International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum management methodologies

Results:136 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 136 ]  
 
Liaison statement to WP 1B - The study of software defined radio and cognitive radio systems in WP 1B     WP 8D     2007-08-10
[ 135 ]  
 
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B     WP 4-9S     2007-06-29
[ 134 ]  
+Ann.1-4 
Chairman's Report of the meeting of Working Party 1B (Geneva, 11-15 June 2007)     Acting Chairman, WP 1B     2007-06-15
[ 133 ]  
 
Final List of Participants - Working Party 1B (Geneva, 11-15 June 2007)     Director, BR     2007-06-15
[ 132 ]  
 
Reply to the liaison statement from WP 1B - The study of software defined radio and cognitive radio systems in WP 1B     WP 8A     2007-06-12
[ 131 ]  
 
Liaison statement to WP 1B - Study of Software Defined Radio and cognitive radio systems in WP 1B     WP 4A     2007-06-08
[ 130 ]  
 
List of documents issued     BR Study Group Department     2007-06-07
[ 129 ]  
 
Information about IEEE SCC 41 activities in advanced radio system technologies and dynamic spectrum management techniques     IEEE     2007-06-03
[ 128 ]  
 
Proposal in response to the "Draft CPM Report to the WRC-07"on Resolution 951 (WRC-03) under a.i. 7.1     France     2007-06-04
[ 127 ]  
 
Proposed changes to Annex 4 of the Chairman's report entitled "Preliminary draft Report to the Director, Radiocommunication Bureau in response to Resolution 951 (WRC-03)"     United States of America     2007-06-01
[ 126 ]  
 
Proposed changes to the "Preliminary draft Report to the Director, Radiocommunication Bureau in response to Resolution 951 (WRC-03)"     Canada , New Zealand     2007-06-01
[ 125 ]  
 
Proposed modifications to the working document towards a preliminary draft revision of Recommendation ITU-R SM.1538-2 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     Japan   213/1   2007-06-01
[ 124 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1538-2 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     NABA   213/1   2007-05-31
[ 123 ]  
 
New Recommendation ITU-R BS.1786 and BT.1786 - Criterion to assess the impact of interference to the terrestrial broadcasting service (BS)     NABA     2007-05-31
[ 122 ]  
 
Text for preliminary draft revision of Recommendation ITU-R SM.1538-2 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     Korea (Republic of)   213/1   2007-06-01
[ 121 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R SM.1538-2 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     Brazil (Federative Republic of)     2007-05-31
[ 120 ]  
 
Liaison statement to Working Parties 1A, 1B and Study Group 1 - Recommendations ITU-R BS.1786 and ITU-R BT.1786 - Criterion to assess the impact of interference to the terrestrial broadcasting service (BS)     SG 6     2007-05-28
[ 119 ]  
 
Information document observations regarding some issues related to Resolution 951 (WRC-03)     Director, BR     2007-05-28
[ 118 ]  
 
New Recommendation ITU-R BS.1786 (Doc. 6/315(Rev.2)) also categorized as ITU-R BT.1786 - Criterion to assess the impact of interference to the terrestrial broadcasting service (BS)     World Broadcasting Unions - Technical Committee     2007-05-24
[ 117 ]  
 
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B     WP 9B and 9D     2007-05-21
[ 116 ]  
(Rev.1) 
Reply to Liaison statement from WP 1B on the study of software defined radio and cognitive radio systems     WP 6S     2007-05-09
[ 115 ]  
 
Reply to Liaison statement from WP 1B     WP 6S     2007-05-09
[ 114 ]  
 
ITU-R Study Group 8 question to be brought to the attention of Working Parties 1B, 4B, 6E and 9B     BR Study Group Department     2007-04-18
[ 113 ]  
 
Liaison statement to Working Party 1B - Possible impact of software defined radio and cognitive radio systems on the radio astronomy service     WP 7D     2007-02-19
[ 112 ]  
 
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B - (Copy for information to ITU-R WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 9B and 9D)     WP 8F     2007-02-16
[ 111 ]  
 
Liaison statement to Working Party 1B - Preliminary draft new Questions ITU-R [1B-SDR] and [1B-CR] - Software Defined Radio and Cognitive Radio Systems     WP 7C     2007-02-12
[ 110 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database     Coordination Committee for Vocabulary (CCV)     2007-01-11
[ 109 ]  
 
Reply to liaison statement from Study Group 1 and Working Party 1B - Improving the international spectrum regulatory framework     Special Committee     2006-12-13
[ 108 ]  
 
Liaison statement from Working Party 8D to Working Party 1B - Improving the international spectrum regulatory framework     WP 8D     2006-11-17
[ 107 ]  
+Ann.1-8 
Chairman's Report of the meeting of Working Party 1B - (Munich, 9-13 October 2006)     Chairman, WP 1B     2006-10-18
[ 106 ]  
 
Final list of participants     Director, BR     2006-10-18
[ 105 ]  
 
List of documents issued     BR Study Group Department     2006-10-18
[ 104 ]  
 
Overview of FM modulator interference to broadcast services     North American Broascasters Association   32/6   2006-10-08
[ 103 ]  
 
Proposed changes to Annex 2 of the Chairman's report entitled "Preliminary draft report to the Director, Radiocommunication Bureau in response to Resolution 951 (WRC-03)"     Canada     2006-10-02
[ 102 ]  
 
The study of software defined radio and cognitive radio systems in Working Party 1B     Canada     2006-10-02
[ 101 ]  
 
Modification to Recommendation ITU-R SM.1538-1     China (People's Republic of)     2006-10-02
[ 100 ]  
 
Proposed revision of Recommendation ITU-R SM.1538-2 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     Japan   213/1   2006-10-02
[ 99 ]  
 
Draft new Report for guidance on the regulatory framework for national spectrum management     France     2006-10-02
[ 98 ]  
 
Proposed revisions to guidance on the regulatory framework for national spectrum management     United Arab Emirates     2006-10-02
[ 97 ]  
(Rev.1) 
Improving the International Spectrum Regulatory Framework     United Kingdom of Great Britain and Northern Ireland   229/1   2006-10-01
[ 96 ]  
 
Improving the International Spectrum Regulatory Framework     New Zealand   229/1   2006-10-02
[ 95 ]  
 
Improving the International spectrum regulatory framework     United States of America     2006-10-02
[ 94 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1538-1     Germany (Federal Republic of)     2006-09-27
[ 93 ]  
 
Proposed working document for modification of Recommendation ITU-R SM.1538-2 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     Korea (Republic of)   213/1   2006-09-22
[ 92 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1599     Russian Federation     2006-07-25
[ 91 ]  
 
Reply liaison statement to Working Party 1B     WP 7C     2006-09-04
[ 90 ]  
 
Liaison statement to WP 1B - Improving the international spectrum regulatory framework     WP 9B     2006-07-24
[ 89 ]  
 
Liaison statement to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and TG 1/9, and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336     WP 9D     2006-07-19
[ 88 ]  
 
Liaison statement to Working Party 1B - The study of software defined radio and cognitive radio systems in terms of spectrum management and inter-service issues     WP 8A     2006-04-27
[ 87 ]  
 
Liaison statement to Working Party 1B     SC-WP     2006-01-23
Results:136 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-17