International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1C  C 

ITU-R WP1C

Spectrum Monitoring

Results:150 total items.
Result page:  Previous -  1 - 2 - 3
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 50 ]  
+Add.1 
Report of the Correspondence Group on developing a new edition of the ITU Handbook on Spectrum monitoring     Chairman, CG on Handbook     2021-05-05
[ 49 ]  
 
Report ITU-R SM.2452 - Electromagnetic field measurements to assess human exposure (2019) - EMF Correspondence Group to revise Report ITU-R SM.2452     ATDI   Q239/1   2021-05-03
[ 48 ]  
(Rev.1) 
Report ITU-R SM.2452 - Electromagnetic field measurements to assess human exposure (2019) - Working document towards a preliminary draft revision of Report ITU-R SM.2452     ATDI   Q239/1   2021-05-01
[ 47 ]  
 
Electromagnetic field measurements to assess human exposure     Narda Safety Test Solutions GmbH     2021-04-30
[ 46 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.575-2     Lithuania (Republic of)     2021-04-28
[ 45 ]  
 
Liaison statement to Working Parties 5A and 5C (copy for information to Working Parties 1A, 1C and 7D) - Proposal to initiate work under Resolution 731 (Rev.WRC-19)     WP 7C     2021-04-26
[ 44 ]  
 
Liaison statement to Working Party 1C working document towards a preliminary draft new Report ITU-R BS.[DAB-MEAS-TEC] - Measuring techniques for DAB Coverage Performance     WP 6A   Q132/6   2021-04-07
[ 43 ]  
 
Reply liaison statement on test methods for over-the-air TRP field measurements of unwanted emissions from IMT radio equipment utilizing active antennas     Director, BR     2021-03-29
[ 42 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, Working Party 1/5, ITU-R Study Group 1 Working Parties 1A and 1C, Study Group 5 Working Parties 5A and 5B and Study Group 6 Working Party 6A on strategies and policies concerning human exposure to EMF     ITU-D SG2     2021-03-23
[ 41 ]  
+Ann.1-14 
Report on the first 2019-2023 meeting of Working Party 1C (e-meeting, 24 November - 2 December 2020)     Chairman, WP 1C     2020-12-02
[ 40 ]  
 
Final list of participants Working Party 1C (e-meeting, 24 November - 2 December 2020)     Director, BR     2020-12-02
[ 39 ]  
 
List of Documents issued (Documents 1C/1 - 1C/39)     BR, Study Groups Department     2020-11-24
[ 38 ]  
 
Proposed Correspondence Group on the editorial review and maintenance of ITU-R Recommendations and Reports assigned to Study Group 1     Chairman, SG 1     2020-11-24
[ 37 ]  
 
Liaison statement on work being carried out under study in ITU-T Q3/5     ITU-T SG5     2020-11-19
[ 36 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1875-3 - DVB-T coverage measurements and verification of planning criteria     European Broadcasting Union     2020-11-17
[ 35 ]  
 
Working document towards a preliminary draft new ITU-R Report on the use of unmanned aerial vehicles for spectrum monitoring and measurements     Oman (Sultanate of)     2020-11-17
[ 34 ]  
 
Report of test results and proposal in support of the working document towards a draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile DF units in operational environment     China (People's Republic of)     2020-11-16
[ 33 ]  
 
Trial study of utilization of cuboid spectrum data of internet based spectrum monitoring system     China (People's Republic of)     2020-11-16
[ 32 ]  
 
Working document towards a preliminary draft new [Recommendation or Report] ITU-R SM.[APP10] - Reporting harmful Interference in support of Appendix 10 of the Radio Regulations     China (People's Republic of)     2020-11-16
[ 31 ]  
 
Information for the further development of the working document towards a preliminary draft new [Recommendation or Report] ITU-R SM.[APP10] - Reporting Harmful Interference in support of Appendix 10 of the Radio Regulations     Director, BR     2020-11-17
[ 30 ]  
 
Report of Correspondence Group activities on the revision of Recommendation ITU-R SM.1392-2     Chairman, CG on Rec. ITU-R SM.1392-2     2020-11-13
[ 29 ]  
 
Discussion document - Machine learning as one of signal analysis tools for classifying modulation signal     Korea (Republic of)     2020-11-13
[ 28 ]  
 
Proposed revision to Report ITU-R SM.2130-1 - Inspection of radio stations     Russian Federation     2020-11-12
[ 27 ]  
+Add.1 
Report of Rapporteur Group work after 2019 meeting of Working Party 1C on preliminary draft new Recommendation     Rapp. of RG on Performance Evaluation Mobile DF     2020-11-05
[ 26 ]  
(Rev.1) 
Working document towards a preliminary draft new Report ITU-R SM.[SMALL-SAT] - Use of small-satellite for spectrum monitoring     Chairman, CG on Use of Small-satellite     2020-11-19
[ 25 ]  
 
