International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : R23-WP4A : Contributions : 128 Recently posted -  Search Meeting Documents
   
[128]  Report on the fifty-fourth meeting of Working Party 4A (Geneva, 1-9 May 2024)

Format

Size

Posted

English

Word  

155882 bytes 2024-05-22 [128] Annex 37 - Draft reply liaison statement to Working Party 7C - Technical and operational characteristics of FSS systems for sharing and compatibility studies on WRC-27 agenda item 1.19

Word  

73544 bytes 2024-05-22 [128] Annex 36 - Working document towards a preliminary draft new [RECOMMENDATION/REPORT] ITU-R M.[FSS 7/8GHZ] - Existing and future development of systems under the fixed-satellite service in the frequency bands 7 250-7 750 MHz and 7 900-8 400 MHz

Word  

239557 bytes 2024-05-22 [128] Annex 35 - Material for the reply liaison statement to Working Party 5D - Relevant technical information to support studies under WRC-27 agenda item 1.7

Word  

64390 bytes 2024-05-22 [128] Annex 34 - Working document towards a preliminary draft new Report - Maximum permissible levels of off-axis e.i.r.p. density from non-axially symmetric or active phased array earth station antennas transmitting to geostationary-satellite orbit networks operating in the fixed-satellite service in the 27.5-30 GHz frequency band

Word  

1233392 bytes 2024-05-22 [128] Annex 33 - Working document towards a preliminary draft revision to Report ITU-R BO.2029 - Broadcasting-satellite service earth station antenna pattern measurements and related analyses

Word  

2485730 bytes 2024-05-22 [128] Annex 32 - Working document towards preliminary draft new Report ITU-R S.[FUSELAGE ATTENUATION] - Simulation results of fuselage attenuation for Aeronautical Earth Stations In Motion (A-ESIM) in the 27.5-29.5 GHz band

Word  

2994405 bytes 2024-05-16 [128] Annex 31 - Working document - Elements on mitigation measures between FSS and IMT in the frequency band 3 400-3 600 MHz  

Word  

41312 bytes 2024-05-22 [128] Annex 30 - Elements on a working document related to the operation and functionalities of NCMC for ESIMS - The functionalities and implementation of a network control and monitoring center for Earth stations in motion

Word  

338082 bytes 2024-05-22 [128] Annex 29 - Working document towards a preliminary draft new Recommendation - Maximum allowable aggregate interference levels from time-variant sources from other services into fixed-satellite service links

Word  

5026948 bytes 2024-05-22 [128] Annex 28 - Preliminary draft new Recommendation ITU-R S.[RES 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in No. 22.5L of the Radio Regulations

Word  

61935 bytes 2024-05-21 [128] Annex 27 - Working document towards a preliminary draft Handbook on best practices for the sustainable use of frequencies and associated non-GSO orbits by Space Radiocommunication Services

Word  

138134 bytes 2024-05-21 [128] Annex 26 - Working document towards a preliminary draft new Recommendation ITU-R S.[NON-GSO-MODELING]

Word  

2588440 bytes 2024-05-21 [128] Annex 25 - Working document towards a preliminary draft new Report ITU-R S.[INTERFERENCE-NGSO-NGSO/GSO-STUDIES]

Word  

64215 bytes 2024-05-21 [128] Annex 24 - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-GSO]

Word  

56483 bytes 2024-05-21 [128] Annex 23 - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO-[NGSO/GSO]] Methodology to assess average degradation in throughput and increase in unavailability for a non-geostationary system, due to the interference caused by another non-geostationary system operating co-frequency [, for frequency ranges between 10.7 GHz and 52.4 GHz]

Word  

36426 bytes 2024-05-20 [128] Annex 22 - Detailed work plan for a revision to Recommendation ITU-R S.1503 in the period 2024-2025

Word  

7573750 bytes 2024-05-20 [128] Annex 21 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1503 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations

Word  

112181 bytes 2024-05-20 [128] Annex 20 - Working document towards a preliminary draft revision of Recommendation ITU-R BO.1443-3 - Reference BSS earth station antenna patterns for use in interference assessment involving non-GSO satellites in frequency bands covered by RR Appendix 30

Word  

67789 bytes 2024-05-20 [128] Annex 19 - Working document towards a preliminary draft revision of Recommendation ITU-R S.1428-1 - Reference FSS earth-station radiation patterns for use in interference assessment involving non-GSO satellites in frequency bands between 10.7 GHz and 30 GHz

Word  

6538069 bytes 2024-05-20 [128] Annex 18 - Editorial clarifications to Recommendation ITU-R S.1503-4 - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations

Word  

1653609 bytes 2024-05-20 [128] Annex 17 - Proposed updates to working document towards a preliminary draft new Recommendation ITU-R S.[AGGREGATE EPFD KA KU]

Word  

6173370 bytes 2024-05-20 [128] Annex 16 - [Outcome of the SWG 4A1B work on EPFD limits in Article 22 / Information document in response to WRC-23 minutes on Article 22 EPFD limits]

Word  

1164560 bytes 2024-05-16 [128] Annex 15 - Elements of working document of potential WRC-27 agenda item 7 Topic XX - Possible measures to enhance protection and sustainable development of broadcasting-satellite service in Regions 1 and 3 Plan band

Word  

45413 bytes 2024-05-16 [128] Annex 14 - Draft work plan for WRC-27 agenda item 7

Word  

33560 bytes 2024-05-16 [128] Annex 13 - Possible element towards a draft liaison statement to Working Parties 1B, 3M, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - WRC-27 agenda item 1.6

Word  

42628 bytes 2024-05-16 [128] Annex 12 - Elements for a working document on WRC-27 agenda item 1.6

Word  

43602 bytes 2024-05-16 [128] Annex 11 - Draft work plan for WRC-27 agenda item 1.6

Word  

270789 bytes 2024-05-16 [128] Annex 10 - Elements towards a working document on WRC-27 agenda item 1.5

Word  

72554 bytes 2024-05-16 [128] Annex 9 - Elements for a working document towards a draft CPM text for WRC-27 agenda item 1.4

Word  

88710 bytes 2024-05-16 [128] Annex 8 - Elements of working document on WRC-27 agenda item 1.4

Word  

46255 bytes 2024-05-16 [128] Annex 7 - Draft work plan for WRC-27 agenda item 1.4

Word  

74206 bytes 2024-05-16 [128] Annex 6 - Elements of working document relating to WRC-27 agenda item 1.3

Word  

36131 bytes 2024-05-16 [128] Annex 5 - Draft work plan for WRC-27 agenda item 1.3

Word  

1065208 bytes 2024-05-16 [128] Annex 4 - Working document on WRC-27 agenda item 1.2 - Operational and technical limitations for FSS earth stations in the frequency band 13.75-14 GHz (Earth-to-space)

Word  

45148 bytes 2024-05-16 [128] Annex 3 - Draft work plan for WRC-27 agenda item 1.2

Word  

1176072 bytes 2024-05-16 [128] Annex 2 - Elements towards a working document on WRC-27 agenda item 1.1 - Use of frequency bands 47.2-50.2 GHz and 50.4-51.4 GHz (Earth-to-space) by aeronautical and maritime earth stations in motion in the fixed-satellite service

Word  

45522 bytes 2024-05-16 [128] Annex 1 - Work plan for WRC-27 agenda item 1.1    
 

Document :

ITU-R R23-WP4A  Contribution  128

Title :

Report on the fifty-fourth meeting of Working Party 4A (Geneva, 1-9 May 2024)

Date :

2024-05-09

Source :

Chair, WP 4A

Meeting :

2024-05-01

Access :

Restricted to TIES users [ITU-R]

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-05-22