International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions : 144 Recently posted -  Search Meeting Documents
   
[144]  Report on the second 2015-2019 meeting of Working Party 1A (Geneva, 22 - 30 November 2016)

Format

Size

Posted

English

Word  

70240 bytes 2016-12-16 [144] Annex 24 - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Unwanted emissions of digital radio systems

Word  

79980 bytes 2016-12-13 [144] Annex 23 - A brief history of the development of Recommendation ITU-R SM.1448 and issues associated with its revision

Word  

145610 bytes 2016-12-13 [144] Annex 22 - Working document towards a preliminary draft new Report ITU-R SM.[Sharing-METHODS] - Methods for sharing between radiocommunication services

Word  

1645370 bytes 2016-12-13 [144] Annex 21 - Working document towards a preliminary draft new Report ITU-R SM.[NAT-APR] - National approaches and experiences on the compatibility assessments between the sound-broadcasting service in the band 87-108 MHz and the aeronautical services in the band 108-137 MHz in some administrations

Word  

68060 bytes 2016-12-13 [144] Annex 20 - Liaison statement to IARU, ICAO, EBU - assessment of the impact of unwanted radio frequency energy generated by non radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 & ITU-R 236/1)

Word  

70420 bytes 2016-12-20 [144] Annex 19 - Liaison statement to External Organizations - Characteristics for use of visible light for broadband communications

Word  

62087 bytes 2016-12-20 [144] Annex 18 - Liaison statement to ITU-T Study Group 15 - Visible light for broadband communications

Word  

75152 bytes 2016-12-13 [144] Annex 17 - Working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications

Word  

1017376 bytes 2016-12-23 [144] Annex 16 - Working document towards a preliminary draft revision of Report ITU-R SM.2028-1 - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems

Word  

2432173 bytes 2017-04-20 [144] Annex 16 Revision 1 - Working document towards a preliminary draft revision of Report ITU-R SM.2028-1 - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems

Word  

66239 bytes 2016-12-12 [144] Annex 15 - Liaison statement to CENELEC CLC/TC 210 - Considerations on incorporating MIMO into CENELEC Standards on power line communications (PLC)

Word  

105199 bytes 2016-12-13 [144] Annex 14 - Draft elements for adding text on MIMO operation into ITU-R Reports on PLT

Word  

64434 bytes 2016-12-13 [144] Annex 13 - Liaison statement to external Organizations - Preliminary draft revision of Report ITU-R SM.2351-1 on smart grid utility management systems

Word  

119732 bytes 2016-12-13 [144] Annex 12 - Preliminary draft modification of Report ITU-R SM.2351-1 - Smart grid utility management systems

Word  

70738 bytes 2016-12-12 [144] Annex 11 - Reply liaison statement to IEC on WPT activities concerning EMF

Word  

68614 bytes 2016-12-13 [144] Annex 10 - Liaison statement to External Organizations and Standards Development Organizations (copy to IEC TC 69/JPT 61980, ISO TC 22 and IEC TC 9) - Study on Question ITU-R 210-3/1 "Wireless power transmission" and WRC-19 agenda item 9.1, issue 9.1.6 in response to Res. 958 (WRC-15) Annex item 1

Word  

62929 bytes 2016-12-12 [144] Annex 09 - Reply liaison statement to ETSI on WPT activities

Word  

65035 bytes 2016-12-13 [144] Annex 08 - Terms of Reference (ToR) for the Working Parties 1A and 1B Rapporteur Group (RG-WPT) on developing content for deliverables related to Question ITU-R 210-3/1 - Wireless power transmission and WRC-19 agenda item 9.1 in response to Resolution 958 (WRC-15) "Urgent studies required in preparation for the 2019 World Radiocommunication Conference" Annex item 1

Word  

443138 bytes 2016-12-12 [144] Annex 07 - Work plan for ITU-R Reports on wireless power transmission via radio frequency beam

Word  

6174842 bytes 2016-12-13 [144] Annex 06 - Preliminary draft revision of Report ITU-R SM.2303-1 - Wireless power transmission using technologies other than radio frequency beam

Word  

72046 bytes 2016-12-12 [144] Annex 05 - Draft new Recommendation ITU-R SM.[WPT] - Frequency ranges for operation of non-beam Wireless Power Transmission (WPT) systems

Word  

80894 bytes 2016-12-13 [144] Annex 04 - Preliminary draft revision of Recommendation ITU-R SM.851-1 - Sharing between the broadcasting service and the fixed and/or mobile services in the VHF and UHF bands

Word  

414478 bytes 2016-12-12 [144] Annex 03 - Working document towards a preliminary draft new Report ITU-R SM.[300GHZ-SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz

Word  

64210 bytes 2016-12-12 [144] Annex 02 - Working document on the work plan and milestones for the ITU-R studies on WRC 19 agenda item 1.15 - Draft work plan and milestones for ITU-R studies on WRC-19 agenda item 1.15

Word  

42559 bytes 2017-01-17 [144] Corrigendum 1 - Report of the second 2015-2019 meeting of Working Party 1A (Geneva, 22-30 November 2016)

Word  

61002 bytes 2016-12-12 [144] Annex 01 - Draft outline for CPM Text for WRC-19 agenda item 1.15

Word  

100368 bytes 2016-12-20 [144]  - Report of the second 2015-2019 meeting of Working Party 1a (Geneva, 22-30 November 2016)
 

Document :

ITU-R WP1A  Contribution  144

Title :

Report on the second 2015-2019 meeting of Working Party 1A (Geneva, 22 - 30 November 2016)

Date :

2016-11-30

Source :

Chairman, WP 1A

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2017-04-20