International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Results:902 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 52 ]  
 
Proposed initial text for L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities)     Korea (Rep. of)   Q8/5   2017-05-02
[ 51 ]  
(Rev.1) 
New work item proposal on smart energy solution for for telecom base station     Ministry of Industry and Information Technology (MIIT), China   Q6/5   2017-05-02
[ 50 ]  
 
Proposed text for clause 6 in L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities)     Korea (Rep. of)   Q8/5   2017-05-02
[ 49 ]  
(Rev.1) 
New work item proposal on smart energy solution for data centre and telecom centre     Ministry of Industry and Information Technology (MIIT), China , China Unicom   Q6/5   2017-05-02
[ 48 ]  
 
Proposal for changing a Figure in Annex III of K.100     Korea (Rep. of)   Q3/5   2017-05-02
[ 47 ]  
 
Proposal for adding a scientific paper in bibliography of K.100     Korea (Rep. of)   Q3/5   2017-05-02
[ 46 ]  
(Rev.1) 
Proposed content for draft ITU-T k.Bprac     GSMA   Q3/5   2017-05-01
[ 45 ]  
 
Proposal for addition of explanatory note to tables in K.70, Annex C     GSMA   Q3/5   2017-05-01
[ 44 ]  
 
The second draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions"     China Unicom   Q1/5   2017-05-01
[ 43 ]  
 
Study and proposal for the drafting of a new recommendation K.xxx - EMF issues arise from RBS site with joint construction and shared physical infrastructure.     China Telecommunications Corporation   Q3/5   2017-04-30
[ 42 ]  
 
The 1st draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipments".     China Telecommunications Corporation   Q4/5   2017-04-30
[ 41 ]  
 
Recommendations for use to reduce exposure to electromagnetic waves.     Universidad Nacional de Río Cuarto   Q3/5   2017-04-29
[ 40 ]  
(Rev.1) 
Review of K.20, K.21, K.44 and K.45 - Part 1 K.20, K.21 and K.45 Test tables columns 1 through 3     Bourns Limited   Q2/5   2017-04-29
[ 39 ]  
 
mKRISHI Fisheries': Mobile Application on using ICT in adapting to climate change effects in the fisheries sector     Egypt   Q8/5   2017-04-29
[ 38 ]  
 
Best Practices of the use of mobile devices for exposure reduction     ORANGE POLSKA S.A.   Q3/5   2017-04-28
[ 37 ]  
(Rev.1) 
The second draft introduction for the ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2"     Consorzio Nazionale Interuniversitario per le Telecomunicazioni , Orange   Q6/5   2017-04-28
[ 36 ]  
(Rev.1) 
A.1 justification for proposed draft new Recommendation L.SIBNode     Secretaría de Estado para la Sociedad de la Información y la Agenda Digital, Spain   Q9/5   2017-04-28
[ 35 ]  
 
Sustainable and intelligent building services     Secretaría de Estado para la Sociedad de la Información y la Agenda Digital, Spain   Q9/5   2017-04-28
[ 34 ]  
(Rev.1) 
Document with information relevant to new Recommendation ITU-T K.BPrac     Orange , ORANGE POLSKA S.A.   Q3/5   2017-04-28
[ 33 ]  
(Rev.1) 
Proposal of the revision of ITU-T Recommendation K.91 (05/2012) "Guidance for assessment, evaluation and monitoring of human exposure to radio frequency electromagnetic fields"     ORANGE POLSKA S.A.   Q3/5   2017-04-28
[ 32 ]  
(Rev.1) 
Proposed change on flowchart for K.44 to select resistibility level of equipment in customer premises being discussed     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-28
[ 31 ]  
(Rev.1-2) 
Proposal of first draft "Supplement to K_soft_des Soft error measures for FPGA"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2017-04-28
[ 30 ]  
(Rev.1) 
Proposal for discussion on draft Recommendation L.net_infra_assessment     Huawei Technologies Co., Ltd.   Q6/5   2017-04-28
[ 29 ]  
(Rev.1) 
Impact assessment for energy services on multiple microgrids, new proposal study     Huawei Technologies Co., Ltd.   Q9/5   2017-04-28
[ 28 ]  
(Rev.1) 
Some useful information for K.psp.     China Telecommunications Corporation   Q1/5   2017-04-28
[ 27 ]  
(Rev.1) 
Draft of K.rcd "Technical requirements for residual current operated protective devices with automatic-reclosing devices for telecom uses".     China Telecommunications Corporation   Q2/5   2017-04-28
[ 26 ]  
(Rev.1) 
The 3rd draft of K.vss "Lightning protection and Earthing of Video Surveillance System".     China Telecommunications Corporation   Q1/5   2017-04-28
[ 25 ]  
 
