International Telecommunication Union   ITU
عربي  |  中文  |  Español  |  Français  |  Русский
 
 Advanced Search Advanced Search Site map Contact us Print version
  Home : ITU-R : Space Services : SNL : Bringing into use
Radiocommunication Sector (ITU-R)  
Bringing into use of satellite network frequency assignments 
Bringing into use of satellite network frequency assignments

This table gives information about the date of bringing into use of planned and non-planned satellite network frequency assignments.

This list displays all Notifications of satellite networks published in PART I-S, or published As received which have been confirmed brought into use.

The Bureau is also publishing bringing into use information submitted in conjunction with a submission under § 4.1.12/4.2.16 of Appendices 30 and 30A (Part B) or § 6.17 of Appendix 30B (A6B).

Please note that this table is for information only. The official confirmation of bringing into use is the publication in PART II-S of the BR  IFIC.

For more information about the procedure of bringing into use, please refer to the Circular letter CR/343. 

Meaning of the symbol in the column "Status":

  N : Not yet confirmed, the date in the column "Date of bringing into use" is the foreseen date
  I : Initial information on bringing into use
  C : Confirmed brought into use, No. 11.44B/11.44C/11.44D/11.44E conditions (as applicable) fulfilled.

For any comments or information,  please contact us 

Last update of the database: 16.04.2024 - The update is done normally every 2 weeks.

Your query :  All networks
Query the database  - Print version  - Explanations  - Export in txt format  - Export in Excel format 

