International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum Management Methodologies and Economic Strategies

Results:383 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 383 ]  
 
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-T Study Group 3 and ITU-R Study Group 1 Working Party 1B on economic aspects of spectrum management and sharing - Economic policies and methods of determining the costs of services related to national telecommunication/information and communication technology networks, including next-generation networks     ITU-D SG 1     2019-10-09
[ 382 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Working Parties 1A, 1B and 1C on collaboration - ITU-D Study Group 1 Question 2/1: Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and the implementation of new services     ITU-D SG 1     2019-10-02
[ 381 ]  
 
Liaison statement to Working Parties 1B, 5A, 5B and 5D on activities on wireless power transmission via radio frequency beam     WP 1A     2019-06-24
[ 380 ]  
+Ann.1-4 
Report on the seventh 2015-2019 meeting of Working Party 1B (Geneva, 28 May - 5 May 2019)     Chairman, WP 1B     2019-06-05
[ 379 ]  
 
Final list of participants - Working Party 1B (Geneva, 28 May - 5 June 2019)     Director, BR     2019-06-05
[ 378 ]  
 
Liaison statement to Working Party 1B (copy to Working Party 1A, for information) - On protection criteria for SFTS en relation to WRC-19 agenda item 9.1, issue 9.1.6     WP 7A   AI9.1   2019-05-31
[ 377 ]  
 
List of documents issued (Documents 1B/341 - 1B/377)     BR Study Groups Department     2019-05-27
[ 376 ]  
(Rev.2) 
Reply liaison statement to Wokring Parties 1B, 5A and 6A - Building entry losses in the range 9 kHz to 10 MHz (far-field and near fiel)     WPs 3J, 3K, 3L and 3M     2019-05-27
[ 375 ]  
 
Report on CISPR activities from November 2018 to May 2019     Rapporteur, SG 1 RG on Liaison with CISPR     2019-05-27
[ 374 ]  
 
Establishment of liaison between CISPR B and the relevant Groups in ITU-R     International Special Committee on Radio Interference     2019-05-20
[ 373 ]  
 
Liaison statement to ITU-R on the activity of the wireless power transfer for electric vehicles in CISPR 11 standard     International Special Committee on Radio Interference     2019-05-20
[ 372 ]  
 
Update to study on the impact of WPT-EV on the 60 KHz standard frequency and time signal service     United Kingdom of Great Britain and Northern Ireland   AI9.1   2019-05-21
[ 371 ]  
 
Modification to the PDR Recommendation ITU-R SM.2110 to reflect the outcomes of studies     United Kingdom of Great Britain and Northern Ireland   AI9.1   2019-05-21
[ 370 ]  
 
Proposed revisions to Annex 2 to Working Party 1B Chairman's Report (1B/341) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT] - Assessment of impact of wireless power transmission for electric vehicle charging (WPT-EV) on radiocommunication services     European Broadcasting Union     2019-05-21
[ 369 ]  
 
Proposed revision of the draft revision of Report ITU-R SM.2015-0 - Methods for determining national long-term strategies for spectrum utilization     Korea (Republic of)   Q205/1   2019-05-21
[ 368 ]  
 
Proposal for an update of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT]     Korea (Republic of)   Q210/1, AI9.1   2019-05-21
[ 367 ]  
 
Proposal for a draft new ITU-R Question - Methodologies for Balancing between Spectrum Supply and Demand in Spectrum Management     Korea (Republic of)     2019-05-21
[ 366 ]  
 
Proposed modification of working document towards a preliminary draft new Report ITU-R SM.[SPECTRUM AUCTION] - [Assessment of spectrum efficiency and economic value]     Korea (Republic of)   Q240/1   2019-05-21
[ 365 ]  
 
The proposal of modification to the working document of preliminary draft new Report on the question of "Assessment of spectrum efficiency and economoic value"     China (People's Republic of)     2019-05-21
[ 364 ]  
 
Proposed revision of elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION]     Japan   Q210-3/1   2019-05-20
[ 363 ]  
 
Proposed revision of working document towards a preliminary draft new Report ITU-R SM.[WPT_EV_IMPACT]     Japan   AI9.1   2019-05-20
[ 362 ]  
 
Proposal of working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED]     Japan   AI9.1   2019-05-20
[ 361 ]  
 
Proposed editorial revision of thirteen Recommendations assigned to ITU-R Working Party 1B     Chairman, SG 1 CG on editorial review     2019-05-17
[ 360 ]  
 
Comments for mandatory format to the ITU-R Recommendations assigned to ITU-R Working Party 1B     Chairman, SG 1 CG on editorial review     2019-05-17
[ 359 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles     Germany (Federal Republic of)   Q210/1, AI901   2019-05-15
[ 358 ]  
 
Elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION] - [Regulatory considerations of wireless power transmission (WPT)]     Germany (Federal Republic of)   Q210/1   2019-05-15
[ 357 ]  
 
Elements for working document towards a preliminary draft new Recommendation ITU-R SM.[WPT-UNWANTED] - Emission fields in the spurious domain from WPT systems     International Amateur Radio Union (IARU)   AI9.1   2019-05-15
[ 356 ]  
 
Reply from SAE J2954 on EV WPT EMI of harmonics 9.0 kHz to 30 MHz     Director, BR     2019-05-14
[ 355 ]  
 
Liaison statement on draft new Recommendation ITU-T D.264 on "Shared use of spectrum and telecommunication infrastructure as possible methods for enhancing the efficiency of telecommunications"     ITU-T SG 3     2019-05-10
[ 354 ]  
 
Preliminary draft new Recommendation ITU-R SM.[WPT-EV_FREQUENCIES] - Frequency ranges for operation of non-beam wireless power transmission systems for electric vehicles     United States of America   Q210/1   2019-05-09
[ 353 ]  
 
Proposed suppression of elements for a working document towards a preliminary draft new Report ITU-R SM.[WPT-REGULATION]     United States of America   Q210/1   2019-05-09
[ 352 ]  
 
Proposed revision to working document towards a preliminary draft new Report ITU-R SM.[SPECTRUM AUCTIONS]     United States of America   Q240/1   2019-05-09
[ 351 ]  
 
Measurements of the Man-made Noise Floor     International Amateur Radio Union     2019-05-08
[ 350 ]  
 
Recently published ECC Report 289 on wireless power transmission (WPT) systems for electrical vehicles (EV) operating within 79-90 KHz band     Netherlands (Kingdom of the)     2019-04-24
[ 349 ]  
 
Liaison to ITU-R on proctection of Radio Services     International Special Committee on Radio Interference     2019-04-17
[ 348 ]  
 
Liaison statement to Working Parties 3L and 3K (copy for information to Working Parties 1A, 1B and 5A) - Building entry losses in the frequency range 9 kHz to 10 MHz (far field and near field)     WP 6A     2019-04-08
[ 347 ]  
 
Liaison statement to Working Parties 1A and 1B (copy for information Working Parties 5A, 5B, and 7A) - Frequency use by non-beam Wireless Power Transmission (WPT) applications using inductive power transfer     WP 6A     2019-02-04
[ 346 ]  
 
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Working Party 1B on economic aspects of spectrum management and sharing - ITU-D Study Group 1 Question 4/1: Economic policies and methods of determining the costs of services related to national telecommunications/information and communication technology networks, including next-generation networks     ITU-D SG 1     2019-03-26
[ 345 ]  
 
Liaison statement on "Request to update the IoT and SC&C Standards Roadmap and the list of contact points"     JCA-IoT and SC&C     2019-01-08
[ 344 ]  
 
Liaison statement - Evolution of magnetic field strength requirements in CISPR 14-1     International Special Committee on Radio Interference     2018-12-21
[ 343 ]  
 
Liaison statement on ITU inter-Sector coordination     ITU-T TSAG     2018-12-17
[ 342 ]  
 
Liaison statement - Discussion of a work proposal on spectrum sharing     ITU-T SG 12     2018-12-07
[ 341 ]  
+Ann.1-8 
Report on the sixth 2015-2019 meeting of Working Party 1B (Geneva, 16-20 November 2018)     Acting Chairman, WP 1B     2018-11-20
[ 340 ]  
 
Final list of participants Working Party 1B (Geneva, 16 - 20 November 2018)     Director, BR     2018-11-20
[ 339 ]  
 
Liaison statement to Working Parties 1A and 1B (copy for information to ICAO) - Aeronautical radionavigation service information for Wireless Power Transmission (WPT)     WP 5B   Q210/1   2018-11-16
[ 338 ]  
 
List of documents issued (Documents 1B/303 - 1B/337)     BR Study Groups Department     2018-11-15
[ 337 ]  
(Rev.1) 
Report on current status of WPT issues in CISPR - June to October 2018     SG 1 Rapp. to CISPR on WPT issues     2018-11-13
[ 336 ]  
 
Liaison statement to Working Parties 1A and 3L (copy to Working Parties 1B, 5B and 6A) - Comments on Report ITU-R SM.[WPT_100-148.5kHz]     WP 5A     2018-11-09
[ 335 ]  
 
Proposed modifications to Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]"     European Broadcasting Union   Q210/1, AI9.1   2018-11-09
[ 334 ]  
 
Proposed modifications to Section 3 of Annex 4 to Document 1B/303 "Working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]"     European Broadcasting Union   Q210/1, AI9.1   2018-11-09
Results:383 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-16