International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP3M : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP3M  C 

ITU-R WP3M

Point-to-point and Earth-space propagation

Results:145 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 145 ]  
 
2014-08-21 Canada   Information document concerning propagation related matters regarding the technical feasibility of IMT in the bands above 6 GHz     N/A  
[ 144 ]  
 
2014-08-19 ORANGE POLSKA S.A.   Results of the measurements of the field strength     N/A  
[ 143 ]  
 
2014-08-01 Spain   Contribution to the propagation databanks - Seven-year rain rate and slant-path rain attenuation measurements in Madrid. Yearly and monthly distributions     N/A  
[ 142 ]  
 
2014-08-01 Spain   Comparison of predictions provided by a recent rainfall rate model with experimental distributions     N/A  
[ 141 ]  
 
2014-08-01 Spain   Contribution to the propagation data banks - Rainfall rate measurements in Spain     N/A  
[ 140 ]  
 
2014-07-22 European Telecommunications Standards Institute   Liaison statement: Clarification of calculations to be used for NLOS links planning     N/A  
[ 139 ]  
 
2014-07-02 WP 5D   Liaison statement to Working Parties 3K and 3M - Technical feasibility of IMT in the bands above 6 GHz     N/A  
[ 138 ]  
 
2014-06-13 Chairmen, WPs 3K and 3M   Reply liaison statement to Working Party 5D - Propagation models to be used in sharing studies between the fixed satellite service and small cell deployment of IMT systems in the frequency band 3 400-3 600 MHz     N/A  
[ 137 ]  
 
2014-06-03 WP 5A   Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     N/A  
[ 136 ]  
 
2014-05-28 WP 5C   Liaison statement to Working Parties 3J, 3K and 3M - Propagation models for planning and interference assessment involving fixed service links in bands above 50 GHz     N/A  
[ 135 ]  
 
2014-05-28 WP 5C   Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     N/A  
[ 134 ]  
 
2014-05-28 WP 5C   Liaison statement to Working Party 4C (copy to Working Parties 3M, 4A, 4B, 5A, 5B and 7B for information) - WRC-15 agenda item 1.9.2     N/A  
[ 133 ]  
 
2014-03-24 WP 4C   Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10     N/A  
[ 132 ]  
 
2014-03-24 WP 4C   Liaison statement to Working Parties 3M, 4A, 4B 5A, 5B, 5C and 7B - WRC-15 agenda item 1.9.2     N/A  
[ 131 ]  
 
2014-02-26 WP 5D   Reply liaison statement to Working Parties 3K and 3M - Propagation models to be used in sharing studies between the fixed satellite service and Small Cell deployment of IMT systems in the frequency band 3 400-3 600 MHz     N/A  
[ 130 ]  
 
2014-02-12 Chairmen, WPs 3K and 3M   Reply liaison statement to Working Party 5D - Propagation models to be used in sharing studies between the fixed satellite service and small cell deployment of IMT systems in the frequency band 3 400-3 600 MHz     N/A  
[ 129 ]  
 
2013-10-29 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to all concerned Groups under WRC-15 agenda item 1.1 (Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, 3K, 3M, and Working Party 1A)) - Sharing parameters for WRC-15 agenda item 1.1     N/A  
[ 128 ]  
 
2013-10-28 WP 5D   Liaison statement to Working Parties 3K and 3M - Propagation models to be used in sharing studies between the fixed satellite service and small cell deployment of IMT systems in the frequency band 3 400-3 600 MHz     N/A  
[ 127 ]  
 
2013-10-21 Chairmen, WPs 3K and 3M   Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 6A and 5D for information)     N/A  
[ 126 ]  
 
2013-10-07 WP 4B   Liaison statement to Working Parties 3K, 3M and 5B - Guidance on the application of propagation Recommendations to unmanned aircraft systems (WRC-15 agenda item 1.5)     N/A  
[ 125 ]  
 
2013-06-25 Portugal   Proposed additions to ITU-R Study Group 3 databanks in Part II - Earth space path data     N/A  
[ 124 ]  
 
2013-08-05 JTG 4-5-6-7   Liaison statement to Working Parties 3K and 3M (copy to Working Parties 6A and 5D for information)     N/A  
[ 123 ]  
+Ann.1-4 
2013-07-01 Chairman, WP 3M   Report on the meeting of Working Party 3M (Geneva, 17 - 26 June 2013)     N/A  
[ 122 ]  
 
2013-06-26 Director, BR   Final list of participants - Working Party 3M (Geneva, 17-26 June 2013)     N/A  
[ 121 ]  
 
2013-06-14 BR Study Groups Department   List of documents issued (Documents 3M/50 - 3M/121)     N/A  
Results:145 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-08-21