International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site Map Contact us Print Version
 
Home : ITU-T Home : Study Groups : Study Group 13
   
Study Group 13 - Rapporteur Meetings
WP Question Date Place / Host Subject Documents
1/13, 2/13, 3/13, 4/13 and 5/13 All 24 September – 9 October 2009, supported by teleconferences on 6 and 7 October 2009 E-meeting To review the handbook “Converging Networks” by K. Mainwaring COM 13–R 11
3/13 8/13 25 October – 7 November 2009 E-meeting (Mr. W.J. Choi (KT, Korea) will lead the e-meeting.) Progress the work on draft Recommendations Y.SMF, Y.MM-VPN, Y.MM-WAU, Y.MM-WAW and Y.MMS TD 70
(PLEN/13)
1/3 1/3 26-30 October 2009
IPTV-GSI event*
Geneva, Switzerland / ITU/TSB
  • to progress work on NGN-roadmap and Global ICT fora/consortia survey.
  • to progress the coordination work on IPTV standardization
TD 71
(PLEN/13)
2/13 12/13 26-30 October 2009
IPTV-GSI event*
Geneva, Switzerland / ITU/TS

Q.12/13 will deal with six draft recommendations (Y.iptvintwrm, Y.ipev, Y.UbiNet-hn, Y.NGN-vehicle, Y.msc-hn-ngn, Y.NGN-Web), the current living list item (Annex A of Q.12/13 report) and work items (Annex B of Q.12/13 report) of Q.12/13, but not limited to.

Note 1: The joint meetings with Q.21/16 for home networking will be held at the IPTV-GSI event.

Note2: Teleconference meetings with relevant questions (e.g., Q.3/13, etc.) on service aspects will be arranged.

