analysis of [stationary] FSS earth station e.i.r.p. spectral density envelope in 27.5-29.5 GHz

Word  

2512812 bytes 2016-10-14 [196] Annex 18 - Working document on WRC-19 agenda item 1.5 - Working document [towards a preliminary draft new Recommendation/Report] on a methodology to estimate the interference from land-based earth stations in motion (ESIMs) communicating with geostationary space stations in the fixed satellite service into fixed service stations operating in the 27.5-29.5 GHz frequency band

Word  

561835 bytes 2016-10-14 [196] Annex 17 - Working document on WRC-19 Agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed service in the 27.5-29.5 GHz frequency band

Word  

469033 bytes 2016-10-14 [196] Annex 16 - Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz

Word  

574882 bytes 2016-10-14 [196] Annex 15 - Working document towards a preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHZ] - Uplink interference issues associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band

Word  

91502 bytes 2016-10-14 [196] Annex 14 - Working document towards a preliminary draft new Report ITU-R S.[NON-AXIAL_SYM_ANT] - Maximum permissible levels of off-axis e.i.r.p. density from non-axially symmetric earth station antennas transmitting to geostationary-satellite orbit networks operating in the fixed-satellite service in the 27.5-30 GHz frequency band

Word  

396868 bytes 2016-10-14 [196] Annex 13 - Working document [towards a preliminary draft new Report] on sharing with Incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9

Word  

999685 bytes 2016-10-14 [196] Annex 12 - Working document [towards a prelimInary draft new Report] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9

Word  

134899 bytes 2016-10-14 [196] Annex 11 - Working document [Towards a preliminary draft new Recommendation/Report] ITU-R S.[NGSO_6/4-GHZ] on technical and regulatory studies for 6/4 GHz GSO/NON-GSO FSS sharing

Word  

1054676 bytes 2016-10-14 [196] Annex 10 - Working document towards a preliminary draft new Report ITU-R S.[NGSO FSS 6/4 GHZ SHARING]

Word  

2449697 bytes 2016-10-14 [196] Annex 09 - Working document [towards a preliminary draft new Report/Recommendation] on sharing between 50/40 GHz GSO and non-GSO systems - WRC-19 agenda item 1.6

Word  

825364 bytes 2016-10-14 [196] Annex 08 - Working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2 50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6

Word  

111368 bytes 2016-10-13 [196] Annex 07 - Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems

Word  

127058 bytes 2016-10-07 [196] Annex 06 - Working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] - Studies on compatibility of International Mobile Telecommunications and broadcasting-satellite service (sound) in the frequency band 1 452-1 492 MHz in Regions 1 and 3 - WRC-19 agenda item 9.1, issue 9.1.2

Word  

1954915 bytes 2016-10-12 [196] Annex 05 - Working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev.WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions

Word  

1764284 bytes 2016-10-12 [196] Annex 04 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1323-2 - Maximum permissible levels of interference in a satellite network (GSO/FSS; non-GSO/FSS; non-GSO/MSS feeder links) in the fixed-satellite service caused by other co-directional FSS networks operating in frequency bands below 52.4 GHz

Word  

69232 bytes 2016-10-12 [196] Annex 03 - Working document towards a preliminary draft new [Recommendation/REPORT] ITU-R S.[GUIDELINES_14.5-14.8 GHz] - Guidelines to conduct bilateral coordination for explicit agreements, in the frequency band14.5-14.75 GHz, for Regions 1 and 2 countries, or in the frequency band14.5-14.8 GHz

Word  

139928 bytes 2016-10-07 [196] Annex 02 - Working document towards a preliminary draft new Recommendation/Report ITU-R S.[INTERF.AREA] - A guiding methodology using Appendix 7 of the Radio Regulations to determine the area where ubiquitously deployed earth stations of the fixed-satellite service can be deployed [without triggering coordination with other countries]

Word  

199008 bytes 2016-10-11 [196] Annex 01 - Preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UA] - Technical and operational characteristics of Unmanned Aircraft Control and Non-Payload satellite communication links operated in certain frequency bands allocated to the fixed-satellite service not subject to RR Appendices 30, 30A and 30B

Word  

154438 bytes 2016-11-03 [196]  - Report on the meeting of Working Party 4A (Geneva, 28 September - 6 October 2016)
 

Document :

ITU-R WP4A  Contribution  196

Title :

Report on the meeting of Working Party 4A (Geneva, 28 September - 6 October 2016)

Date :

2016-10-06

Source :

Chairman, WP 4A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2016-11-03