Total line = 1600/3231
Go to page : 1234567891011121314151617
Satellite Name
(SNL Part B)
ADMORGLong_nomDate of bringing
into use
StatusExpiry Date for
Bringing Into Use
Provision
up down up down up down up down up down up down up down up down 
PALAPA-C3-K  INS  118 15.07.2006 C  11.2  
PALAPA-C4  INS  150.5 17.01.1996 C  11.2  
PALAPA-C4-A  INS  150.5 20.01.2014 C  11.2  
PALAPA-C4-B  INS  150.5 11.12.2016 C  11.2  
PALAPA-C4-K  INS  150.5 15.08.2015 C  11.2  
PALAPA-B3 TT&C  INS  118 04.08.2011 C  11.2  
PALAPA-B3-EC  INS  118 16.03.2006 C  11.2  
IRANSAT-B-43.5E  IRN  43.5 06.10.2023 C  11.2  
IRANSAT-43.5E  IRN  43.5 15.06.2017 C  11.2  
IRANSAT-77.5E  IRN  77.5 02.09.2025 N 02.10.2025 11.2  
DOUSTI  IRN  N-GSO 08.11.2024 N 08.11.2024 11.2  
ZOHREH-2  IRN  26 07.06.1995 C  11.2  
ZOHREH-2  IRN  26 08.02.2010 C  11.2  
ZOHREH-2  IRN  26 14.07.2010 C  11.2  
IRNDBS-2  IRN  26 26.03.2006 C  5.1.2  
IRNDBS-2  IRN  26 26.03.2006 C  5.1.6  
IRN-ERS-1  IRN  N-GSO 11.12.2025 N 11.12.2025 11.2  
NSL-1  ISR  N-GSO 01.04.2023 C  11.2  
VENUS  ISR  N-GSO 02.08.2017 C  11.2  
EROS  ISR  N-GSO 01.02.2000 C  11.2  
EROS-C  ISR  N-GSO 16.05.2023 C  11.2  
AMS-B2-13.8E  ISR  13.8 14.02.2019 C  11.2  
AMS-B7-13.8E  ISR  13.8 14.02.2019 C  11.2  
AMS-B7-13.8E  ISR  13.8 15.08.2019 C  11.2  
AMS-BSS-B1-4W  ISR  -4 20.02.2017 C  5.1.2  
AMS-C11-78E  ISR  78 14.03.2024 I 28.03.2024 11.2  
AMS-C8-17E  ISR  17 17.11.2019 C  11.2  
AMS-CK-17E  ISR  17 17.11.2019 C  11.2  
AMS-CK-4W  ISR  -4 01.03.2017 C  11.2  
AMS-CK-4W  ISR  -4 20.06.2008 C  11.2  
AMOS 1-B  ISR  -4 31.08.1996 C  11.2  
AMOS 1-B  ISR  -4 24.03.2001 C  11.2  
AMOS 2-B  ISR  -4 01.01.2004 C  11.2  
AMOS 2-B  ISR  -4 01.08.2008 C  11.2  
AMOS 3-A  ISR  -4 01.06.2008 C  11.2  
AMOS 3-A  ISR  -4 01.06.2011 C  11.2  
AMOS-II 4W  ISR  -4 01.10.2003 C  A30B#8.1  
AMS-30B-4W  ISR  -4 20.02.2017 C  A30B#8.1  
AMS-30B-65E  ISR  65 06.04.2016 C  A30B#8.1  
AMS-4-65E  ISR  65 23.12.2013 C  11.2  
CUTE-I  J   N-GSO 30.06.2003 C  11.2  
ALOS-4  J   N-GSO 19.03.2026 N 19.03.2026 11.2  
ALOSSAR  J   N-GSO 24.01.2006 C  11.2  
BC-MMO  J   N-GSO 26.09.2025 N 26.09.2025 11.2  
JBSS-1N  J   109.85 15.04.2003 C  5.1.6  
JCSAT-1  J   150 15.06.1991 C  11.2  
ASNARO  J   N-GSO 06.11.2014 C  11.2  
ASNARO-2  J   N-GSO 18.01.2018 C  11.2  
ASTRO-E  J   N-GSO 10.07.2005 C  11.2  
ASTRO-H  J   N-GSO 17.02.2016 C  11.2  
AOS  J   N-GSO 27.01.2024 N 27.01.2024 11.2  
EQUULEUS  J   N-GSO 16.11.2022 C  11.2  
ERG  J   N-GSO 20.12.2016 C  11.2  
UNIFORM-1  J   N-GSO 26.08.2014 C  11.2  
SUPERBIRD-A  J   158 01.12.1992 C  11.2  
CE-SAT  J   N-GSO 23.06.2017 C  11.2  
CE-SAT-B  J   N-GSO 29.10.2020 C  11.2  
CE-SAT-B  J   N-GSO 16.01.2025 N 16.01.2025 11.2  
QZSS  J   N-GSO 01.06.2017 C  11.2  
QZSS-1  J   N-GSO 11.09.2010 C  11.2  
BSAT-2  J   110 01.12.2000 C  5.1.2  
BSAT-2  J   110 01.12.2000 C  5.1.6  
BSAT-2N  J   109.85 01.12.2000 C  5.1.2  
BSAT-2N  J   109.85 01.12.2000 C  5.1.6  
BSAT-109.85  J   109.85 01.08.2000 C  11.2  
