International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : WP1C : Contributions : 81 Recently posted -  Search Meeting Documents
   
[81]  Report on the meeting of Working Party 1C (Geneva, 16 - 22 September 2009)

ITU-R WP1C

Spectrum monitoring

Contribution  81

Received on 2009-09-23 From Chairman, WP 1C

Access :  Locked Document restricted to TIES users [ITU-R]


Available languages and formats :

 
Down

Click on the selected format
and language to get the document

   
Format Size Posted
English

Word Document Word  

58880 bytes 2009-10-19 [81] Annex 10 - Correspondence Group on review of ITU-R Recommendations and Reports developed by WP 1C (Terms of Reference)

Word Document Word  

58880 bytes 2009-11-3 [81] Annex 09 - Correspondence Group on SRD measurements (Terms of reference)

Word Document Word  

184832 bytes 2009-11-18 [81] Annex 08 Revision 1 - Correspondence Group on spectrum occupancy measurements (terms of reference)

Word Document Word  

179712 bytes 2009-10-14 [81] Annex 07 - Note to the Director of the BDT

Word Document Word  

57856 bytes 2009-10-14 [81] Annex 06 - Correspondence Group on Question ITU-R 230/1 - (Terms of reference)

Word Document Word  

182784 bytes 2009-10-14 [81] Annex 05 - Correspondence Group on revision of ITU-R List VIII - (Terms of reference)

Word Document Word  

184320 bytes 2009-10-13 [81] Annex 04 - Correspondence Group on International monitoring information on emissions from terrestrial stations (Terms of reference)

Word Document Word  

186368 bytes 2009-10-13 [81] Annex 03 - Discussion on Circular letter CR/159 (Arrangements about international monitoring of HF band)

Word Document Word  

1625088 bytes 2009-10-14 [81] Annex 02 - Working document toward a preliminary draft new Report - Use of ITU RR Article 15, Appendix 10 to convey information related to emissions from both GSO and non-GSO space stations including geolocation information

Word Document Word  

5336064 bytes 2009-10-15 [81] Annex 01 - Working document towards a preliminary draft new Report - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations

Word Document Word  

327168 bytes 2009-11-18 [81] Revision 1 - Report of the meeting of Working Party 1C (Geneva, 16-22 September 2009) Report of the meeting of Working Party 1C (Geneva, 16-22 September 2009) Report of the meeting of Working Party 1C (Geneva, 16-22 September 2009)

 

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2009-11-18