Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP3K : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP3K  C 

UIT-R WP3K

Propagación de Punto a Zona

Resultados :44 documentos
Resultados :  1 - 2  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Fecha Origen Título Cuestiones
[ 44 ]  
 
2013-05-09 WP 6A   Liaison statement to Working Party 3K - Response to the Report on the Correspondence Group 3K-4 concerning the correlation of short term interfering signals     N/A (no se aplica)  
[ 43 ]  
 
2013-05-02 Chairman, SG 3   Provisional assignment of the Study Group 3 texts to Working Parties 3J, 3K, 3L and 3M     N/A (no se aplica)  
[ 42 ]  
 
2013-02-18 WP 5D   Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)     N/A (no se aplica)  
[ 41 ]  
 
2013-02-18 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     N/A (no se aplica)  
[ 40 ]  
 
2013-01-28 SG 1   Question ITU-R 210-3/1     N/A (no se aplica)  
[ 39 ]  
 
2012-11-30 JTG 4-5-6-7   Liaison statement to Working Party 3K (copy to Working Parties 3M, 6A, 5D and 5B for information) - Appropriate propagation information where a current Recommendation may not seem to be wholly applicable     N/A (no se aplica)  
[ 38 ]  
 
2012-11-16 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     N/A (no se aplica)  
[ 37 ]  
 
2012-11-16 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy to Workin Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     N/A (no se aplica)  
[ 36 ]  
(Rev.1) 
2012-11-09 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     N/A (no se aplica)  
[ 35 ]  
 
2012-11-09 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     N/A (no se aplica)  
[ 34 ]  
 
2012-11-02 WP 6A   Liaison statement to Working Party 3K (copy to JTG 4-5-6-7, Working Parties 5A, 5C and 5D for information) on the correlation of short-term interfering signals     N/A (no se aplica)  
[ 33 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 - Sharing parameters for WRC-15 Agenda item 1.2     N/A (no se aplica)  
[ 32 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     N/A (no se aplica)  
[ 31 ]  
 
2012-10-16 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     N/A (no se aplica)  
[ 30 ]  
 
2012-07-23 WP 5D   Liaison statement to Working Party 3K - Method of the aggregate e.i.r.p. value assessment from multiple LTE user equipment operating simultaneously wiht the notified base station     N/A (no se aplica)  
[ 29 ]  
+Ann.1-10 
2012-07-04 Chairman, WP 3K   Report on the meeting of Working Party 3K (Geneva, 18 - 27 June 2012)     N/A (no se aplica)  
[ 28 ]  
 
2012-06-27 Director, BR   Final List of Participants - Working Party 3K (Geneva, 18-27 June 2012)     N/A (no se aplica)  
[ 27 ]  
 
2012-06-22 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     N/A (no se aplica)  
[ 26 ]  
 
2012-06-15 BR Study Group Department   List of documents issued     N/A (no se aplica)  
[ 25 ]  
 
2012-06-11 Korea (Republic of)   Proposed modification of Recommendation ITU-R P.1411-6 - Correction notes for typographical errors and ambiguity clarification     N/A (no se aplica)  
[ 24 ]  
 
2012-06-11 Korea (Republic of)   Proposed revision of Recommendation ITU-R P.1411-6 - Modification of the structure for multipath models     211-5/3  
[ 23 ]  
 
2012-06-11 Korea (Republic of)   Proposed modification of Recommendation ITU-R P.1411-6 - Propagation data and prediction methods for the planning of short-range outdoor radiocommunication systems and radio local area networks in the frequency range 300 MHz to 100 GHz     N/A (no se aplica)  
[ 22 ]  
 
2012-06-11 European Broadcasting Union (EBU)   Proposed definition of "location probability" in terrestrial broadcasting     N/A (no se aplica)  
[ 21 ]  
 
2012-06-11 Correspondence Group 3K3   Aeronautical and satellite link propagation method     N/A (no se aplica)  
[ 20 ]  
 
2012-06-11 TELEKOMUNIKACJA POLSKA S.A.   Numerical treatment of short paths in Recommendation ITU-R P.1546     203-5/3  
Resultados :44 documentos
Resultados :  1 - 2  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

 

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2013-05-20