Executive Summary of the Working Party 1/20  Meeting (Virtual, 6 November 2020)
   
   Numbers and other links
-  
      Participants: 95. The WP1/20 meeting was held virtually via 
      MyMeetings (The final list of participants is available TD1896).
 
- 
      Contributions: 0 to WP1/20; 49 to the Rapporteur group meetings
- 
       
         TDs (not counting the revisions): 95
- 
       
         Incoming/ Outgoing liaison statements: 20 incoming liaison statements / 9 outgoing liaison statements TD1913-R4 (also see LS database).
 
   
      
         Main discussions and results
At its meeting held virtually on 6 November 2020, WP1/20 achieved the following outcomes:
- 
      Consented Recommendations:  2
 
- Recommendations agreed for Deletion: None at this meeting
 
- 
      Other texts approved: None at this meeting
 
- 
      New work items: 11
 
 
Major accomplishments
 
Recommendations consented by WP1/20 for Last Call (AAP - Recommendation ITU-T A.8)
The ITU-T SG20 plenary meeting gave consent (AAP
) to 2 draft new ITU-T Recommendations according to Recommendation ITU-T A.8:
Revised Recommendations
 
    
      
         |  None. | 
 |  |  | 
  
   
   New Recommendations   
| Y.4211 (ex Y.ACC-PTS) 
 | Accessibility requirements for smart public transportation services 
 | Q2/20 
 | TD1929 
 | 
| Y.4476 (ex Y.IoT-rf-dlt) 
 | OID-based Resolution framework for transaction of distributed ledger assigned to IoT resources 
 | Q3/20 
 | TD1948 
 | 
 Agreed informative texts
| TD1943 A.1 [TD1944] 
 | Q2/20 
 | Recommendation 
 | Y.dt-smartfirefighting 
 | Requirements and capability framework of digital twin for smart firefighting 
 | 
| TD1945 A.1 [TD1946] 
 | Q2/20 
 | Recommendation 
 | Y.AEDS-smarthome 
 | Requirements and capability framework of abnormal event detection system for smart home 
 | 
| TD1950 A.1 [TD1951] 
 | Q2/20 
 | Recommendation 
 | Y.IoT-BC-reqts-cap 
 | IoT requirements and capabilities for support of blockchain 
 | 
| TD1952 A.1 [TD1953] 
 | Q2/20 
 | Recommendation 
 
 | Y.ElecMon-Reqts 
 | Requirements of IoT-based electric power infrastructure monitoring system
 
 | 
| TD1986 A.1 [TD1987] 
 | Q3/20 
 | Recommendation | Y.NCE.arch.EIoT | Functional Architecture Enhancement with Network Capability Exposure to Support Flexible QoS/QoE Requirements from Enterprise IoT Services and Applications | 
| TD1957 A.1 [TD1958]
 
 | Q3/20  
 | Recommendation | Y.IoT-DSE-arc 
 | Reference architecture of service exposure for decentralized services for IoT applications 
 | 
| TD1959 A.1 [TD1960]
 
 | Q3/20 
 | Recommendation | ITU-T Y.IoT-DES-fr 
 | Framework of decentralized service by using DLT and edge computing technologies for IoT devices 
 | 
| TD1965 A.1 [TD1966]
 
 | Q3/20 
 | Recommendation 
 | ITU-T Y.AI-DECCS | Functional architecture of AI enabled device-edge-cloud collaborative services for IoT and smart city | 
| TD1975 A.1 [TD1974]
 
 | Q4/20 
 | Recommendation 
 | Y.IoT-BoT-peer 
 | Capability and functional architecture of peer of blockchain of things | 
| TD1977 A.1[TD1976]
 
 | Q4/20 
 | Recommendation 
 | Y.IoT-SQMS | Requirements and functional architecture of IoT sensing quality management service 
 | 
| TD1979 A.1 [TD1978]
 
 | Q4/20 
 | Recommendation 
 | Y.CDML-arc | Reference architecture of collaborative decentralized machine learning for intelligent IoT services 
 | 
 
Map of Working Party 1/20 Meeting report
  
 
   
 
 
    
         Summary of Questions' Results
Working Party 1/20
 
       
       