Working document towards a draft new Report ITU-R SM.[POPULATION_COVERAGE] - Principles for the estimation of coverage for digital terrestrial wireless networks based on population     CG on Rep. ITU-R SM.[POPULATION COVERAGE]     2020-11-03
[ 24 ]  
 
Activity Report of the Correspondence Group on developing a draft new Report on population coverage - Principles for the estimation of coverage for digital terrestrial wireless networks based on population     Chairman, CG on Rep. ITU-R SM.[POPULATION_COVERAGE     2020-11-03
[ 23 ]  
 
Activity Report of the Correspondence Group on preliminary draft new Recommendation on field strength measurement accuracy - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range     Chairman, CG on Field Strength Measurement Accu.     2020-11-03
[ 22 ]  
 
Report of Correspondence Group on a preliminary draft new Report ITU-R SM.[UAVS]     Chairman, CG UAVs     2020-11-02
[ 21 ]  
 
Report ITU-R SM.2452 "Electromagnetic field measurements to assess human exposure" (2019) - Working document towards a preliminary draft revision of Report ITU-R SM.2452     ATDI   Q239/1   2020-10-27
[ 20 ]  
 
Revision of the Spectrum Monitoring Handbook     Brazil (Federative Republic of)     2020-10-27
[ 19 ]  
 
Liaison statement from ITU-D Study Group 2 Questions 5/2 to ITU-T SG 2, ITU-T SG 5, ITU-T SG 11, ITU-T SG 12, ITU-T SG 15, ITU-T SG 16, ITU-T SG 20, ITU-R Study Group 1, Working Parties 1B, 1C, 4A, 4B, 4C, 5A, 5D, Study Group 6, Working Party 6A, Study Group 7 on the final Report of ITU-D Q5/2 and draft future work of ITU-D Q5/2 to WTDC-21     ITU-D SG2     2020-10-27
[ 18 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 WP 1/5 and ITU-R Working Parties 1A, 1C, 4A, 5A, 5B, 5C, 5D, 6A, 7A and 7B on strategies and policies concerning human exposure to EMF     ITU-D SG2     2020-10-23
[ 17 ]  
 
Proposal for revisions to preliminary draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for measuring geolocation accuracy of TDOA emitter location systems     United States of America     2020-10-20
[ 16 ]  
 
Reply liaison statement to Working Party 1A (copy to ITU-R Working Parties 1C, 4A, 4B, and 7D) - Protection of EESS (passive) remote sensors against interference caused by radiation from electrical or electronic equipment     WP 7C     2020-10-05
[ 15 ]  
 
Correspondence Group on developing a new edition of the ITU Handbook on Spectrum Monitoring     Chairman, CG on Handbook     2020-09-30
[ 14 ]  
 
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A - Recommendation ITU-R P.368-9 - Software implementations of ground-wave propagation predictions - GRWAVE and LFMF-SmoothEarth     WP 3L     2020-08-27
[ 13 ]  
 
Proposal for the development of a draft new Recommendation ITU-R SM.[M-EMISSION] - A technology for measuring emissions from multiple sources in different radio services and providing a spatial analysis of the emissions     Russian Federation     2020-06-26
[ 12 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chairman, CCV     2020-07-14
[ 11 ]  
 
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200)     ITU-T SG5     2020-07-13
[ 10 ]  
 
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other subordinate groups     Director, BR     2020-06-25
[ 9 ]  
 
Input to Working Parties 1C and 3L and to Correspondence Group 3L-7 (copied for information only to Working Parties 1A and 6A) - Revision of Recommendation ITU-R P.372 to take account of man-made noise indoors     European Broadcasting Union     2020-04-16
[ 8 ]  
 
Contribution to Correspondence Group on developing a new edition of the Handbook on Spectrum Monitoring - Proposal on how to proceed in developing the new edition of the Spectrum Monitoring Handbook     Italy     2020-04-04
[ 7 ]  
 
Reply liaison statement to Working Party 1C (copy to Working Party 1A) - Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas     WP 5D     2020-03-06
[ 6 ]  
 
Proposed organization of the work of the Study Group 1     Chairman, SG 1     2020-02-26
[ 5 ]  
 
Summary of the main results of RA-19 and CPM23-1 related to Study Group 1     Chairman, SG 1     2020-02-26
[ 4 ]  
 
Liaison statement response on test methods for over-the-air total radiated power field measurements for IMT radio equipment utilizing active antennas     Director, BR     2020-02-24
[ 3 ]  
 
Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1C - EMF exposure from bonded cellular devices     WP 6A     2020-02-11
[ 2 ]  
 
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T SG5 WP1/5, ITU-R WP 1A, WP 1C, WP 4A, WP 5A, WP 5C, WP 5D and WP 6A on strategies and policies concerning human exposure to EMF     ITU-D SG2     2019-11-29
[ 1 ]  
(Rev.1) 
Documents to be carried over from the 2015-2019 study period     WP 1C     2019-10-31
Results:150 total items.
Result page:  Previous -  1 - 2 - 3  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-07-24