BSAT-109.85  J   109.85 05.02.2016 C  11.2  
BSAT-110  J   110 01.08.2000 C  11.2  
BSAT-110  J   110 05.02.2016 C  11.2  
IKAROS  J   N-GSO 21.05.2010 C  11.2  
INDEX-1  J   N-GSO 23.08.2005 C  11.2  
JCSAT-1R  J   150 17.02.1997 C  11.2  
JCSAT-1R  J   150 01.12.2005 C  11.2  
JCSAT-2  J   154 15.06.1991 C  11.2  
JCSAT-2  J   154 20.07.1995 C  11.2  
JCSAT-2R  J   154 01.12.2005 C  11.2  
JCSAT-2R  J   154 28.03.2002 C  11.2  
JCSAT-3A  J   128 29.08.1995 C  11.2  
JCSAT-3A  J   128 01.12.2005 C  11.2  
JCSAT-3B  J   124 01.04.1998 C  11.2  
JCSAT-3B  J   124 01.12.2005 C  11.2  
JCSAT-FO-124E  J   124 27.12.2005 C  11.2  
JCSAT-FO-128E  J   128 27.12.2005 C  11.2  
JCSAT-FO-132E  J   132 27.12.2005 C  11.2  
JCSAT-FO-132E  J   132 26.12.2007 C  11.2  
JCSAT-FO-136E  J   136 27.12.2005 C  11.2  
JCSAT-FO-150E  J   150 27.12.2005 C  11.2  
JCSAT-FO-154E  J   154 27.12.2005 C  11.2  
JCSAT-T-127.5E  J   127.5 30.11.2002 C  11.2  
JCUBES-A  J   N-GSO 28.03.2019 C  11.2  
JCUBES-B  J   N-GSO 28.03.2019 C  11.2  
JCUBES-B  J   N-GSO 11.04.2024 N 11.04.2024 11.2  
JMCS-1  J   144 24.02.1998 C  11.2  
JMCS-144X  J   144 12.01.2025 N 12.01.2025 11.2  
JMCS-162E  J   162 12.06.2018 C  11.2  
JMCS-1R  J   144 01.11.2003 C  11.2  
JMCS-2  J   110 24.02.2001 C  11.2  
RISESAT  J   N-GSO 24.05.2014 C  11.2  
RAISE-2  J   N-GSO 06.11.2027 N 06.11.2027 11.2  
PRISM1  J   N-GSO 23.01.2009 C  11.2  
PRISM2  J   N-GSO 21.11.2013 C  11.2  
PLANET-C  J   N-GSO 21.05.2010 C  11.2  
QZSS-GS4  J   127 29.08.2017 C  11.2  
QZSS-GS-A1  J   90.5 12.03.2025 N 13.03.2025 11.2  
QZSS-GS-A4  J   127 12.03.2025 N 13.03.2025 11.2  
QZSS-GS-ISR1  J   90.5 12.03.2025 N 07.01.2027 11.2  
QZSS-GS-ISR4  J   127 12.03.2025 N 07.01.2027 11.2  
QZSS-ISR  J   N-GSO 12.03.2025 N 07.01.2027 11.2  
ALOS  J   N-GSO 24.01.2006 C  11.2  
ALOS  J   N-GSO 26.05.2008 C  11.2  
NFP-SAT-Y16-150E  J   150 01.09.2022 C  A30B#8.1  
ADRAS-J  J   N-GSO 18.05.2028 N 18.05.2028 11.2  
XI-IV  J   N-GSO 30.06.2003 C  11.2  
XI-V  J   N-GSO 27.10.2005 C  11.2  
SUPERBIRD-A2  J   158 07.05.2004 C  11.2  
ALOS-2  J   N-GSO 24.05.2014 C  11.2  
JCSAT-1  J   150 20.07.1995 C  11.2  
HTV-R  J   N-GSO 11.09.2009 C  11.2  
GEOTAIL  J   N-GSO 10.11.1992 C  11.2  
QZSS-A  J   N-GSO 12.03.2025 N 13.03.2025 11.2  
SJC-1  J   124 01.04.1998 C  11.2  
TAIKI-109.65  J   109.65 03.03.2001 C  11.2  
TAIKI-109.65  J   109.65 15.05.2006 C  11.2  
TAIKI-109.65  J   109.65 05.02.2016 C  11.2  
TAIKI-109.65-34.5  J   109.65 01.12.2000 C  5.1.6  
SUPERBIRD-A2-R  J   158 01.11.2008 C  11.2  
SUPERBIRD-A2-R  J   158 26.12.2009 C  11.2  
SUPERBIRD-B  J   162 27.02.1992 C  11.2  
SUPERBIRD-B  J   162 01.04.1996 C  11.2  
SUPERBIRD-B2  J   162 17.01.2002 C  11.2  
SUPERBIRD-B2-KA  J   162 17.01.2002 C  11.2  
SUPERBIRD-B2-R  J   162 01.11.2008 C  11.2  
SUPERBIRD-C  J   144 28.07.1997 C  11.2  
SUPERBIRD-C  J   144 03.06.2000 C  11.2  
SUPERBIRD-C2  J   144 01.11.2008 C  11.2  
SERVIS-2  J   N-GSO 02.06.2010 C  11.2  
