Temporary Documents  |
|
Number
|
Received
|
Source
|
Title
|
|
[ 53 ]
|
2013-06-10 |
WP 1A
|
Working document towards a preliminary draft new Report ITU-R SM.[WPT.BEAM] - Wireless power transmission via radio frequency beam
|
|
[ 52 ]
|
2013-06-10 |
WP 1A (WG 1A-2)
|
Wireless Power Transmission (WPT), protection of radiocommunication services and unwanted emissions - Summary conclusions in Working Group 1A-2
|
|
[ 51 ]
|
2013-06-10 |
WP 1A (Drafting Group 1A-2)
|
Draft liaison statement to external organizations- Studies on Question ITU-R 210-3/1 "Wireless power transmission"
|
|
[ 50 ]
|
2013-06-10 |
WP 1A (WG 1A-2)
|
[Draft] Terms of reference (TOR) for a correspondence group (CG-WPT) on developing content for possible preliminary draft new report and recommendation on wpt
|
|
[ 49 ]
|
2013-06-10 |
WP 1A (WG 1A-2, DG 1A-2 (WPT))
|
Working document towards a preliminary draft new Report ITU-R SM.[WPT.NON-BEAM] - Wireless power transmission using technologies other than radio frequency beam
|
|
[ 48 ]
|
2013-06-10 |
WP 1A (WG 1A-2, DG 1A-2 (WPT))
|
Working document towards a preliminary draft new Recommendation ITU-R SM.[WPT] - Wireless power transmission (WPT) systems
|
|
[ 47 ]
|
2013-06-10 |
WP 1A (WG 1A-2, DG 1A-2 (WPT))
|
[Draft] reply liaison statement to APT - Study on Question ITU-R 210-3/1 - Wireless power transmission
|
|
[ 46 ]
|
2013-06-10 |
WP 1A (WG 1A-2, DG 1A-2 (WPT))
|
Draft reply liaison statement to CISPR - Study on Question ITU-R 210-3/1 - Wireless power transmission
|
|
[ 45 ]
|
2013-06-10 |
WP 1A (WG 1A-1)
|
Liaison statement to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T
|
|
[ 44 ]
|
2013-06-10 |
WP 1A (WG 1A-1)
|
Draft revised Terms of Reference for the Rapporteur Group on coexistence of wired telecommunication with radiocommunication systems
|
|
[ 43 ]
|
2013-06-10 |
WP 1A (WG 1A-1)
|
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast
|
|
[ 42 ]
|
2013-06-10 |
WP 1A (WG 1A-1)
|
Liaison statement to ITU-T Study Group 9 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)
|
|
[ 41 ]
|
2013-06-10 |
WP 1A
|
Draft liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5c, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
|
|
[ 40 ]
|
2013-06-10 |
Chairman, WG 1A-1
|
Report from meetings of Working Group 1A-1
|
|
[ 39 ]
|
2013-06-10 |
Chairman, WG 1A-3
|
Report on the second 2012-2015 meeting of Working Party 1A-3
|
|
[ 38 ]
(Rev.1) |
2013-06-10 |
WP 1A (WG 1A-3)
|
Updated terms of reference for the WP 1A Rapporteur Group on the revision of the ITU Handbook on "Computer aided techniques for spectrum management"
|
|
[ 37 ]
|
2013-06-10 |
WP 1A (WG 1A-3)
|
Working document towards a preliminary draft revision of the ITU Handbook on computer-aided techniques for spectrum management (CAT)
|
|
[ 36 ]
|
2013-06-10 |
WP 1A (WG 1A-1)
|
Draft revision of working document towards a preliminary draft new Report ITU-R SM.[SMART_GRID] - Smart grid power management systems
|
|
[ 35 ]
|
2013-06-10 |
WP 1A
|
Liaison statement to Working Party 5B - Continuing studies towards improved out-of-band roll-off for radars to enhance spectrum efficiency
|
|
[ 34 ]
|
2013-06-07 |
WP 1A (WG 1A-2, DG 1A-2 (WPT))
|
Draft reply liaison statement from SG 1 to CISPR - Study on Question ITU-R 210-3/1 "Wireless power transmission"
|
|
[ 33 ]
|
2013-06-07 |
WP 1A
|
Draft liaison statement to Working Party 3L on Question ITU-R 230-2/3 brought to the attention of Study Group 1
|
|
[ 32 ]
|
2013-06-07 |
WP 1A (WG 1A-1)
|
Draft modification of Report ITU-R SM.2158-2 with regard to man-made noise - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
|
[ 31 ]
|
2013-06-07 |
WP 1A (WG 1A-2)
|
Reply liaison statement to Working Party 6A - Comment on Recommendation ITU-R SM.2028
|
|
[ 30 ]
|
2013-06-07 |
WP 1A (WG 1A-1)
|
Draft new Report ITU-R SM.[PLT RAD-PSD] - Methodologies to relate radiation from PLT installations to PLT modem output
|
|
[ 29 ]
|
2013-06-06 |
WP 1A (WG 1A-1)
|
Draft liaison statement to ITU-R Working Party 3L - Long-term man-made noise measurements below 30 MHz
|
Results:33 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):