Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG 15 : Réunion 2014-03-24 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG 15  C (2014-03-24) 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Période d'études 2013

Réunion  du 2014-03-24 au 2014-04-04

Lieu : Suisse [Genève]

Autres réunions : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Resultats:25 documents
Contributions  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 775 ]  
(Rev.1) 
G.fast: BT TAP comments on G.9700 (ex G.fast-PSD)     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 774 ]  
 
Parameterization of L2.1 multi-step entry procedure     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 773 ]  
 
G.997.1: On extending G.997.1 to support PMA functionality     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 772 ]  
 
G.fast: On Reverse Power Feeding system noise requirements     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 767 ]  
 
G.vdsl2, G.inp: Stability issues and mitigation of non-stationary noise in LPM     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 766 ]  
 
G.fast: Additional requirements to address specifics of RPF noise     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2014-03-11
[ 764 ]  
 
G.vdsl: New 998ADE17 Band Plan for VDSL2     China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 763 ]  
 
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 762 ]  
 
G.fast: On TIGA and SRA     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 756 ]  
 
Proposal of a new study item: "Plant solutions for FTTdp (Fiber To The distribution point) architecture"     Italy   Q4/15, Q16/15   2014-03-11
[ 751 ]  
 
G.fast: Proposed Liaison to ETSI TM6 on RPF Noise     Alcatel-Lucent France   Q4/15   2014-03-11
[ 750 ]  
(Rev.1) 
VDSL2 and G.FAST need a flexible protection mechanism against time varying noise.     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-11
[ 749 ]  
 
G.fast: Data rate impact and requirements of Reverse Power Feeding systems     Alcatel-Lucent France   Q4/15   2014-03-11
[ 748 ]  
 
G.inp: G.vdsl: VDSL2 Low Power Mode: Mandatory support of Virtual Noise     Alcatel-Lucent France   Q4/15   2014-03-11
[ 746 ]  
 
G.fast: DTU's mapping and ACK bit-map structure (section 9.5)     Sckipio Technologies S.I. Ltd.   Q4/15   2014-03-11
[ 745 ]  
 
G.fast: Alcatel-Lucent TAP comments on G.9700 (ex G.fast-PSD)     Alcatel-Lucent France   Q4/15   2014-03-11
[ 665 ]  
 
G.fast: On the scope of G.fast Amendment 1     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-10
[ 664 ]  
 
G.fast: On standardisation of advanced UPBO methods for vectored G.fast     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2014-03-10
[ 607 ]  
 
IPR statement.     Sckipio Technologies S.I. Ltd.   Q4/15   2014-03-10
[ 578 ]  
 
G.fast: Comments on link-state transition     ZTE Corporation   Q4/15   2014-03-10
[ 511 ]  
 
G.inp: Comparison of L2.1 power reduction methods     TQ DELTA. LLC   Q4/15   2014-03-07
[ 509 ]  
 
G.hn, G.vdsl, G.fast : Objectives and Tools for PLC to DSL Interference Mitigation     Metanoia Technologies, Inc.   Q4/15, Q18/15   2014-03-07
[ 490 ]  
 
IPR: Ikanos Communications on IPR declarations on G.9700 and G.9701.     Ikanos Communications   Q4/15   2014-03-07
[ 480 ]  
 
G.inp: Proposed edits to help complete the VDSL LPM Amendment     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , Ikanos Communications   Q4/15   2014-03-07
[ 466 ]  
 
Considerations on DS/US adjustment for the VDSL2     China Unicom , Huawei Technologies Co. Ltd.   Q4/15   2014-03-07
Resultats:25 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-3-29