Proposal on new recommendation L. dualpowerinput     China Unicom   Q6/5   2017-04-28
[ 24 ]  
(Rev.1) 
Proposal for ITU-T SG5 Q3 work program priority - new study period     Telstra Corporation Ltd. , Vodafone Group Services Ltd   Q3/5   2017-04-28
[ 23 ]  
 
Proposed modifications for K.52 related to new class "perfectly compliant" and body SAR for mobile handsets or devices.     National Institute of Information and Communications Technology (NICT) Mr Naito Hideyuki , NTT DOCOMO, INC.   Q3/5   2017-04-27
[ 22 ]  
 
Proposed study on safety of bridging by SPD between primary and external circuit     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-27
[ 21 ]  
 
The second draft of K.light "EMC requirements of disturbances from lighting equipment located in the telecommunication equipment room"     Nippon Telegraph and Telephone Corporation (NTT)   Q4/5   2017-04-27
[ 20 ]  
 
Measurement method of transient currents at mains ports in K.light     Nippon Telegraph and Telephone Corporation (NTT)   Q4/5   2017-04-27
[ 19 ]  
 
The 3rd draft of Recommendation K.appl4: Surge Protective Component Application Guide - Lightning Isolation Transformers     Nippon Telegraph and Telephone Corporation (NTT)   Q2/5   2017-04-27
[ 18 ]  
(Rev.1) 
Proposal of second draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2017-04-26
[ 17 ]  
(Rev.1) 
Proposal of third draft of K.soft_test "Soft error test method for telecommunication equipment"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2017-04-26
[ 16 ]  
(Rev.1) 
Proposal of third draft of K.soft_des "Design methodologies for telecommunication systems applying soft error measures"     Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation   Q5/5   2017-04-26
[ 15 ]  
 
Human exposure to electromagnetic fields (EMFs) from information and communication technologies (ICTs)     Ministère des Postes, Telecommunications et des Nouvelles Technologies de l'Information et de la Communication   Q3/5   2017-04-24
[ 14 ]  
 
Proposed 4th draft new Recommendation K.prox "Immunity requirements for telecommunication equipment in close proximity use of wireless devices"     Nippon Telegraph and Telephone Corporation (NTT)   Q4/5   2017-04-20
[ 13 ]  
 
Definitions for AC supply configurations     Bourns Limited   Q2/5   2017-04-15
[ 12 ]  
 
Updating K.20/K.21/K.45 2.1.5 and 2.1.6 test comments for C.002 six output 8/20 generator     Bourns Limited   Q2/5   2017-04-14
[ 11 ]  
 
Proposed Corrigendum to ITU-T K.56     Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes   Q1/5   2017-04-13
[ 10 ]  
 
Draft K.appl4 - High frequency signal isolation transformers version     Bourns Limited   Q2/5   2017-03-31
[ 9 ]  
 
Withdrawn     N/A     2017-03-30
[ 8 ]  
(Rev.1) 
ITU K.20 Ethernet test level     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-28
[ 7 ]  
(Rev.1) 
ITU K.44 Figure A.6.7-5 figure edit     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-28
[ 6 ]  
(Rev.1) 
ITU K.51 Edits     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-22
[ 5 ]  
(Rev.1) 
Revision proposals for K.99     EPCOS AG   Q2/5   2017-03-20
[ 4 ]  
(Rev.1) 
K.50 editorial changes and correct definitions use     Littelfuse UK Ltd.   Q4/5, Q2/5   2017-03-10
[ 3 ]  
(Rev.1-2) 
Collection and recycling of end-of-life electronic communication terminals     Ministère des Postes et Télécommunications   Q7/5   2017-03-06
Results:902 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2022-01-20