         Working Party 1/20 was preceded by the Rapporteur group meetings of Q1/20, Q2/20, Q3/20 and Q4/20 from 2-5 November 2020.
Question 1/20 - "End to end connectivity, networks, interoperability, infrastructures and Big Data aspects related to IoT and SC&C" summary
The Rapporteur group meeting of Q1/20 under the chairmanship of Rapporteur Mr Jun Seob Lee took place from 2-5 November 2020. All rapporteur documents can be found at: https://www.itu.int/ifa/t/2017/sg20/exchange/rapporteurs_2-5november20/q1/
Question 1/20 discussed three Contributions. During the meeting, Q1/20 progressed on three ongoing draft Recommendations, Y.infra, Y.isms and Y.DPM-Interop. At the meeting, Q1/20 produced five output documents including the meeting report, three revised texts of ongoing draft Recommendations and one reply Liaison Statement.
The meeting report of Q1/20 (TD1921-R2) was approved at the plenary of WP1/20.
Question 2/20 - "Requirements, capabilities, and use cases across verticals" summaryThe Rapporteur group meeting of Q2/20 under the chairmanship of Rapporteur Mr Marco Carugi took place from 2-5 November 2020. All rapporteur documents can be found at: https://www.itu.int/ifa/t/2017/sg20/exchange/rapporteurs_2-5november20/q2/
The Question 2/20 meeting reviewed 14 Contributions and 7 TDs (7 incoming Liaison Statements). During the meeting, the Question made progress on 8 ongoing draft Recommendations and 1 ongoing draft Supplement. 4 new work items were submitted by Q2/20 to WP1/20 meeting for approval. It was agreed to submit draft Recommendation ITU-T Y.ACC-PTS to WP1/20 meeting for consent. 2 outgoing Liaison Statements were prepared and approved during the WP1/20 closing plenary.
The meeting report of Q2/20 (TD1922-R2) was approved at the closing plenary of WP1/20.
Question 3/20 - "Architectures, management, protocols and Quality of Service" summaryThe Rapporteur group meeting of Q3/20 under the chairmanship of Rapporteur Ms Shane He took place from 2-5 November 2020. All rapporteur documents can be found at: https://www.itu.int/ifa/t/2017/sg20/exchange/rapporteurs_2-5november20/q3/
The meeting considered in total 11 Contributions and 7 incoming Liaison Statements which were submitted to WP1/20. According to the Contributions and discussion, 6 ongoing WIs made good progress. 
During the meeting, it was agreed to submit draft Recommendation ITU-T Y.IoT-rf-dlt to WP1/20 meeting for consent, and 4 new work items with the related A.1 justifications to WP1/20 for approval. Additionally, 5 outgoing Liaison Statements were prepared and approved during the WP1/20 closing plenary.
The meeting report of Q3/20 (TD1923-R3) was approved at the closing plenary of WP1/20.
Question 4/20 - "e/Smart services, applications and supporting platforms" summaryThe Rapporteur group meeting of Q4/20 under the chairmanship of Rapporteur Mr Gyu Myoung Lee took place from 2-5 November 2020. All rapporteur documents can be found at: https://www.itu.int/ifa/t/2017/sg20/exchange/rapporteurs_2-5november20/q4/ 
Question 4/20 discussed 17 Contributions. At the meeting, Q4/20 produced 20 output documents including the meeting report and other documents as follows: 8 ongoing draft Recommendations, 3 initial draft Recommendations, 4 Living lists and 1 outgoing Liaison Statement.
The meeting report of Q4/20 (TD1924-R1) was approved at the closing plenary of WP1/20.
Work Programme 
       
       The updated work programme can be found here. 
         
  
    
          
         
            Rapporteur group meetings (including e-meetings)
 
          
         - Click 
               here for the complete list of SG20 management team
- Click here for the complete list of SG20 Rapporteurs and Associate Rapporteurs.
- Click 
               here for the complete list SG20 Liaison Rapporteurs and other representative roles.
 
  
         
            
               
                  
         Future events and dates of next ITU-T Study Group 20 meetings: 
         
- The next SG20 meeting will take place virtually on 16 December 2020 and the only matter for discussion will be the consideration for Decision on TAP Recommendations that were Determined.
- The next meeting of ITU-T SG20 is planned to take place virtually in May 2021.