STARS  J   N-GSO 23.01.2009 C  11.2  
QSAT  J   N-GSO 06.11.2014 C  11.2  
SOLAR-B  J   N-GSO 23.09.2006 C  11.2  
SOLAR-B  J   N-GSO 31.07.2008 C  11.2  
SOLAR-B  J   N-GSO 15.11.2008 C  11.2  
SOLAR-B  J   N-GSO 27.10.2009 C  11.2  
N-STAR-A  J   132 01.06.1995 C  11.2  
N-STAR-A  J   132 01.04.2002 C  11.2  
N-STAR-A  J   132 01.12.2005 C  11.2  
N-STAR-A2  J   132 27.12.2005 C  11.2  
N-STAR-B  J   136 01.04.2000 C  11.2  
N-STAR-B  J   136 01.04.2002 C  11.2  
N-STAR-B  J   136 01.08.1995 C  11.2  
N-STAR-B  J   136 01.12.2005 C  11.2  
N-STAR-B  J   136 01.02.1996 C  11.2  
N-STAR-B2  J   136 27.12.2005 C  11.2  
N-STAR-E  J   136 15.10.2007 C  11.2  
N-STAR-F  J   132 15.10.2007 C  11.2  
N-SAT-110  J   110 07.10.2000 C  11.2  
N-SAT-110E  J   110 07.10.2000 C  11.2  
N-SAT-124E  J   124 10.07.2012 C  11.2  
N-SAT-127W  J   -127 25.12.2003 C  11.2  
N-SAT-128  J   128 29.08.1995 C  11.2  
N-SAT-143.72E  J   143.72 24.11.2008 C  11.2  
N-SAT-146  J   144 28.07.1997 C  11.2  
N-SAT-154E  J   154 17.02.2016 C  11.2  
N-SAT2-162E  J   162 10.12.2015 C  11.2  
N-SAT2-93E  J   93 25.02.2017 C  11.2  
N-SAT-82E  J   82 15.04.2013 C  11.2  
N-SAT-90.75E  J   90.75 01.11.2012 C  11.2  
N-SAT-HEO2  J   N-GSO 28.12.2007 C  11.2  
N-SAT-Y12-110E  J   110 25.03.2017 C  11.2  
N-SAT-Y12-128E  J   128 22.02.2019 C  11.2  
N-SAT-Y12-136E  J   136 22.02.2019 C  11.2  
N-SAT-Y12-144E  J   144 12.11.2018 C  11.2  
N-SAT-Y12-150E  J   150 23.08.2016 C  11.2  
N-SAT-Y12-162E  J   162 22.02.2019 C  11.2  
N-SAT-Y15-124E  J   124 10.10.2019 C  11.2  
N-SAT-Y15-128E  J   128 26.07.2019 C  11.2  
N-SAT-Y15-128E  J   128 08.12.2020 C  11.2  
N-SAT-Y15-132E  J   132 28.03.2022 C  11.2  
N-SAT-Y15-136E  J   136 05.01.2022 C  11.2  
N-SAT-Y15-150E  J   150 01.12.2020 C  11.2  
N-SAT-Y15-162E  J   162 14.09.2021 C  11.2  
N-SAT-Y15-93E  J   93 14.09.2021 C  11.2  
N-SAT-Y15-93E  J   93 12.05.2022 C  11.2  
N-SAT-Y15-93E  J   93 12.05.2022 I 26.05.2022 11.2  
N-SAT-Y17-90.75E  J   90.75 09.03.2021 C  11.2  
N-SAT-Y17-90.75E  J   90.75 01.01.2024 N 01.01.2024 11.2  
N-SAT-Y18-127W  J   -127 23.01.2025 N 23.01.2025 11.2  
MUSES-C  J   N-GSO 09.05.2003 C  11.2  
NB-SAT-109.65-OD-EV  J   109.65 10.06.2018 C  5.1.2  
NB-SAT-109.65-OD-EV  J   109.65 10.06.2018 C  5.1.6  
NB-SAT-109.85AA  J   109.85 20.04.2008 C  5.1.2  
NB-SAT-109.85-OD-EV  J   109.85 10.06.2018 C  5.1.2  
NB-SAT-109.85-OD-EV  J   109.85 10.06.2018 C  5.1.6  
NBSAT-109.85-WB  J   109.85 08.09.2021 C  5.1.6  
NB-SAT-110AA  J   110 20.04.2008 C  5.1.2  
NB-SAT-110-EV  J   110 10.06.2018 C  5.1.2  
NB-SAT-110-EV  J   110 10.06.2018 C  5.1.6  
NB-SAT-110-OD  J   110 10.06.2018 C  5.1.6  
NB-SAT-110-OD  J   110 10.06.2018 C  5.1.2  
NBSAT-110-WB  J   110 08.09.2021 C  5.1.6  
NBSAT-21BX  J   109.85 10.06.2018 C  11.2  
Total line = 1600/3231
Go to page : 1234567891011121314151617

 

Top - Feedback - Contact us -  Copyright © ITU 2024 All Rights Reserved
Contact for this page : Webmaster
Updated : 2024-04-23