|
Format |
Size |
Posted |
|
|
|
English |
Word
|
70240 bytes |
2016-12-16 |
[144] Annex 24
- Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] - Unwanted emissions of digital radio systems |
|
Word
|
79980 bytes |
2016-12-13 |
[144] Annex 23
- A brief history of the development of Recommendation ITU-R SM.1448 and issues associated with its revision |
|
Word
|
145610 bytes |
2016-12-13 |
[144] Annex 22
- Working document towards a preliminary draft new Report ITU-R SM.[Sharing-METHODS] - Methods for sharing between radiocommunication services |
|
Word
|
1645370 bytes |
2016-12-13 |
[144] Annex 21
- Working document towards a preliminary draft new Report ITU-R SM.[NAT-APR] - National approaches and experiences on the compatibility assessments between the sound-broadcasting service in the band 87-108 MHz and the aeronautical services in the band 108-137 MHz in some administrations |
|
Word
|
68060 bytes |
2016-12-13 |
[144] Annex 20
- Liaison statement to IARU, ICAO, EBU - assessment of the impact of unwanted radio frequency energy generated by non radiocommunication equipment to radiocommunication services
(Questions ITU-R 221-2/1 & ITU-R 236/1) |
|
Word
|
70420 bytes |
2016-12-20 |
[144] Annex 19
- Liaison statement to External Organizations - Characteristics for use of visible light for broadband communications |
|
Word
|
62087 bytes |
2016-12-20 |
[144] Annex 18
- Liaison statement to ITU-T Study Group 15 - Visible light for broadband communications |
|
Word
|
75152 bytes |
2016-12-13 |
[144] Annex 17
- Working document towards a preliminary draft new Report ITU-R SM.[VISIBLE-LIGHT] - Visible Light for Broadband Communications |
|
Word
|
1017376 bytes |
2016-12-23 |
[144] Annex 16
- Working document towards a preliminary draft revision of Report ITU-R SM.2028-1 - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems |
|
Word
|
2432173 bytes |
2017-04-20 |
[144] Annex 16 Revision 1
- Working document towards a preliminary draft revision of Report ITU-R SM.2028-1 - Monte Carlo simulation methodology for the use in sharing and compatibility studies between different radio services or systems |
|
Word
|
66239 bytes |
2016-12-12 |
[144] Annex 15
- Liaison statement to CENELEC CLC/TC 210 - Considerations on incorporating MIMO into CENELEC Standards on power line communications (PLC) |
|
Word
|
105199 bytes |
2016-12-13 |
[144] Annex 14
- Draft elements for adding text on MIMO operation into ITU-R Reports on PLT |
|
Word
|
64434 bytes |
2016-12-13 |
[144] Annex 13
- Liaison statement to external Organizations - Preliminary draft revision of Report ITU-R SM.2351-1 on smart grid utility management systems |
|
Word
|
119732 bytes |
2016-12-13 |
[144] Annex 12
- Preliminary draft modification of Report ITU-R SM.2351-1 - Smart grid utility management systems |
|
Word
|
70738 bytes |
2016-12-12 |
[144] Annex 11
- Reply liaison statement to IEC on WPT activities concerning EMF |
|
Word
|
68614 bytes |
2016-12-13 |
[144] Annex 10
- Liaison statement to External Organizations and Standards Development Organizations (copy to IEC TC 69/JPT 61980, ISO TC 22 and IEC TC 9) - Study on Question ITU-R 210-3/1 "Wireless power transmission" and WRC-19 agenda item 9.1, issue 9.1.6 in response to Res. 958 (WRC-15) Annex item 1 |
|
Word
|
62929 bytes |
2016-12-12 |
[144] Annex 09
- Reply liaison statement to ETSI on WPT activities |
|
Word
|
65035 bytes |
2016-12-13 |
[144] Annex 08
- Terms of Reference (ToR) for the Working Parties 1A and 1B Rapporteur Group (RG-WPT) on developing content for deliverables related to Question ITU-R 210-3/1 - Wireless power transmission and WRC-19 agenda item 9.1 in response to Resolution 958 (WRC-15) "Urgent studies required in preparation for the 2019 World Radiocommunication Conference" Annex item 1 |
|
Word
|
443138 bytes |
2016-12-12 |
[144] Annex 07
- Work plan for ITU-R Reports on wireless power transmission via radio frequency beam |
|
Word
|
6174842 bytes |
2016-12-13 |
[144] Annex 06
- Preliminary draft revision of Report ITU-R SM.2303-1 - Wireless power transmission using technologies other than radio frequency beam |
|
Word
|
72046 bytes |
2016-12-12 |
[144] Annex 05
- Draft new Recommendation ITU-R SM.[WPT] - Frequency ranges for operation of non-beam Wireless Power Transmission (WPT) systems |
|
Word
|
80894 bytes |
2016-12-13 |
[144] Annex 04
- Preliminary draft revision of Recommendation ITU-R SM.851-1 - Sharing between the broadcasting service and the fixed and/or mobile services in the VHF and UHF bands |
|
Word
|
414478 bytes |
2016-12-12 |
[144] Annex 03
- Working document towards a preliminary draft new Report ITU-R SM.[300GHZ-SHARING] - Sharing and compatibility studies between land-mobile, fixed and passive services in the frequency range 275-450 GHz |
|
Word
|
64210 bytes |
2016-12-12 |
[144] Annex 02
- Working document on the work plan and milestones for the ITU-R studies on WRC 19 agenda item 1.15 - Draft work plan and milestones for ITU-R studies on WRC-19 agenda item 1.15 |
|
Word
|
42559 bytes |
2017-01-17 |
[144] Corrigendum 1
- Report of the second 2015-2019 meeting of Working Party 1A (Geneva, 22-30 November 2016) |
|
Word
|
61002 bytes |
2016-12-12 |
[144] Annex 01
- Draft outline for CPM Text for WRC-19 agenda item 1.15 |
|
Word
|
100368 bytes |
2016-12-20 |
[144]
- Report of the second 2015-2019 meeting of Working Party 1a (Geneva, 22-30 November 2016) |
|
|