|
Format |
Size |
Posted |
|
|
|
English |
Word
|
55929 bytes |
2017-07-11 |
[208] Annex 15
- Reply liaison statement to 3GPP on Report ITU-R SM.2351 (Question ITU-R 236/1) |
|
Word
|
622912 bytes |
2017-07-11 |
[208] Annex 14
- Draft elements for adding text on MIMO operation into ITU-R Reports on PLT (Questions ITU-R 221-2/1) |
|
Word
|
1612533 bytes |
2017-07-11 |
[208] Annex 13
- Working document towards a preliminary draft new Report ITU-R SM.[NAT-APR] - National approaches and experiences on the compatibility assessments between the sound-broadcasting service in the band 87-108 MHz and the aeronautical services in the band 108-137 MHz |
|
Word
|
2532985 bytes |
2017-07-10 |
[208] Annex 12
- Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Unwanted emissions of digital radio systems |
|
Word
|
566339 bytes |
2017-07-10 |
[208] Annex 11
- Working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications |
|
Word
|
138880 bytes |
2017-07-10 |
[208] Annex 10
- Working Document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services |
|
Word
|
1092825 bytes |
2017-07-10 |
[208] Annex 09 Part 1
|
|
Word
|
1285006 bytes |
2017-07-10 |
[208] Annex 09
- Working document towards a preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz |
|
Word
|
136286 bytes |
2017-07-10 |
[208] Annex 08 Part 1
|
|
Word
|
185404 bytes |
2017-07-10 |
[208] Annex 08
- Working document towards a preliminary draft new Report on Issues associated with the maintenance of Recommendation ITU-R SM.1448 |
|
Word
|
54704 bytes |
2017-07-10 |
[208] Annex 07
- Liaison statement to external organizations and Standards Development Organizations (Copy to IEC TC 69/JPT 61980, ISO TC 22 and IEC TC 9) - Study on Question ITU-R 210-3/1 "Wireless power transmission" and WRC-19 agenda item 9.1, issue 9.1.6 in response to Res. 958 (WRC-15) Annex item 1 |
|
Word
|
46784 bytes |
2017-07-10 |
[208] Annex 06
- Terms of reference (tor) for the Working Parties 1A and 1B Rapporteur Group (RG-WPT) on developing content for deliverables related to Question ITU-R 210-3/1 - Wireless Power Transmission and WRC-19 agenda item 9.1 in response to Resolution 958 (WRC-15) "Urgent studies required in preparation for the 2019 World Radiocommunication Conference" Annex item 1 |
|
Word
|
420850 bytes |
2017-07-10 |
[208] Annex 05
- Work plan for ITU-R Reports on wireless power transmission via radio frequency beam |
|
Word
|
47006 bytes |
2017-07-10 |
[208] Annex 04
- Working document towards a preliminary draft new Report ITU-R SM.[WPT.WIDE-BEAM.IMPACTS] - Impact study and human hazard issues for Wireless Power Transmission
via radio frequency wide-beam
|
|
Word
|
1617277 bytes |
2017-07-10 |
[208] Annex 03
- Working document towards a preliminary draft new Report ITU-R SM.[275-450GHZ_SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz |
|
Word
|
47528 bytes |
2017-07-10 |
[208] Annex 02
- Work plan and milestones for ITU-R studies on WRC-19 agenda item 1.15 |
|
Word
|
56348 bytes |
2017-07-10 |
[208] Annex 01
- Working document towards draft CPM Text for WRC-19 agenda item 1.15 |
|
Word
|
88846 bytes |
2017-07-14 |
[208]
- Report of the third 2015-2019 meeting of Working Party 1A (Geneva, 13-20 June 2017) |
|
|