TD 84 R1
(PLEN/13)
4/13 17/13 16-20 November 2009 Sanya, China/ FiberHome Advance the work on Y.dpireq TD 64
(PLEN/13)
5/13 21/13 16-20 November 2009 Salt Lake City, USA, with 2nd FG-FN
  • To provide FG-FN the feedback from September 2009 SG13 meeting and NGN-GSI event
  • To summarize the 2nd Focus Group meeting and reviews the items need to be shared with SG13 and other SGs
TD 74 R1
(PLEN/13)
2/13 3/13 17-20 November 2009 Sanya, China Y.NGN-MCC "NGN service requirements to support MCC services" (17 November) and Y.NGN-SIDE-Req "Requirements for NGN Service Integration & Delivery Environment" (18-20 November). TD 84 R1
(PLEN/13)
3/13 9/13 18-20 November 2009 Sanya, China
  • Priority is to progress draft supplement Y.MC-SCEN (in view of its approval in January 2010) and Y.MC-REQ
  • Progress work on Y.MC-ID and Y.MC-ARCH
TD 70
(PLEN/13)
5/13 19/13 18-20 November 2009 Sanya, China
  • To resolve the editor’s note in Y.dsnscen and freeze the technical part of the draft.
  • To resolve the editor’s note in Y.dsnsreq.
TD 74 R1
(PLEN/13)
1/13 1/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • to progress work on Description of Capability Set, NGN and MM-roadmaps and Global ICT fora/consortia survey
  • to finalize draft Supplement TRY.FC-survey for approval
  • to progress the work on NGN project management tool
  • to progress the coordination work on mobility management and ICT & climate change
  • to progress the coordination work on IPTV standardization
TD 71
(PLEN/13)
1/13 2/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Progress work on ICT & Climate Change Work Item
  • Progress work on multi- vendor interoperability definition
  • Consent on Y.iptvterms
TD 71
(PLEN/13)
2/13 3/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Progress of ongoing and new work relevant for Q.3/13 program, including ongoing draft recommendations, and consideration of any new input with respect to Q.3/13 work objectives in the new study period (including other areas as described in clause 6 of Q.3/13 Sept 09 agenda, e.g. Climate Change and ICT Requirements, possible revision 2 of Y.2201 etc).
  • Joint activities include:
    • Q.1/13 (and other Questions): Mobility roadmap
    • Q.12/13, Q.13/13, Q.14/13, Q.5/13: NGN service platform aspects (including at least Y.NGN-SIDE-Req, Y.NGN-SON, Y.ipev, Y.NGN-WEB)
    • Q.2/13, Q.5/13, SG11 Questions: interoperability
    • To be confirmed: Q.4/13: Policy based accounting and charging in NGN (Y.2233 Rev.1)
    • To be confirmed: Q.5/13, Q.12/13 (possibly, other IPTV-GSI related Questions): IPTV (Network control, Interworking)
  • To be confirmed: Q.19/13 and Q.5/13: relationship of DSN activities in Q.19/13 with activities on NGN Requirements and Architecture evolution
TD 84 R1
(PLEN/13)
4/13 4/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Complete Y.IPTV-TM for consent
  • Advance the work on all other study items under the responsibility of Q.4/13
TD 64
(PLEN/13)
3/13 5/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Prepare Y.NACF rev1 and Y.NGN-FRA rev1 in view of consent on 29 January 2010
  • Progress the work on draft recommendations and supplements under Q.5/13 responsibility
TD 70
(PLEN/13)
5/13 7/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Q7/13 will deal with mainly the on-going draft recommendations and living list items, but are not limited to. The joint meetings also may occur during the NGN-GSI event to coordinate Q7’s work with other relevant groups
TD 74 R1
(PLEN/13)
3/13 8/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Progress the work on draft Recommendations
    - Y.SMF
    - Y.MM-VPN
    - Y.MM-WAU
    - Y.MM-WAW
    - Y.MMS
TD 70
(PLEN/13)
3/13 9/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Finalize draft Supplement Y.MC-SCEN in view of its approval on 29 January 2010
  • Progress the work on draft Recommendations Y.MC-REQ, Y.MC-ARCH and Y.MC-ID
TD 70
(PLEN/13)
3/13 11/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Progress the work on draft Recommendation Y.MM-WAW
  • Develop new work items on FMC
TD 70
(PLEN/13)
2/13 12/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • six draft Recommendations (Y.iptvintwrm, Y.ipev, Y.UbiNet-hn, Y.NGN-vehicle, Y.msc-hn-ngn, Y.NGN-Web)
  • the current living list item (Annex A of Q.12/13 report)
  • Q.12/13work items (Annex B of Q.12/13 report), but not limited to.
TD 84 R1
(PLEN/13)
2/13 13/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Y.ngn-nce-scen
TD 84 R1
(PLEN/13)
2/13 14/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Y.iptvbs (IPTV service brokering service scenarios),
  • Y.pass (Heterogeneous user application profiles adaptation service scenario over NGN),
  • Y.iras (IT Service Risk analysis service scenario over NGN),
  • Y.gms (GHG monitoring Service Scenario on NGN),
  • Y.son-ngn (Service Overlay network and service scenario on NGN),
  • Y.sof (Service scenarios over FMC)
  • New work items
TD 84 R1
(PLEN/13)
4/13 16/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Complete Y.ngnIdMreq for determination
  • Advance the work on all other study items under the responsibility of Q.16/13
TD 64
(PLEN/13)
4/13 17/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • Complete Y.dpireq for consent
  • Advance the work on Y.dpifr
TD 64
(PLEN/13)
5/13 19/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • To approve the Y.dsnscen
  • To consent the Y.dsnreq
  • To progress the Y.dsnarch
  • To progress the Y.dsntocf
TD 74 R1
(PLEN/13)
5/13 20/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • To progress draft Recommendation: Y.PTDN
  • To progress draft Recommendations Y.iSCP-req ,Y.iSCP-arch, and draft supplement Y.iSCP_scen
  • To discuss other related Recommendations.
TD 74 R1
(PLEN/13)
5/13 21/13 18-29 January 2010 NGN-GSI event** Geneva, Switzerland / ITU/TSB
  • to publicize and to collect feedbacks of the output of the 2nd FG-FN meeting
TD 74 R1
(PLEN/13)
5/13 21/13 29 March - 2 April 2010 Tokyo, Japan with 4th FG-FN
  • To provide FG-FN the feedback from January 2010 NGN-GSI event
  • To summarize the 3rd Focus Group meeting and reviews the items need to be shared with SG13 and other SGs
TD 74 R1
(PLEN/13)
           

* IPTV GSI event 26–30 October 2009, Geneva, Switzerland
** NGN GSI event 18–29 January 2010, Geneva, Switzerland


 

Top - Feedback - Contact Us -  Copyright © ITU 2010 All Rights Reserved
Contact for this page : TSB EDH
Updated : 2010-05-21